Sriyana Sriyana
Departemen Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

PENGARUH SUDUT DATANG GELOMBANG TERHADAP KERUSAKAN UNIT LAPIS LINDUNG PEMECAH GELOMBANG Sriyana Sriyana
KEAIRAN Nomor 2, Tahun 13, DESEMBER 2006
Publisher : KEAIRAN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (777.009 KB)

Abstract

Angle of wave direction is highly influence on the amount of damage in the armour layer unit breakwater. This research is aimed at knowing in the influence of angle of wave direction toward damage in armour layer unit. There kind of angle of wave direction is used in this research. There were 0o, 15o, and 30o with employing tetrapod, cubes, and rubble mound as the armour layer. This study is carried out by means of irregular breaker waves on phisical modeling with non-overtopping condition. The result of measurements indicate that increasingly angle of wave direction 0o have largest effect to determination of the amount of damage in the armour layer unit of breakwater than 15o, and 30o.
PERENCANAAN LONG STORAGE KEMALANG KABUPATEN KLATEN JAWA TENGAH Tony Susanto; Muhammad Idu Zaman Suquti; Sriyana Sriyana; Slamet Hargono
Jurnal Karya Teknik Sipil Volume 5, Nomor 2, Tahun 2016
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (482.408 KB)

Abstract

Irrigation water demand and raw water in Klaten regency is increasing in line with population growth. Raw water needs in Klaten regency have been obtained from well water. For the Government in this case the Department of Water Resources Management (PSDA) seeks to develop new sources of raw water by building Kemalang Long Storage. As the rainy season water reservoir, water reservoir can also be efficiently used in the dry season. Design of long storage Kemalang aims to meet the needs of raw water in three districts Karangnongko, Manisrenggo and Kebonarum and irrigation water to irrigate an area of 322 ha. Based on the mainstay discharge analysis by the method of F.J Mock obtained the discharge mainstay minimum of 125 liters/sec. For the body design of the long storage dam used the flood discharge hydrological data HSS Gamma I method with flood discharge plan 50 years return period amounted 43,432 m3/sec. Kemalang Long Storage reservoir volume is 27.235,10 m3. Long storage is planned to supply raw water at 0,138 m3/sec and irrigation water needs by 23 liters/sec/ha. The planned long storage dam 14,5 m high, with a base elevation ponds +348,00 m, +362,5,00 m dam crest elevation, surveillance 1,5 m high, 6 m wide dam crest, upstream slope of 1:3, 1:2,25 downstream slope. In planning this Kemalang Long Storage used Ogee threshold type spillway width 10 m with a height of 1,5 m and a spillway crest elevation of +359,00 m, using an eject pond flat type III with a length of 9,5 m. This project implementation is scheduled for 24 weeks with a budget plan of Rp.5.166.595.000,00.