PERENCANAAN EMBUNG GUWOREJO KECAMATAN TAROKAN KABUPATEN KEDIRI Yuono Mugi Kuncoro; Djoko Trijanto; Medi Efendi
Prokons: Jurnal Teknik Sipil Vol. 12 No. 1 February 2018
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v12i1.153

Abstract

In dry season Tarokan Sub-district of Kediri, often suffers from drought, so a small dam (embung) was required. The objectives of the study are to determine the dimension of the dam, its spillway and to analyze its stability. The required data were of rainfall, topographic maps, soil, and population.The initial design was hydrologic analysis by finding out the planned discharge Q50 and determining the water volume of inflow. To determine the effective catchment ponds, capacity analysis using topographical data and comparing the volume of water available. And analysis of spillway to determine the flood water level.The analyses result, the amount of the water needs of a population of 258.854.400m3, and the magnitude of the draft Q50 discharge of in 4.027 m3/sec (The  room  for  sediment  is  29,234.9 m3  at  elevation  1 m from the bottom of the pool); 390,000m3 effective capacity at +131.75 elevation, and flood water level at +132.75 elevation. The dimension of embung main dam is 6 m deep; embung crest at +133.00 elevation ; 3m wide embung crest ; 1:3 upstream slope; 1 : 2.25 downstream slope ; 10 m wide spillway channel 1 : 1 slope of wall of spillway channel ; and crest of spillway at +131.75. Geostudio software was used to calculate the figures safety against sliding. Keywords: embung, spillway, embung dimensions, slope stabilty
PERENCANAAN BIAYA DAN JADWAL PELAKSANAAN PROYEK PEMBANGUNAN PABRIK ROKOK KALENG GUDANG GARAM SKM UNIT 5 KEDIRI Fitrianto Supramono; Fadjar Purnomo; Djoko Trijanto
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 3 (2024): SEPTEMBER 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i3.5149

Abstract

Proyek Pembangunan Pabrik Rokok Kaleng Gudang Garam SKM Unit 5 merupakan peningkatan perusahaan Gudang Garam dalam industri rokok di Indonesia. Project Planning pada ini dilakukan agar dapat mengetahui alternatif dalam hal site layout dan traffic management; metode pelaksanaan; mutu; Kesehatan dan Keselamatan Kerja (K3); biaya dan penjadwalan. Data yang dibutuhkan adalah peta lokasi, Rencana Kerja dan Syarat (RKS), gambar kerja, Harga Satuan Dasar Kediri (2019). Microsoft Project 2019 digunakan untuk penjadwalan dan Microsoft Excel 2019 digunakan untuk menghitung biaya. Perencanaan ini menghasilkan 3 alternatif dengan penggunaan jumlah alat berat yang berbeda-beda; Perencanaan traffic management memiliki 3 alternatif: dari arah Jl. Pajang, Jl. Demak, dan Jl. Selowarih; Metode pelaksanaan menggunakan metode pengerjaan dari AS 0 - 25 dilanjutkan AS 26 – 48; Rencana Inspeksi dan Tes dibuat untuk rencana mutu dan HIRARC (Hazard Identification, Risk Assessment and Risk Control) dibuat untuk rencana K3; alternatif 1 yang telah dibuat menghabiskan biaya Rp 60.137.851.585 dengan 294 hari kalender lalu alternatif 2 yang menghabiskan biaya Rp 62.860.508.511 dengan 208 hari kalender dan alternatif 3 menghabiskan biaya Rp 58.999.489.586 dengan 328 hari kalender.