Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Inisiasi

DESAIN PENGEMBANGAN POTENSI “EKOWISATA KAWASAN PASAR IKAN DESA KEDUNGOMBO BATURETNO” Iwan Ristanto; Satria Agung Wibawa
Inisiasi Volume 11, Edisi 1, Juni 2022
Publisher : Badan Perencanaan Pembangunan Daerah dan Penelitian dan Pengembangan Kabupaten Wonogiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (737.424 KB) | DOI: 10.59344/inisiasi.v11i1.33

Abstract

RPJMDes Kedungombo 2019-2025, APBDes 2021 Fish Market Development Plan, Village financial policy directions and regional priority programs, accompanied by work plans including "Development of Fish Market Area Potential". For this reason, comprehensive planning is needed from the aspect of developing village areas through a Master Plan which will be assisted by the service staff in this case the Civil Engineering Study Program Service Team, Universitas Veteran Bangun Nusantara Sukoharjo."PKM Potential Development "Ecotourism in the Fish Market Area of ​​Kedungombo Village" Service activities through planning and developing village potential are carried out through several stages, as follows:(1) Licensing and Cooperation in Kedungombo Village, Baturetno,(2) Survey and Measurement,(3) Pre-Design Creation and Presentation,(4) Design Public Outreach & Test, (5) Revision of Design Drawings and Calculation of RAB. The development of the Fishing Pond Area and Selfie Area in Kedungombo Village, Baturetno, there was an increase in understanding of 67%, while 2) Participants' understanding of the Bestek (Development Plan) and RAB images increased by 75% from a total of 26 (twenty six) participants representing the community. attended the socialization and public test of the Ecotourism Development Design for Fish Market Area in Kedungombo Village, Baturetno.
ANALISIS STUDI KELAYAKAN PROYEK PEMBANGUNAN WISATA PENDIDIKAN AGRO & FARMING ISLAMIC CENTRE AL HUDA, SELOGIRI Iwan Ristanto; Satria Agung Wibawa
Inisiasi Volume 12, Edisi 1, Juni 2023
Publisher : Badan Perencanaan Pembangunan Daerah dan Penelitian dan Pengembangan Kabupaten Wonogiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59344/inisiasi.v12i1.125

Abstract

Development of the Free Learning Curriculum for 2022, and the amount of public enthusiasm for the Integrated Islamic Education model has encouraged the Integrated Islamic Boarding School (PPIT), to develop formal education based on Islamic boarding schools; PAUD IT, SDIT, SMPIT, SMKIT, SMAIT which are integrated in character education through the development of an independent curriculum outside the classroom through the Short Semester Course Agro& Farming educational tour program at the Islamic Center Al Huda, Selogiri The construction of an educational tourism facility for the Agro& Farming Islamic Center Al Huda in Selogiri requires a large amount of money so a project feasibility study analysis is needed which is an important factor in a project evaluation although technical and social aspects also determine it. To carry out an economic analysis, economic benefits and costs are needed, which are then made into cash flows based on the implementation program. Calculating the value of the EIRR is assumed to be the loan service, calculating the B/C Ratio which is the difference between Benefit and Cost, and calculating the NPV value which is the difference between the profit (benefit) and cost (cost) in the conditions of average margin mudhorobah/murabahah loan services -12% average. Based on the Feasibility Study for the Development of the Agro& Farm Islamic Center Al Huda Wonogiri, it can be concluded that; the amount of EIRR = 24.0% > 12%, it is assumed that with the loan service margin being greater than 12% (current interest rate), then the project can be said to be economically viable. The B/C value = 1.932 > 1 means that if the B/C value at the loan service margin is 12% > 1, then the construction of the Agro& Farm Islamic Center Al Huda Wonogiri can be built. The difference between the profit (benefit) and cost (cost) on the condition of an average loan margin of 12% is (B-C) = IDR 723,283,139.00 > 0