Claim Missing Document
Check
Articles

Found 6 Documents
Search

Feasibility and Design of Grid-connected Floating PVs in West Java, Indonesia Iskandar, Handoko Rusiana; Iman, Agnia; Daelami, Ahmad
Elektron : Jurnal Ilmiah Volume 15 Nomor 2 Tahun 2023
Publisher : Teknik Elektro Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/eji.0.0.361

Abstract

The modeling and design of grid-connected floating photovoltaic (PV) are covered in this paper. Using dams in West Java as a location with present floating PV potential, this paper encourages the development of renewable energy and the construction of fossil-free power plants in various parts of Indonesia. Three alternative locations—the Saguling, Cirata, and Jatiluhur dams—are proposed for floating-PV type designs, each having a capacity of 1 MW grid-connected. The modeling process uses a variety of dependable auxiliary software to simulate possible solar energy use as well as capacity design optimization of system components. Modeling and simulation findings indicate that the grids of the Saguling, Cirata, and Jatiluhur dam have a combined potential for electrical energy of 1705.2 MWh/year, 1635.4 MWh/year, and 1611.8 MWh/year, respectively, with an average performance ratio of 0.74 to 0.75. The total PV capacity for each dam is 1197 Wp, using 550 Wp/PV panel with an efficiency 21.51%/PV and 4 Inverters for grid connectivity. There are 544 PV units per array. 5561 m2 is the estimated area needed to build this system.
Analysis of Energy Loss of Distribution Network of PT. PLN (Persero) ULP Banda Aceh Haz, Fauzia; Anshar, Andi Ahmad Fauzan; Setia, Giri Angga; Winanti, Naftalin; Daelami, Ahmad
Jurnal Teknologi Elekterika Vol. 22 No. 1 (2025)
Publisher : Jurusan Teknik Elektro Politeknik Negeri Ujung Pandang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31963/elekterika.v22i1.5483

Abstract

The aim of this research to identify areas requiring further attention to enhance electricity distribution efficiency. Data collection is conducted through observation and documentation methods to obtain secondary data such as Single Line Diagram, Distribution Transformer Load Current, Substation Voltage, Conductor Type, Conductor Length, and Conductor Cross-Sectional Area. Secondary data is processed and analyzed to obtain the conductor resistance value, conductor/line power losses, transformer power losses, total power losses, and total energi losses occurring in the distribution network using mathematical calculations, followed by simulation using the ETAP (Electrical Transient Analysis Program) application. After manually calculating power losses in the PT. PLN (Persero) ULP Banda distribution network at Penyulang Nusantara, which reached 7.84034 kW, the simulation results using the ETAP software show 7.8 kW, with a power loss percentage of 0.69% relative to the load. Following the simulation of improvement efforts using ETAP (conductor uprating and load balancing), power losses decrease to 4.4 kW (a reduction of 3.4 kW), with a percentage of 0.39%. The energi losses before improvement are 5,645.045 kWh (1.802%), and after improvement, it becomes 3,168 kWh (a reduction of 2,477 kWh) with a percentage of 1.59%. The improvement efforts result in savings of IDR 3,578,586.91.
RENEWABLE ENERGY SOLUTION: SOLAR PHOTOVOLTAIC SYSTEM DESIGN FOR SUPPLYING REMOTE TERMINAL UNIT PANELS IN THE KEDUNG PUTRI IRRIGATION SYSTEM Iskandar, Handoko Rusiana; Fadihilah, Laili; Daelami, Ahmad
Jurnal Media Elektrik Vol. 22 No. 3 (2025): MEDIA ELEKTRIK
Publisher : Jurusan Pendidikan Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59562/metrik.v22i3.7754

Abstract

The Kedung Putri Dam Irrigation Area is situated in the Purworejo Regency, Central Java Province. It is an irrigation system employed for agricultural production, although it is significantly distant from grid electrical supplies. Photovoltaic (PV) power plants, utilizing renewable energy sources, exhibit an average solar energy potential of 5.041 kWh/m2/day. The PV system was designed in six steps, from data collecting to performance evaluation. The method started with location data, meteorological data (solar irradiation and temperature), and the Remote Terminal Unit (RTU) panel energy consumption. PVsyst 7.2 calculates daily load capacity, size, and number of solar panels depending on local irradiation. This simulation models system performance using environmental conditions and outputs technical specifications, estimated energy production, and solar fraction. Based on the calculations, PVSyst modelling, and this paper's analysis, the following conclusions were obtained to meet the objectives: RTU panels at B.Ks.1, B.Kd.1, B.Kd.3, and B.Kd.7.Tg must have a minimum PV capacity of 300 Wp and a maximum of 450 Wp with 375 Ah; 12 V battery operation. SCC unit with 20 A load current and 600 W nominal operational power (24 V battery) is installed. Preliminary PVsyst software simulations show that the four locations average 415.125 kWh/year. The four locations utilise 400.5 kWh/year and average 71.5% performance. Average solar fraction ratio of four places is 68.5%; energy lost is 184.23 kWh/year. A thorough review of the PV system's performance shows that 300 Wp has a higher PR value than 450 Wp. The PV capacity has an average annual SF value of 0.685 across the four locations, indicating that the solar power system can supply 68.5% of the RTU panels' power, while 31.5% requires other energy sources or more batteries.
Pelatihan Instalasi Listrik Rumah Tangga Dan Elektronika Dasar Bagi Pemuda Di Desa Cilame Kecamatan Ngamprah Kabupaten Bandung Barat Fakhri, Zul; Sunubroto, Sunubroto; Iskandar, Handoko Rusiana; Daelami, Ahmad
Jurnal Abdimas Kartika Wijayakusuma Vol 1 No 1 (2020): Jurnal Abdimas Kartika Wijayakusuma
Publisher : LPPM Universitas Jenderal Achmad Yani

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (402.183 KB) | DOI: 10.26874/jakw.v1i1.10

Abstract

Desa Cilame adalah sebuah kawasan di Kecamatan Ngamprah Kabupaten Bandung Barat, Jawa Barat. Cilame merupakan desa terluas di Kecamatan Ngamprah dan dihuni penduduk sekitar 34.689 jiwa yang tergabung dalam 25 Rukun Warga (RW). Jumlah masyarakat yang tergolong pemuda usia produktif 15 tahun s/d 30 tahun sebanyak 6.533 jiwa. Dari jumlah tersebut, jumlah pemuda yang putus sekolah sebanyak 1.287 orang. Makalah ini menguraikan tentang kegiatan pengabdian kepada masyarakat dalam bentuk pelatihan instalasi listrik rumah tangga dan elektronika dasar untuk pemuda putus sekolah di desa Cilame. Pemberian pelatihan tersebut ditujukan agar pemuda putus sekolah dapat menggunakan hasil pengetahuan dan keterampilan untuk keperluan sendiri atau untuk membuka usaha dengan berwiraswasta. Program pelatihan dalam kegiatan pengabdian masyarakat ini terbagi menjadi beberapa bagian, yaitu pre-test, pembuatan modul pelatihan, diskusi interaktif, workshop, dan post test. Kegiatan pelatihan ini bertempat di Gedung Aula Desa Cilame Kecamatan Ngamprah, Kabupaten Bandung Barat dan diikuti oleh 12 peserta. Program pelatihan berjalan dengan baik dan lancar sesuai dengan rencana kegiatan yang telah disusun. Meskipun belum semua peserta menguasai dengan baik materi yang disampaikan, tetapi peserta antusias dalam mengikuti pelatihan yang diberikan dan terlibat aktif dalam sesi diskusi maupun praktik.
Pelatihan Instalasi Listrik dan Pembuatan Catu Daya untuk para Santri di Pesantren Al-Musri, Desa Ciburuy, Padalarang, Kabupaten Bandung Barat, Jawa Barat Daelami, Ahmad; Haz, Fauziah; Fakhri, Zul; Kusnandar, Kusnandar; Permana, Ade Sena; Zainal, Yuda Bakti; Najmurrokhman, Asep
Jurnal Abdimas Kartika Wijayakusuma Vol 6 No 2 (2025): Jurnal Abdimas Kartika Wijayakusuma
Publisher : LPPM Universitas Jenderal Achmad Yani

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26874/jakw.v6i2.938

Abstract

Kegiatan pengabdian kepada masyarakat ini bertujuan untuk meningkatkan pengetahuan dan keterampilan praktis santri serta pengurus Pesantren Al–Musri dalam bidang instalasi listrik, perakitan power supply, dan penerapan teknik tenaga listrik yang aman dan efisien. Pesantren yang berlokasi di Desa Ciburuy, Padalarang, Kabupaten Bandung Barat, masih menghadapi keterbatasan dalam aspek teknis kelistrikan, baik dari sisi infrastruktur maupun sumber daya manusia. Kegiatan ini dilaksanakan melalui beberapa tahapan, yaitu observasi awal terhadap kondisi instalasi listrik eksisting, wawancara untuk mengetahui tingkat pengetahuan awal peserta, pelatihan teori dan praktik secara langsung, serta evaluasi. Materi pelatihan mencakup pengenalan komponen kelistrikan, prinsip dasar arus dan tegangan, teknik pemasangan instalasi listrik yang sesuai standar keselamatan, serta perakitan power supply sederhana. Hasil evaluasi menunjukkan adanya peningkatan pemahaman dan keterampilan peserta, yang dibuktikan dengan keberhasilan peserta dalam melakukan praktik instalasi secara mandiri. Kegiatan ini juga mendorong terbentuknya kader teknisi internal pesantren yang dapat melakukan perawatan dan pengembangan sistem kelistrikan secara berkelanjutan. Diharapkan program serupa dapat direplikasi pada pesantren lain di wilayah pedesaan untuk mendorong kemandirian dan keselamatan dalam pengelolaan kelistrikan.
PENERAPAN TENAGA LISTRIK SOLAR CELL UNTUK LAMPU PENERANGAN JALAN UMUM DI KP. CILIMUS DESA PADAASIH KECAMATAN CISARUA KABUPATEN BANDUNG BARAT Fakhri, Zul; Daelami, Ahmad; Charisma, Atik; Somantri, Nivika Tifani
Martabe : Jurnal Pengabdian Kepada Masyarakat Vol 5, No 1 (2022): Martabe : Jurnal Pengabdian Kepada Masyarakat
Publisher : Universitas Muhammadiyah Tapanuli Selatan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31604/jpm.v5i1.259-264

Abstract

Pemerintah mulai beralih menggunakan energi terbarukan sebagai pembangkit listrik seperti pembangkit listrik tenaga surya. Penerangan Jalam Umum (PJU) solar cell adalah salah satu aplikasi dari pembangkit energi listrik tenaga surya. Sistem ini menjadi solusi penerangan jalan umum untuk daerah yang belum terjangkau enegi listrik dari PLN. Minimnya penerangan jalan umum PJU di sejumlah wilayah di Kabupaten Bandung Barat (KBB) banyak dikeluhkan warga. Kondisi jalan yang gelap karena tidak terpasang PJU, mulai dari Kecamatan Padalarang, Ngamprah, Cikalongwetan, Batujajar, Cihampelas, Sindangkerta, Rongga, Gununghalu, Cisarua, dan Lembang. Tim Pengabdian Kepada Masayarakat (PKM) Teknik Elektro Universitas Jenderal Achmad Yani melalui kegiatan PKM ini memasang  PJU solar  cell di Kp. Cilimus, RT.01 dan 02 RW.06 Desa Padaasih, Kecamatan Cisarua, Kabupaten Bandung Barat pada 4 titik. Selain itu tim PKM juga memberikan penyuluhan terkait perawatan PJU solar cell. Penyuluhan ini diharapkan agar usia PJU solar cell lebih tahan lama.