Analisis Keterlambatan Pada Proyek Apartemen Berkonsep Transit Oriented Development (TOD) Bagas Prawiro Dwiputranto; I Ketut Sucita
Jurnal Poli-Teknologi Vol. 19 No. 1 (2020)
Publisher : Politeknik Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32722/pt.v19i1.2726

Abstract

The problem in the The Conexio Cikunir 1 Apartment project which has the concept of Transit Oriented Development (TOD) was had delayed, which should have been 100% contractually completed, but only 46.231% have been realized. Based on these percentages, required an analysis of the dominant factors that causes of delayed in this project. This study has purpose to determine the dominant factor influencing the variables causing project delayed. Questionnaires were distributed to the respondents consisting of the contractors, owners and supervisory consultants involved in the apartment construction project. The results of the questionnaires were processed using SPSS 25 software. The data analysis method used is multiple linear regression method. The results of the research shows that factors which fulfilled on the partial test (t test) and has a significant influence is document of works variable (5.792 ) . This value has the highest rank of significance value for project delayed. Futhermore is planning & scheduling variable (2,805), equipments variable (2,482), managerial variable (2.324), materials variable (2,248), and external factors variable (2.094). The result of Adjusted R Square of 62.70% shows that the Factors that Causes of Delayed can affect the Project Delay variable by 62.70%, while the remaining 37.30% is affected by other variables not examined in this study.
The Effect of Non-Excusable Delay Factors on The Completion of Building Construction Projects Alvin Dunaufal; I Ketut Sucita; Jonathan Saputra
Logic : Jurnal Rancang Bangun dan Teknologi Vol. 23 No. 2 (2023): July
Publisher : Unit Publikasi Ilmiah, P3M, Politeknik Negeri Bali

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31940/logic.v23i2.96-103

Abstract

A problem that often occurs in construction projects is the delay in the implementation process. Various factors cause the delay, but in developing countries such as Indonesia, the dominant delay occurs because the implementing contractor causes it for unforgivable reasons (non-excusable delay). This study aims to determine the influence of the non-excusable delay parameter and the relationship between these factors. The research is quantitative with data collection techniques in the form of unstructured interviews, field observations, and surveys using research questionnaires with the number of respondents obtained as many as 33 people consisting of the owner, construction management consultant, quantity surveyor consultant, and ends with confirmation of the results. Research on the implementing contractor. Data analysis was performed using multiple linear regression analysis. The test results of multiple linear regression analysis show that the non-excusable delay factor can significantly affect the completion of construction projects. The influence of each element is 0.434 units for the lack of contractor competence, 0.067 units for inappropriate implementation planning, and -0.097 for inefficient field management units. And simultaneously, these three factors can significantly increase the project delay value index.