Model 5D Gedung Dekanat dan Perkuliahan Fakultas Kesehatan Masyarakat, Universitas Diponegoro Firdaus, Muhammad Ar Rayyan; Asalina, Rahma Uyun; Nurdiana, Asri; Setiabudi, Bambang
Jurnal Sipil dan Arsitektur Vol 1, No 3 (2023): Desember
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/pilars.1.3.2023.45-59

Abstract

Redesign is the critical point of the construction process which aims to provide technical specification requirements that will be used at the project later. In project planning, more time and accuracy are needed to obtain the required output. Therefore, it is necessary to use BIM or Building Information Modeling software to simplify, speed up and minimize errors due to human error. This Project was made a redesign the Dean's Building and Lecture project of the Faculty of Public Health, Diponegoro University using the BIM or Building Information Modeling application which aims to streamline structural, planning work, financing estimation, and scheduling processes. The method used is a literature study with the main data of design drawing and others data from the construction project of the Dean Building and Lectures of the Faculty of Public Health, Diponegoro University. The preparation of this Project goes through 3 stages. The first stage is to redesign the FKM Building project using Autodes Revit, the second stage is analyzing the structure with SAP 2000 and Ms Excel applications then the third stage is replanning cost estimation and scheduling using Ms Excel and Ms Project. The result of this Final Project is to obtain new best drawings, material specifications, cost estimation and scheduling.
Penerapan Building Information Modeling (BIM) dalam Perencanaan Rumah Susun Kementerian Sosial BBRSPDF Kota Surakarta 6 Lantai Wibowo, Aditya; Asha, Safia Nur; Nurdiana, Asri; Setiabudi, Bambang
Jurnal Sipil dan Arsitektur Vol 1, No 3 (2023): Desember
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/pilars.1.3.2023.31-44

Abstract

Construction planning and management is carried out as an attempts to find out various aspects that will be use in facilitating the construction, so it is following the applicable requirements, building functions, and economy. In construction projects, problems are often found at the planning stage or during construction, such as clashes between design elements or between schedules which can cause delays in project construction, large amounts of waste generated after construction, cost overruns during construction, and other problems caused by a lack of accuracy and poor coordination that can disrupt the productivity of construction projects. As technology develops, Building Information Modeling (BIM) is use as a solution to overcome various problems in the construction sector with a system that can collect and manage important data in the construction planning process that is integrated into accurate 3D modeling. In this final project, Building Information Modeling (BIM) will be used to plan the 6-floor Flats of the Ministry of Social Affairs BBRSPDF Surakarta City. Outputs be generated can be in the form of superstructure and substructure plans, namely the design of foundation structures, columns, beams, and plates, 2D Detail Engineering Design (DED), 3D modeling, and construction management plans in the form of Budget Plans, and scheduling.
Perancanaan Jembatan Beton Prategang RSUD Temanggung dengan Berbasis Building Information Modeling (BIM) 3D, 4D, dan 5D Anandita, Dianya Puan; Nurdiana, Asri Nurdiana; Setiabudi, Bambang
Jurnal Sipil dan Arsitektur Vol 1, No 3 (2023): Desember
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/pilars.1.3.2023.60-75

Abstract

Building Information Modeling (BIM) technological innovations can assist in designing construction designs to be integrated with each other, so that the process can be more effective and efficient. This Building Information Modeling (BIM) technology can be applied to various construction works, including road and bridge construction work. In this study the authors will plan the construction work of a prestressed concrete bridge at Temanggung Hospital which includes bridge geometric planning, structural loading and reinforcement calculations, 3D modeling and calculation of concrete volume and reinforcement using Autodesk Revit, as well as designing a cost budget and time schedule using Microsoft Project. From the analysis. Based on the results of the analysis, obtained a 17,453-meter-long Full Circle bend plan with a 4% incline, the elevation of the bridge is 14,470 meters from the riverbed, the design of the bridge at the Temanggung Hospital is safe against work loads, the total cost needed in the construction of the Temanggung Hospital Bridge is Rp. 7,875,323,851, with a duration of work of 5 months starting from 1 August 2023 to 9 December 2023.