Claim Missing Document
Check
Articles

Found 4 Documents
Search

Optimisasi Operasi Pemboran Di Basin Afrika Utara Aly Rasyid; Nugroho Marsiyanto
Jurnal Jaring SainTek Vol. 3 No. 1 (2021): April 2021
Publisher : Fakultas Teknik, Universitas Bhayangkara Jakarta Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31599/jaring-saintek.v3i1.332

Abstract

Drilling optimization objective was to reduce costs, improve wellbore conditions and integrity for increasingly challenging reservoirs while establishing maximum safety performance and environmental custodianship. Even though the final result of a drilling operation is easily observed, what almost always goes unnoticed is the complexity of the issues involved in the planning and execution of a drilling operation and the number of topics involved in such a process. In this paper, as case study of the exploration drilling in Hamada region, North Africa has been evaluated. Over the period of 2006 to 2011, continued drilling improvement was achieved. Key elements in the optimization included focus on management drilling team structure, engineering well planning, improvements on managing drilling operations such as on site safety management practices, and also post drill analysis to implement lesson learn for the next well to be drilled. As the result, while drilling 26 wells during the 2006 until 2011, drilling days were successfully reduced from 87 days (first well) to the average 40 days, and very good safety record performance.
Integrated Drilling Optimization A Success Story in the Basin of North Africa Aly Rasyid
Journal of Petroleum and Geothermal Technology Vol 2, No 1 (2021): May
Publisher : Universitas Pembangunan Nasional "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/jpgt.v2i1.4470

Abstract

Drilling optimization objective was to reduce costs, improve wellbore conditions and integrity for increasingly challenging reservoirs while establishing maximum safety performance and environmental custodianship. Even though the final result of a drilling operation is easily observed, what almost always goes unnoticed is the complexity of the issues involved in the planning and execution of a drilling operation and the number of topics involved in such a process.In this paper, as case study of the exploration drilling in Hamada region, North Africa has been evaluated. Over the period of 2006 to 2011, continued drilling improvement was achieved. Key elements in the optimization included focus on management drilling team structure, engineering well planning, improvements on managing drilling operations such as on site safety management practices, and also post drill analysis to implement lesson learn for the next well to be drilled.As the result, while drilling 26 wells during the 2006 until 2011, drilling days were successfully reduced from 87 days (first well) to the average 40 days, and very good safety record performance.
Evaluasi Pemilihan Electric Submersible Pump (ESP) Untuk Menggantikan Gas Lift (GL) Di Sumur X Lapangan Offshore Y Nugroho Marsiyanto; Eko Prasetio; Aly Rasyid
JURNAL BHARA PETRO ENERGI Vol 1 No 3: December 2022
Publisher : Department of Petroleum Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31599/bpe.v1i3.1739

Abstract

Well X is located in the offshore Y field, where there are 7 production wells, all of which use an artificial lift in the form of a gas lift. In this field, oil is produced from the N oil layer while the gas layer comes from the K layer. Well X was drilled in May 2013 with a target of N oil formation at a depth of 9,007 ft MD, slope (450) and 4-1/2" Liner completion. The initial production of well X was 1,632 BOPD; 5.3 MMSCFD; 0% BSW. Well X is the only well in the Y offshore field that does not penetrate the K gas formation, so gas production from nearby wells is used to produce oil from the N formation. well-to-well gas lift. Along with production time, the reservoir pressure in the N oil layer and K gas layer has decreased, so that oil production in well X has also decreased. With changes in company policy that optimize and increase gas production to increase gas sales to the industry around the company's operational areas since early 2017, the outgoing pressure on the Y platform has increased from 210 psi to 450 psi, causing a total oil well X could not pass through and produce due to high outgoing pressure on platform Y. Well X's last production data was on January 31 2017 with oil production of 179 BOPD and 1.25 MMSCD for gas production and gas lift injection of 0.75 MMSCFD, before finally shutting down. The selection of another artificial lift as a substitute for the gas lift has been carried out to revive well X later. Based on the alloy table made by Weatherford for the selection of artificial lifts for conditions on the Y field platform, ESP has many advantages and appropriate flexibility compared to other types of artificial lifts. The ESP type D1050N which is a mix flow ESP has been selected and after installation in well X in August 2019 it has successfully revived with a production test of 885 BFPD, 681 BOPD, and 23% water content on September 3 2019. ESP in well X has been in production for 2 years, until finally experiencing a leaky tubing problem in September 2021 and requiring a new tubing replacement job along with a new ESP replacement to revive the X well. Reference: Brown, E., Kermit, (1977). The Technology of Artificial Lift Method”, Volume 2a, Oklahoma; Pennwell Publishing Company. Brown, E., Kermit (1980). The Technology of Artificial Lift Method”, Volume 3a, Oklahoma; Pennwell Publishing Company. Data-data Lapangan Sumur X Lapangan Offshore Y. (2019-2021). Gabor, Takack. (2009). Electric Submersible Pump Manual Desingn, Operations and Maintenance. United States of America: Gulf Publishing Company. Weatherford. (2005). Artificial Lift System.  
Peningkatan Peluang Bisnis Strategi Industri Migas Terhadap Pengaruh Pandemi Covid-19 Di Indonesia Edy Soesanto; Aly Rasyid; Bobby Devagan
JURNAL BHARA PETRO ENERGI Vol 1 No 3: December 2022
Publisher : Department of Petroleum Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31599/bpe.v1i3.1741

Abstract

The oil as well as fuel market participates in an essential function in the Indonesian economic climate, as an income source APBN as well as a resource of power (particularly gas) towards steer different industries of lifestyle throughout Indonesia. Limitations on individual motion have actually resulted in a straight decrease popular for gas. Along with reducing usage, Covid-19 likewise has actually an effect on reducing oil as well as fuel costs as well as manufacturing, consisting of ceasing upstream tasks as well as decreasing fine-tuning tasks. Within this particular examine, monitorings were actually made from all of upstream oil as well as fuel company tasks in Indonesia particularly, since the effect of the Covid-19 pandemic consisted of the effect of worldwide problems overall, to ensure that healing initiatives could be created in addition to recommendations for handling problems that might intensify. The outcomes of this particular examine end that the avoidance of the effect of Covid-19 for the upstream oil as well as fuel company should be actually performed comprehensively as well as includes all of stakeholders, to ensure that the oil as well as fuel market can easily remain to make it through amidst the direct visibility of the Covid-19 pandemic. Reference: Dito Aditia Darma, et all, Dampak Pandemi Covid-19 Terhadap Perekonomian Indonesia, Jurnal Benefita 212-224, Juli 2020. Nugroho, H. (2018a). Pemikiran Mengenai Pembangunan Industri Gas Bumi Indonesia. Depok : Institute of Development & Energy Economics. Nugroho, H. (2018b). Reserves and security of our energy supply, dalam Thoughts on   Indonesian Energy Issues & Policies. Jakarta : Bappenas Nur Laila Widyastuti, et all, Dampak Covid-19 terhadap Industri Minyak dan Gas Bumi: Rekomendasi Kebijakan untuk Indonesia, The Indonesian Journal of Development Planning Volume IV No. 2 – Juni 2020. Republik Indonesia, (2020). Anggaran Pendapatan & Belanja Negara https://www.kemenkeu.go.id/informasi-publik/uu-apbn-dan-notakeuangan/, diakses pada tanggal 10 September 2020. SKKMIGAS, https://www.skkmigas.go.id/publikasi/infographic, di akses pada tanggal 20 Oktober 2020. Tirto.id Website, Update Corona Indonesia April 2020, https://tirto.id/update-corona-indonesia-21-april-2020-data-covid-19-dunia-terkini-ePYZ, diakses tanggal 21 April 2020.