Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : Buana Information Technology and Computer Sciences (BIT and CS)

The Critical Path Method In Management Information System of Contractor Service Company Using Incremnetal Model Hamim Tohari; Ahmad Kudhori; Hedi Pandowo
Buana Information Technology and Computer Sciences (BIT and CS) Vol 4 No 1 (2023): Buana Information Technology and Computer Sciences (BIT and CS)
Publisher : Information System; Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/bit-cs.v4i1.2770

Abstract

Good control is needed in managing a project, starting from controlling the human resources to systematic scheduling. CV. XYZ Surabaya is a contractor service company, that does not yet have an information system that can be used as a control tool in project management. Critical Path Method (CPM) is one method that can be used to schedule projects. This study aims to design a project management information system by implementing CPM. The system design is done using the Incremental Model. The results of this study are in the form of a prototype system that fits the needs of CV. XYZ Surabaya, includes system flow, Contextual Data Model (CDM), and User Interface (UI).