Evaluasi Pengelolaan Proyek Saluran Air Limbah Domestik dengan Aplikasi Primavera Project Planner (Studi Kasus pada Normalisasi Saluran Air di Kec. Ngampilan Yogyakarta) Hendra Hendra; Andino Maseleno; Budi Satiawan; Rika Fetricia; Citra Dewi
Seminar Nasional Aplikasi Teknologi Informasi (SNATI) 2006
Publisher : Jurusan Teknik Informatika, Fakultas Teknologi Industri, Universitas Islam Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Makalah ini membahas penelitian mengenai evaluasi pengelolaan proyek saluran air limbah domestik dengan aplikasi Primavera Project Planner. Untuk melakukan pengolahan data dan analisis dalam penelitian ini menggunakan metode PDM (Presedence Diagram Method) untuk menganalisis waktu. Metode untuk menganalisis anggaran biaya total proyek dan jumlah tenaga kerja menggunakan metode analisis BOW (Burgerlijke Openbare Werken). Dari hasil penelitian didapat pendekatan dengan metode PDM menghasilkan waktu penyelesaian yang sesuai dengan rencana awal proyek, jumlah tenaga kerja yang dibutuhkan untuk beberapa jenis pekerjaan normalisasi saluran air limbah domestik Kec. Ngampilan, serta jumlah total biaya rencana proyek.Kata kunci: evaluasi proyek, primavera project planner, precedence diagram method, burgerlijke openbare werken
KARAKTERISTIK PASCA ELASTIK DINDING PANEL STYROFOAM DENGAN TULANGAN HORIZONTAL AKIBAT BEBAN BOLAK-BALIK Budi Satiawan; Iman Satyarno; Kardiyono Tjokrodimuljo
Konstruksia Vol 7, No 2 (2016): Jurnal Konstruksia Vol 7 No. 2 Tahun 2016
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (800.674 KB) | DOI: 10.24853/jk.7.2.%p

Abstract

SIMULATION OF RING CONNECTION MODIFICATION ON FLARE STACK STRUCTURE Budi Satiawan; Basit Al Hanif; Tanjung Rahayu Raswitaningrum
International Journal of Civil Engineering and Infrastructure Vol 2, No 2 (2022): IJCEI Volume 2 No. 2
Publisher : University Of Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (771.403 KB) | DOI: 10.24853/ijcei. 2. 2. 1-9

Abstract

The flare stack serves to protect process equipment facilities against unexpected overpressure. This study aims to follow up on previous research that recommends improvements to the flare stack structure based on corrosion findings that occur in the area of the riser stack around the ring connection for the guy wire. By replacing rusty material, it is also necessary to consider modifications to prevent the risk of re-corrosion. Based on current design observations in the connection ring area for guy wire, side cutting is required which can result in water being trapped. This research aims to find out whether by modifying the connection ring for guy wire, this flare structure still has structural reliability when receiving critical outer loads or not. Based on the results of the study, it shows that modifying the geometry of the connection ring guy wire still provides reliable structural performance when receiving critical outer loads. The maximum stress that occurs in the area around the pad eye is 71.2 Mpa with a maximum stress ratio of 0.434 it shows that the value is still quite far from the maximum allowable voltage ratio of 1.0. So it can be concluded by modifying the connection ring for guy wire to prevent the risk of corrosion can be done without causing a decrease in the performance of the structure in withstanding critical outer loads.