Miszaina Osman
Universiti Tenaga Nasional

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Battery energy storage system (BESS) design for peak demand reduction, energy arbitrage and grid ancillary services Wan Syakirah Wan Abdullah; Miszaina Osman; Mohd Zainal Abidin Ab Kadir; Renuga Verayiah
International Journal of Power Electronics and Drive Systems (IJPEDS) Vol 11, No 1: March 2020
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (590.038 KB) | DOI: 10.11591/ijpeds.v11.i1.pp398-408

Abstract

Renewable Energy (RE) penetration is a new phenomenon in power systems. In the advent of high penetration of RE in the systems, several issues have to be addressed especially when it involves the stability and flexibility of the power systems. Battery Energy Storage System (BESS) has gained popularity due to its capability to store energy and to serve multiple purposes in solving various power system concerns. Additionally, several BESS can be combined to operate as Virtual Power Plant (VPP). This study will involve the design and implementation of BESS for five potential customer sites for the demonstration project and to be possibly integrated into one VPP system. The study is expected to demonstrate bill savings to the customers with BESS due to peak demand reduction and energy arbitrage savings.Renewable Energy (RE) penetration is a new phenomenon in power systems. In the advent of high penetration of RE in the systems, several issues have to be addressed especially when it involves the stability and flexibility of the power systems. Battery Energy Storage System (BESS) has gained popularity due to its capability to store energy and to serve multiple purposes in solving various power system concerns. Additionally, several BESS can be combined to operate as Virtual Power Plant (VPP). This study will involve the design and implementation of BESS for five potential customer sites for the demonstration project and to be possibly integrated into one VPP system. The study is expected to demonstrate bill savings to the customers with BESS due to peak demand reduction and energy arbitrage savings.
Comparing horizontal versus vertical arrangement on the ground resistance values Syakir Azim Shamsul; Usman Muhammad; Fazlul Aman; Normiza Mohamad Nor; Miszaina Osman
Bulletin of Electrical Engineering and Informatics Vol 13, No 6: December 2024
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/eei.v13i6.7944

Abstract

It is important to compare the horizontal electrodes versus vertical ground electrodes particularly when there is limited area to extend the horizontal ground electrode and hard soil at the deeper soil in order to install the vertical rod electrode. Although all of these can be assessed by computational work, much work has shown that computed resistance values are different than measured resistance values and these computational softwares are not always available to the users. For these reasons, the aim of this paper is to address this shortfall by considering two sites with two-layer soil resistivity model where site 1 with upper layer higher than the lower layer and vice versa for site 2. For the same size of ground electrodes, vertical arrangement is found to have lower ground resistance values, despite higher soil resistivity at the lower layer soil. Soil compaction after backfilling the trench during the installation of horizontal electrode has been identified as the main factor that contributes to differences between the measured and computed resistance values.