This Author published in this journals
All Journal AGREGAT
Darman Katni S
Program Studi Teknik Sipil Fakultas Teknik Universitas Muhammadiyah Surabaya

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Perbandingan Waktu dan Biaya Elemen Balok dan Plat dengan Metode U-Shell, Half Slab, dan Steel Deck di Proyek Grand Dharmahusada Lagoon Surabaya Feri Efendi; Darman Katni S; Isnaniati .
AGREGAT Vol 3, No 2 (2018)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (555.347 KB) | DOI: 10.30651/ag.v3i2.2276

Abstract

AbstractIn the Tower Olive Grand Dharmahusada Lagoon project, the beams and floor plates are structural elements that have a large area and volume compared to other structural elements. The volume of concrete, formwork and rebar beams and floor plates is much larger than the column structure elements and shear walls. This, which causes the cost of concrete work and beam formwork and higher floor plates. So that the beam and plate elements are the right element for Value Engineering. Value Engineering is doing with making 2 alternative designs for comparison to existing design about time and cost. Alternative 1 uses the U-Shell beam method and Half Slab Plate while alternative 2 uses the U-Shell beam and Steel Deck method. The methodology used identify problems, collect data, analyze data, discuss Value Engineering analysis, and conclusions and suggestions. The results of the cost comparison obtained from the value engineering analysis are the initial / existing design Rp. 892.600.395, -, alternative 1 Rp. 699.753.933, -, alternative 2 Rp. 771.498.593, -. Comparison of construction time per floor (Floor to Floor) obtained from the value engineering results, namely the initial / existing design 8 days, alternative 1 8 alternative days 2 9 days. So that it can be concluded from the two alternatives, alternative method 1 is better than alternative 2 in terms of cost and time. Keywords: U-Shell, Half Slab, dan Steel Deck  AbstrakPada proyek Tower Olive Grand Dharmahusada Lagoon, balok dan plat lantai merupakan elemen struktur yang memiliki luasan dan volume yang cukup besar dibandingkan dengan elemen struktur lainnya. Volume beton, bekisting, dan besi, balok dan plat lantai jauh lebih besar daripada elemen struktur kolom serta Shear Wall. Hal ini, yang menyebabkan biaya pekerjaan beton dan bekisting balok serta plat lantai lebih tinggi. Sehingga elemen balok dan plat merupakan elemen yang tepat untuk dilakukan Value Engineering. Value Engineering yang dilakukan dengan membuat 2 alternatif desain untuk dibandingkan dengan  desain eksisting  dari segi biaya dan waktu. Alternatif 1 menggunakan metode balok U-Shell dan plat Half Slab sedangkan alternatif 2 menggunakan metode balok U-Shell dan Steel Deck. Metodologi yang digunakan dengan cara melakukan identifikasi masalah, pengumpulan data, menganalisa data, pembahasan analisa Value Engineering, serta kesimpulan dan saran. Hasil perbandingan biaya yang didapatkan dari analisis Value Engineering  yaitu desain awal/eksisting diperoleh Rp. 892.600.395,-, alternatif 1 diperoleh Rp. 699.753.933,- alternatif  2 diperoleh Rp. 771.498.593,-. Perbandingan waktu pelaksanaan per lantai (Floor to Floor) yang didapatkan dari hasil value engineering yaitu desain awal/eksisting diperoleh 8 hari, alternatif 1 diperoleh 8 hari, alternatif 2 diperoleh 9 hari. Sehingga dapat disimpulkan dari kedua  alternatif tersebut, metode alternatif 1 lebih baik daripada alternatif 2 dari segi biaya dan waktu. Kata Kunci: U-Shell, Half Slab, dan Steel Deck
Studi Perbandingan Teknologi Material M-System dengan Material Bata Ringan dan Plat Lantai Ringan pada Bangunan Bertingkat Andi Sulistiyanto; Darman Katni S; Isnaniati .
AGREGAT Vol 4, No 2 (2019)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (687.046 KB) | DOI: 10.30651/ag.v4i2.3679

Abstract

Abstract Today is the science and technology, developing rapidly, especially in the field of building materials technology. By the new building material technology, it is expected to make the process construction faster and at lower cost. The one of the new technologies is the M-System, so that M- System comparisons with materials already exist and commonly used by people, namely lightweight brick materials and lightweight concrete slab. The results of the comparison of the time obtained from this research is the material M-System has a faster implementation time of 267% than conventional material, but the M-System material has a higher cost of 12% than conventional materials.Keywords: M-System, Lightweight Brick, Lightweight Concrete Slab, Cost, Time Abstrak Ilmu pengetahuan dan teknologi masa kini berkembang semakin pesat, khususnya dibidang teknologi bahan bangunan. Dengan adanya teknologi bahan bangunan terbaru diharapkan dapat membuat proses pembangunan lebih cepat dan dengan biaya yang semakin murah. Salah satu teknologi baru adalah M-System, sehingga dibuatlah perbandingan M-System dengan material yang telah ada dan banyak dipakai oleh masyarakat yaitu material bata ringan serta plat lantai ringan. Hasil perbandingan waktu yang didapatkan dari penelitian ini yaitu Material M-System mempunyai waktu pelaksanaan lebih cepat267% dari material konvensional,namun material M-System mempunyai biaya lebih mahal sebesar 12% dari material konvensional.Kata Kunci: M-System, Bata Ringan, Plat Lantai Ringan, Biaya, WaktuAbstract Today is the science and technology, developing rapidly, especially in the field of building materials technology. By the new building material technology, it is expected to make the process construction faster and at lower cost. The one of the new technologies is the M-System, so that M- System comparisons with materials already exist and commonly used by people, namely lightweight brick materials and lightweight concrete slab. The results of the comparison of the time obtained from this research is the material M-System has a faster implementation time of 267% than conventional material, but the M-System material has a higher cost of 12% than conventional materials. Keywords: M-System, Lightweight Brick, Lightweight Concrete Slab, Cost, Time Abstrak Ilmu pengetahuan dan teknologi masa kini berkembang semakin pesat, khususnya dibidang teknologi bahan bangunan. Dengan adanya teknologi bahan bangunan terbaru diharapkan dapat membuat proses pembangunan lebih cepat dan dengan biaya yang semakin murah. Salah satu teknologi baru adalah M-System, sehingga dibuatlah perbandingan M-System dengan material yang telah ada dan banyak dipakai oleh masyarakat yaitu material bata ringan serta plat lantai ringan. Hasil perbandingan waktu yang didapatkan dari penelitian ini yaitu Material M-System mempunyai waktu pelaksanaan lebih cepat 267% dari material konvensional,namun material M-System mempunyai biaya lebih mahal sebesar 12% dari material konvensional. Kata Kunci: M-System, Bata Ringan, Plat Lantai Ringan, Biaya, Waktu