Claim Missing Document
Check
Articles

Found 2 Documents
Search

Competency Analysis of PPG Alumni for Continuous Professional Development Planning Maria Melani Ika Susanti; Sri Budiyono; Tukiyo Tukiyo; Purwo Haryono; Tasari Tasari; Ratna Sari
Journal of General Education and Humanities Vol. 5 No. 4 (2026): August
Publisher : MASI Mandiri Edukasi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58421/gehu.v5i4.1538

Abstract

This study aims to analyze the initial proficiency of Widya Dharma University’s PPG (Pre-Service Teacher Education) alumni as a basis for planning Continuous Professional Development (CPD). The method used is quantitative descriptive analysis supported by qualitative data collected through an online questionnaire administered to the alumni. The results indicate that the levels of pedagogical, professional, social, and personal competencies fall into the moderate category; however, gaps exist in certain indicators. Major weaknesses were identified in higher-order thinking skills (HOTS)-based learning abilities, reflection through action research (PTK), and scientific practices such as publications and presentations at broader forums. Qualitative data revealed that alumni have a greater need for practice-based PKB activities, such as workshops and learning communities. These findings underscore the importance of designing PKB that is contextual, collaborative, and oriented toward the real needs of novice teachers.
Identification of Factors Caused The Risk of Time Delays in The Pulogadung Anwar Widiyanto Nugroho; Tukiyo Tukiyo; Herman Fithra
International Journal of Engineering, Science and Information Technology Vol 2, No 2 (2022)
Publisher : Malikussaleh University, Aceh, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (448.947 KB) | DOI: 10.52088/ijesty.v2i2.247

Abstract

To provide livable housing for the residents of DKI Jakarta, especially in urban areas with minimal land availability, the DKI Jakarta Provincial Government supports the development of vertical housing to offset the high demand for housing and limited land. Through the Department of Public Housing and Settlement Areas, the Provincial Government of DKI Jakarta is implementing the Pulogadung-East Jakarta PIK Flats Construction Project. When this research was carried out, the Pulogadung-East Jakarta PIK Flats Construction Project was entering week 63, with work progress reaching 47.689% of the planned 48.725%, or in other words, this project experienced a delay of 1.036% of the scheduled. Therefore, it is necessary to conduct research that aims to identify the factors that cause the risk of time delays, analyze the most dominant factors that lead to the risk of time delays, and look for the necessary handling actions so that the risk of time delays that occur does not increase or can also be prevented or resolved. In this study, the descriptive quantitative method is carried out by surveys, interviews, and distributing questionnaires to respondents. The risk rating was analyzed using MS. Excel is based on a probability and impact matrix, which aims to determine variables with a high level of risk, then expert validation is carried out regarding risk management. And from the analysis results obtained, six variables that cause the risk of time delays in the Pulogadung-East Jakarta PIK Flats Development Project work can occur, namely Late Payment of Term by Owner, Design Changes, Lack of Coordination While Working, Inaccuracy of Material Order, Time, Limited Material Availability in the Market, and the Occurrence of the Corona Outbreak (Covid 19). The results of expert recommendations for the six variables can be expressed in handling actions.