Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Optimasi Produktivitas Alat Gali-Muat (Excavator) Dan Alat Angkut (Dump Truck) Pada Pengangkutan Andesit Untuk Mengoptimalkan Produksi Di PT. Koto Alam Sejahtera Afdal Zikri; Yoszi Mingsi Anaperta
Journals Mining Engineering : Bina Tambang Vol 6, No 1 (2021): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan FT UNP

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bt.v6i1.111804

Abstract

Abstract. PT Koto Alam Sejahtera is a private mining company engaged in the andesite mining business in Koto Alam, Lima Puluh Kota Regency. In andesite mining activities, PT. Koto Alam Sejahtera uses a series of excavators and dump trucks to move material from the loading point to the waste dump. In the process of transporting andesite to the crusher there is a queue of dump trucks and long stand-by times at the dump trucks, this can cause the productivity of the tools to be small so that the Andesite stone production target of 80,000 tons / month is not achieved. This is due to the inefficient working time of mechanical tools. This production target was not achieved due to the inappropriate combination of transportation equipment (Mitsubishi Fuso 220 PS) and loading equipment (Hitachi ZX350) which resulted in queues or waiting times for transportation vehicles. One of the ways to achieve the production target requires appropriate fleet management. Based on research that was carried out in October 2019, the productivity of the Hitachi ZX-350 excavator was 344,9378 tons / hour and the productivity of the Mitsubishi Fuso 220 PS dump truck was 78,10247 tons / hour. The composition of the equipment used is 1 unit of excavator serving 5 units of dump trucks, causing the combination of transportation and loading factors to be inappropriate. To overcome the long queue time, the composition of the MF = 1 tool was improved. Fleet settings are based on the queuing method, namely 1 unit of digging equipment and 4 units of transportation equipment with a production of 83.101,03 tons / month. Keywords: Flee Management, Queuing Method, Match Factor, Production, Productivity, Dump Truck
Pengembangan LKPD pada Mata Pelajaran Instalasi Motor Listrik di SMK Negeri 1 Bukittinggi Afdal Zikri; Ta'ali
Ranah Research : Journal of Multidisciplinary Research and Development Vol. 2 No. 2 (2020): Ranah Research : Journal Of Multidisciplinary Research and Development (Februar
Publisher : Dinasti Research

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (401.258 KB)

Abstract

LKPD adalah suatu bahan ajar cetak berupa lembar-lembar kertas yang berisi materi, ringkasan, dan petunjuk-petunjuk pelaksanaan tugas pembelajaran yang harus di kerjakan oleh peserta didik. Dengan adanya LKPD siswa dapat lebih aktif dalam mengembangkan potensi dirinya secara mandiri. Berdasarkan observasi di SMK Negeri 1 Bukittinggi, LKPD yang digunakan di sekolah masih belum sesuai dengan tuntunan kurikulum 2013 yang menuntun siswa untuk dapat aktif dan struktur LKPD yang ada di sekolah belum sesuai dengan struktur LKPD yang semestinya. Jenis penelitian yang digunakan dalam pengembangan LKPD ini yaitu penelitian R&D (Research and Development) dengan menggunakan model 4D. Hasil yang didapatkan dari penelitan ini adalah pengembangan LKPD yang dikategorikan valid, sangat praktis dan efisien.