PERENCANAAN BEKISTING DAN PERANCAH PEMBANGUNAN GEDUNG PROGRAM STUDI TEKNIK LISTRIK POLITEKNIK NEGERI MALANG Algina Dia Tasya; Fadjar Purnomo
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 7 No. 1 (2026): MARET 2026
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v7i1.9546

Abstract

Pekerjaan bekisting dan perancah merupakan komponen penting dalam pembangunan struktur beton bertulang, khususnya pada proyek gedung bertingkat. Penelitian ini bertujuan untuk merencanakan dan menganalisis tiga jenis sistem bekisting, yaitu bekisting konvensional, bekisting semi sistem dan bekisting aluminium, dalam pembangunan Gedung Program Studi Teknik Listrik Politeknik Negeri Malang. Metode yang digunakan meliputi perhitungan kebutuhan material, analisis biaya dan waktu pelaksanaan, serta evaluasi efektivitas dan efisiensi dari ketiga sistem. Tahapan yang dimulai dari identifikasi masalah, pengumpulan data primer dan sekunder, dan data yang diperoleh kemudian diolah dan dianalisis untuk masing-masing metode bekisting. Secara keseluruhan, bekisting semi sistem muncul sebagai opsi paling efisien dari sisi biaya, dari alternatif sewa maupun sistem pembelian dengan nilai skor 4,33. Semi sistem memberikan keseimbangan terbaik antara biaya, kekuatan, dan efisiensi penggunaan, sehingga menjadi pilihan paling ekonomis dibandingkan dua alternatif lainnya.
Peningkatan Keterampilan dalam Pembuatan Tempe di Kelurahan Sidorahayu, Kecamatan Wagir, Kabupaten Malang: Improving Tempe Making Skills in Sidorahayu Village, Wagir District, Malang Regency Diana Irmawati Pradani; Gindang Rain Pratama; Dandung Novianto; Fauzi Kabar Rahmawan; Fadjar Purnomo; Ayu Fatimah Sari
Jurnal Pengabdian pada Masyarakat Ilmu Pengetahuan dan Teknologi Terintegrasi Vol. 10 No. 1 (2025): December
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jindeks.v10i1.8986

Abstract

Tempe merupakan produk pangan tradisional Indonesia yang memiliki nilai gizi tinggi serta potensi ekonomi yang besar bagi masyarakat. Di Kelurahan Sidorahayu, Kecamatan Wagir, Kabupaten Malang, ketersediaan tempe berkualitas masih terbatas akibat rendahnya pemahaman masyarakat mengenai teknik pembuatan tempe yang higienis dan bernilai jual. Kegiatan pengabdian kepada masyarakat ini bertujuan untuk meningkatkan pengetahuan dan keterampilan warga melalui bimbingan teknis dan pelatihan pembuatan tempe berbasis praktik. Metode pelaksanaan meliputi survei awal, ceramah, demonstrasi, dan praktik langsung yang mencakup pemilihan bahan baku, proses fermentasi, sanitasi, hingga pengemasan produk. Peserta pelatihan terdiri atas ibu rumah tangga, pemuda, dan anggota Pemberdayaan dan Kesejahteraan Keluarga (PKK). Hasil kegiatan ini menunjukkan adanya peningkatan pemahaman dan keterampilan peserta dalam menghasilkan tempe yang lebih higienis, berkualitas, dan berpotensi dikembangkan sebagai salah satu usaha rumah tangga. Selain itu, pelatihan ini mendorong tumbuhnya minat kewirausahaan serta inovasi produk olahan berbasis tempe. Secara keseluruhan, kegiatan ini berhasil meningkatkan keterampilan warga dan menjadi langkah awal dalam memperkuat kemandirian ekonomi masyarakat berbasis potensi lokal.
OPTIMASI ALAT BERAT PEKERJAAN CUT AND FILL PEMBANGUNAN JALAN TOL PASURUAN – PROBOLINGGO SEKSI 4 (STA. 32+150 – STA. 37+150) Danny Riotama Putra; Indah Ria Riskiyah; Fadjar Purnomo
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 1 (2024): MARET 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i1.3778

Abstract

Pembangunan Jalan Tol Pasuruan-Probolinggo Seksi 4 yang merupakan salah satu proyek nasional yang dikerjakan oleh PT. Waskita Karya (Persero), Tbk. yang bertujuan untuk memajukan sektor ekonomi dan industri serta rencana jangka panjang pemerintah untuk memajukan infrastruktur jalan tol Trans Jawa.Pekerjaan cut and fill harus diperhatikan dengan seksama karena menggunakan banyak alat berat. Disebabkan kapasitas yang berbeda-beda maka alat yang dugunakan dipilih dengan hati-hati untuk memaksimalkan penggunaan dan meminimalkan biaya sewa. Data tersebut berupa bentang proyek sepanjang 5 km yang terdiri dari pekerjaan cut 1.163.116,822 m3 dan pekerjaan fill 46.859,675 m3. Langkah pertama mengidentifikasi jenis pekerjaan dan volume pekerjaan yang dilakukan untuk menentukan alat berat yang layak digunakan dan jumlahnya. Selanjutnya untuk Langkah kedua adalah menentukan variabel keputusan, fungsi tujuan, dan fungsi kendala, kemudian memasukkannya ke dalam Dynamic Programming. Analisis menghasilkan 8 alternatif untuk masing-masing pekerjaan cut dan pekerjaan fill. Dari hasil analisa biaya paling optimum untuk pekerjaan cut terdapat pada kombinasi 1 yang berupa kombinasi dari (EXC 1 - DT 1 - BD 1) dengan total biaya sebesar  Rp.604.830.363,24 sedangkan pekerjaan fill terdapat pada kombinasi  2 yang berupa kombinasi dari (EXC 1 - DT 2 - BD 1 - VR 1 - PR 1 - MG 1 - WTT 1)dengan total biaya sebesar  Rp.39.960.715.001,56.
OHS ANALYSIS TO UNSAFE ACTION IN KERTOSONO – JOMBANG – MOJOKERTO – GEMPOL ROAD AND BRIDGE PRESERVATION PROJECT Anara Bhisma Soca Driya; Fadjar Purnomo; Mochammad Khamim
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 1 (2024): MARET 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i1.3782

Abstract

Road preservation project is one of the large-scale construction activities. PT Abipraya is one of the well-known contractors that carries out the project, therefore a proper OHS (Occupational Health and Safety) regulations are very important to establish. In this study an analysis of several OHS factors will be carried out which are considered to reduce the occurrence of unsafe acts. The factor used is the variable X1 namely "OHS understanding" and X2 namely "Implementation of OHS" as the independent variable, and the Y1 variable namely "Worker Behaviour" as the dependent variable. Data anlysis will be done by using IBM SPSS statistics with validity tests, reliability tests, correlation tests, and multiple linear regression tests. The results show that the correlation value between the variables X1 and X2 is 0.771 included in the "strong" category, the X1 and Y1 variables are 0.274 included in the "weak" category, the X2 and Y1 variables are 0.464 included in the "moderate" category. The “t” test is used to show the partial effects between each independent variables to the dependent variables, and the result of the “t” value between variables X1 and Y1 of -0.887 which does not meet the requirements so that it does not have a significant impact on reducing unsafe acts. The result of the “t” value between the variables X2 and Y1 is 2,676 which already meets the requirements so that it has an impact on reducing unsafe acts. For the “F” test is used to show whether both independents variables have a simultaneous impact to the dependent variable, and the “F” value shows a result of 5,295 which meets the requirements so that variables X1 and X2 simultaneously have an impact on variable Y1. Based on the result, the value of OHS cost estimation already set as much as Rp. 2,491,303,048.96.
OPTIMASI PENGGUNAAN ALAT BERAT PADA PROYEK PENINGKATAN JALAN EMPUNALA KOTA MOJOKERTO Ahmadreza Nurdiansyah; Fadjar Purnomo; Radhia Jatu Noviarsita Sakti
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 1 (2024): MARET 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i1.3818

Abstract

Dalam pengerjaan Proyek Peningkatan Jalan Empunala, Kota Mojokerto, dilakukan beberapa jenis pekerjaan salah satunya pekerjaan galian. Jenis alat berat yang digunakan dalam pekerjaan tersebut memerlukan optimasi sehingga alat-alat tersebut optimal penggunaannya, meskipun dengan biaya yang minimum. Dalam melakukan optimasi alat berat pada proyek tersebut diperlukan data-data yang meliputi: data gambar proyek, jenis-jenis alat berat, dan harga sewa. Data-data tersebut kemudian digunakan untuk menghitung kapasitas produksi alat berat Excavator Cat 320D, kapasitas produksi Excavator Kobelco,  kapasitas produksi Dump Truk Hino 130HD, kapasitas produksi Motor Grader Cat, kapasitas produksi Vibro Roller Sakai SV525D, biaya sewa, dan operasional. Sedangkan data biaya sewa diperlukan untuk menentukan alternatif kombinasi. Dari hasil perhitungan dan analisis menggunakan Aplikasi Lindo, didapatkan kombinasi alat berat sebagai berikut: 1 Excavator tipe Cat 320D, 3 Dump truck tipe Hino 130 HD, 1 Motor Grader Cat, 2 Vibro Roller tipe Sakai SV525D. Didapatkan hasil perhitungan biaya per jam pada pekerjaan galian yaitu sebesar Rp. 3,578,167.28 per jam dan untuk biaya Pekerjaan Galian total didapatkan biaya Rp, 1,387,278,779.335
PROJECT PLANNING PEMBANGUNAN JALAN LINTAS SELATAN PANTAI SINE – BATAS KABUPATEN BLITAR I Mohammad Haikal Asshidiqie; Indah Ria Riskiyah; Fadjar Purnomo
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 2 (2024): JUNI 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i2.4246

Abstract

The Project Planning of Development of Trans South Road Sine Beach – Blitar District Border 1, located in Tulungagung District, with the total length is 6.55 km. The challenging and remote terrain, logistical activities, as well as adverse weather conditions, have caused delays in the project, necessitating an accurate and efficient project planning. This project can be realized by considering cost, time, and good quality. The objectives of  this project planning are including appropriate organizational structure planning, site layout, execution strategies and methods, quality planning, occupational health and safety planning, implementation budget planning, and project work scheduling. The required data includes project drawings, work plans and specifications, and the list of labor unit prices  in Tulungagung District 2023. Project cost estimation is performed using Microsoft Excel 2019, and scheduling and the use of the S-curve are achieved through the Gantt Chart method using Microsoft Project 2016. This Project Planning results in a pure project organizational structure, 2 alternative site layout options, execution strategy divided into 4 zones, quality control carried out through work implementation inspections and material testing, and occupational health and safety control applied in the project involves identifying potential hazards in the work environment (HIRARC), with a duration of 336 calendar days and a total implementation cost is Rp283,573,377,000.00.
OPTIMASI LAHAN PARKIR TERHADAP PENDAPATAN PARKIR DI GOLDEN SWALAYAN KOTA KEDIRI Shafa Wellin Astono; Marjono Marjono; Fadjar Purnomo
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 3 (2024): SEPTEMBER 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i3.4584

Abstract

Golden Swalayan merupakan salah satu pusat perbelanjaan terbesar di Kota Kediri dengan lahan parkir yang cukup luas. Tujuan dari penelitian ini adalah mengoptimalkan kondisi parkir agar bisa menampung lebih banyak kapasitas sehingga pendapatan pada area parkir pun meningkat. Pengoptimalan tersebut dilakukan dengan menggunakan dua cara yaitu (1) penataan area parkir supaya lebih optimal (2) Membuat pola parkir bersudut. Data yang dibutuhkan dalam penelitian ini adalah data survei parkir kendaraan dan denah parkir eksisting. Untuk mendapatkan data primer dilakukan observasi langsung di lapangan pada jam operasional mall. Dari hasil analisis didapatkan tingkat pergantian parkir adalah 4 mobil/SRP/hari dan 5 sepeda motor/SRP/hari, dengan pendapatan tarif eksisting sebesar Rp3.130.500 dalam sehari untuk area parkir mobil, dan Rp3.713.000 di area parkir sepeda motor dalam sehari. Kapasitas area parkir mobil di 3 lantai setelah dilakukan optimasi adalah 194 SRP sedangkan untuk area parkir sepeda motor 332 SRP. Pendapatan parkir optimal untuk area mobil ialah sebesar Rp3.880.000/hari  sedangkan untuk area sepeda motor yaitu sebesar Rp4.980.000.
OPTIMASI PENGGUNAAN ALAT BERAT PADA PROYEK JALUR LINTAS SELATAN LOT 7 BLITAR STA 6+00 – STA 12+625 Syafira Oktaviani; Diah Lydianingtias; Fadjar Purnomo
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 3 (2024): SEPTEMBER 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i3.5084

Abstract

Pelaksanaan Proyek Jalur Lintas Selatan Lot 7 ini berada di daerah perbukitan terjal sehingga volume pekerjaan tanahnya cukup besar dan merupakan tanah keras. Pekerjaan yang ditinjau adalah pekerjaan galian, timbunan, lapis pondasi agregat, perkerasan lentur AC-BC dan AC-WC. Metode yang digunakan untuk mendapatkan hasil optimum menggunakan metode program linear. Data yang diperlukan dalam penelitian ini adalah siteplan, gambar cross section, master schedule, spesifikasi jenis alat berat dan harga. Hasil optimasi kombinasi alat berat yang termurah pada pekerjaan galian Zona 1 di pilih alternatif 3 dengan biaya total Rp 13.176.571.162.- dengan komposisi 6 unit EXB1; 2 unit BD2, 2 unit EXC1,3 unit DT1. Pada pekerjaan galian Zona 2 di pilih alternatif 5 dengan biaya total Rp 13.303.260.594.- dengan komposisi 6 unit EXB1; 2 unit BD2, 2 unit EXC1,3 unit DT1. Pada pekerjaan galian Zona 3 di pilih alternatif 5 dengan biaya total Rp 13.303.260.594 dengan komposisi 6 unit EXB1; 2 unit BD2, 2 unit EXC1,3 unit DT1. Pada pekerjaan galian Zona 4 di pilih alternatif 5 dengan biaya total Rp 14.472.416.756.- dengan komposisi 7 unit EXB1; 2 unit BD2, 3 unit EXC1,3 unit DT1. Pada pekerjaan galian Zona 5 di pilih alternatif 7 dengan biaya total Rp 15.438.044.102 dengan komposisi 7 unit EXB1; 2 unit BD2, 3 unit EXC1,3 unit DT1. Pada pekerjaan timbunan Zona 1 dipilih alternatif 1 dengan biaya total Rp 5.197.591.922 dengan komposisi 1 unit EXC2, 2 unit DT1, 2 unit MG2, 1 unit SFR1, 1 unit WT1. Pada pekerjaan timbunan Zona 2 dipilih alternatif 7 dengan biaya total Rp 3.545.185.292 dengan komposisi 1 unit EXC2, 1 unit DT1, 1 unit MG2, 1 unit SFR1, 1 unit WT1. Pada pekerjaan lapis pondasi agregat di pilih alternatif 1 dengan biaya total Rp 2.932.652.604 dengan komposisi 9 unit DT1, 1 unit MG1, 1 unit SFR1, 1 unit WT1. Pada pekerjaan perkerasan lentur AC-BC di pilih alternatif 1 dengan biaya total Rp 2.786.362.777 dengan komposisi 4 unit DT1, 2 unit CO1, 1 unit AD1, 1 unit AP1, 1 unit VR1, 1 unit PTR1. Pada pekerjaan perkerasan lentur AC-WC di pilih alternatif 1 dengan biaya total Rp 2.231.865.318 dengan komposisi 3 unit DT1, 1 unit CO1, 1 unit AD1, 1 unit AP1, 1 unit VR1, 1 unit PTR1.
PERENCANAAN BIAYA DAN JADWAL PELAKSANAAN PROYEK PEMBANGUNAN PABRIK ROKOK KALENG GUDANG GARAM SKM UNIT 5 KEDIRI Fitrianto Supramono; Fadjar Purnomo; Djoko Trijanto
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 3 (2024): SEPTEMBER 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i3.5149

Abstract

Proyek Pembangunan Pabrik Rokok Kaleng Gudang Garam SKM Unit 5 merupakan peningkatan perusahaan Gudang Garam dalam industri rokok di Indonesia. Project Planning pada ini dilakukan agar dapat mengetahui alternatif dalam hal site layout dan traffic management; metode pelaksanaan; mutu; Kesehatan dan Keselamatan Kerja (K3); biaya dan penjadwalan. Data yang dibutuhkan adalah peta lokasi, Rencana Kerja dan Syarat (RKS), gambar kerja, Harga Satuan Dasar Kediri (2019). Microsoft Project 2019 digunakan untuk penjadwalan dan Microsoft Excel 2019 digunakan untuk menghitung biaya. Perencanaan ini menghasilkan 3 alternatif dengan penggunaan jumlah alat berat yang berbeda-beda; Perencanaan traffic management memiliki 3 alternatif: dari arah Jl. Pajang, Jl. Demak, dan Jl. Selowarih; Metode pelaksanaan menggunakan metode pengerjaan dari AS 0 - 25 dilanjutkan AS 26 – 48; Rencana Inspeksi dan Tes dibuat untuk rencana mutu dan HIRARC (Hazard Identification, Risk Assessment and Risk Control) dibuat untuk rencana K3; alternatif 1 yang telah dibuat menghabiskan biaya Rp 60.137.851.585 dengan 294 hari kalender lalu alternatif 2 yang menghabiskan biaya Rp 62.860.508.511 dengan 208 hari kalender dan alternatif 3 menghabiskan biaya Rp 58.999.489.586 dengan 328 hari kalender.
STUDI KELAYAKAN PROYEK PEMBANGUNAN PERUMAHAN PURI JAYA RAJEG MULYA CLUSTER AMARTHA KABUPATEN TANGERANG Revandi Naufal Hardiyanto; Fadjar Purnomo; Devi Zettyara
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 5 No. 4 (2024): DESEMBER 2024
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jos-mrk.v5i4.5708

Abstract

Studi kelayakan memainkan peran krusial dalam memastikan keberhasilan proyek pengembangan perumahan. Proyek pembangunan Perumahan Puri Jaya Rajeg Mulya Cluster Amartha di Kabupaten Tangerang di atas lahan seluas 35.995 m² dan rencana pembangunan 299 unit rumah dengan dua tipe berbeda menjadi fokus kajian ini. Dengan tujuan mengoptimalkan penggunaan lahan secara efektif dan mencapai hasil terbaik dari kondisi eksisting, kajian ini melibatkan analisis menyeluruh pada aspek pasar, teknis, dan finansial. Analisis tersebut meliputi identifikasi tipe rumah yang paling diminati masyarakat melalui kuesioner, optimasi site plan dengan software Lindo 6.1, penilaian kelayakan teknis berdasarkan persyaratan lahan, kelayakan finansial melalui beberapa parameter (NPV, BCR, PBP, dan IRR), serta sensitivitas proyek terhadap perubahan kondisi. Hasil analisis pada aspek pasar menunjukkan bahwa tipe rumah 28/60 merupakan tipe yang paling diminati masyarakat. Site plan optimasi berdasarkan minat masyarakat menghasilkan rencana pembangunan 359 unit rumah. Aspek teknis dinyatakan layak dengan persyaratan lahan yang terpenuhi, sementara kelayakan finansial juga dinyatakan layak berdasarkan parameter yang memenuhi kriteria yaitu NPV lebih dari 0, BCR lebih dari 1, PBP kurang dari umur investasi dan IRR kurang dari WACC. Analisis sensitivitas mengindikasikan ketidaklayakan ketika pendapatan turun 10% dan pengeluaran naik 10% dalam kondisi eksisting, serta pendapatan turun 25% dan pengeluaran naik 30% dalam kondisi optimal.