Claim Missing Document
Check
Articles

Found 3 Documents
Search

Non-Formal Education Financing Management (Analysis of The Concept and Its Implications for Improving the Quality of Education) Lau, Elfreda Aplonia; Jonathan, Robin; Militina, Theresia; Gupta, Sachin
Journal of Nonformal Education Vol. 10 No. 2 (2024): Equivalency education and community education
Publisher : Universitas Negeri Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15294/jone.v10i2.13582

Abstract

This study aims to analyze the basic concept of education financing and its implications for improving the quality of education. This study uses the library research method.  The results of the study show that improving the quality of an educational institution / institution is the hope and desire of the community who uses educational services. Therefore, to realize this, various strategic efforts have been made by the government and the community as education managers and stakeholders. Among them, what the government has done is to design national education standards.  Based on the National Education System Law Number 20 of 2003, there are 8 national standards that aim to improve the quality of an educational institution. Based on government regulations, one of the eight national education standards is the financing standard. Education financing is the most important and inseparable thing in education management activities.   So, among other things, the government's policy is to roll out BOS funds at the school level. Education financing and funding managed by schools/madrasas must be transparent in order to create accountability. If it can be accounted for, the credibility of the educational institution will increase. If it is credible, it will automatically improve the quality of educational institutions.  To achieve this, the government regulates the standards for term financing.
Pengukuran Waktu Kerja Karyawan Bengkel Hardchrome CV. Abad 21 Samarinda Jonathan, Robin
JEMI is managed and published by the Management Study Program, Faculty of Economics and Business, Kutai Kartanegara University. Institutional legality is reflected in the ISSN number: 1411-9560 published by LIPI in 2003 as a manifestation of the comm Vol 2008 No 3 (2008)
Publisher : FAKULTAS EKONOMI DAN BISNIS UNIKARTA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53640/jemi.v2008i3.1065

Abstract

The research objective was to determine the time of labor standards hardchrome coating at the CV. Abad 21 in Samarinda. Research carried out for 2 months at the CV. Abad 21 in Samarinda with the object of research islimited regarding the calculation of working time for coating hardchrome workmanship. Data collected in the study include: an overview of hardchrome business, primary and secondaryobservational data, and the amount of labor. Data collection techniques used were: (1) observation, (2) interview, (3) documentation, and (4) the study of literature, namely the collection of data fromreports or records owned by CV. Abad 21 in Samarinda. The results indicated that: (1) the average time hardchrome coating at the CV. Abad 21 in Samarindaduring 5 times of observation is 501 minutes or 8 hours 21 minutes (2) the normal time hardchromecoating at the CV. Abad 21 in Samarinda is 501 minutes or 8 hours 21 minutes; and (3) coatinghardchrome standard time at the CV. Abad 21 in Samarinda by using the leeway factor of 15% ofnormal time is 576 hours or 9 hours 36 minutes.
Pengukuran Waktu Kerja Karyawan Bengkel Hardchrome CV. Abad 21 Samarinda Jonathan, Robin
JEMI is managed and published by the Management Study Program, Faculty of Economics and Business, Kutai Kartanegara University. Institutional legality is reflected in the ISSN number: 1411-9560 published by LIPI in 2003 as a manifestation of the comm Vol 2008 No 3 (2008)
Publisher : FAKULTAS EKONOMI DAN BISNIS UNIKARTA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53640/jemi.v2008i3.1065

Abstract

The research objective was to determine the time of labor standards hardchrome coating at the CV. Abad 21 in Samarinda. Research carried out for 2 months at the CV. Abad 21 in Samarinda with the object of research islimited regarding the calculation of working time for coating hardchrome workmanship. Data collected in the study include: an overview of hardchrome business, primary and secondaryobservational data, and the amount of labor. Data collection techniques used were: (1) observation, (2) interview, (3) documentation, and (4) the study of literature, namely the collection of data fromreports or records owned by CV. Abad 21 in Samarinda. The results indicated that: (1) the average time hardchrome coating at the CV. Abad 21 in Samarindaduring 5 times of observation is 501 minutes or 8 hours 21 minutes (2) the normal time hardchromecoating at the CV. Abad 21 in Samarinda is 501 minutes or 8 hours 21 minutes; and (3) coatinghardchrome standard time at the CV. Abad 21 in Samarinda by using the leeway factor of 15% ofnormal time is 576 hours or 9 hours 36 minutes.