Analysis of the Factors Affecting Delay in Housing Projects in XYZ Group) Panji Bawono Saputro; I Putu Artama Wiguna
IPTEK Journal of Proceedings Series No 6 (2020): 6th International Seminar on Science and Technology 2020 (ISST 2020)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2020i6.11121

Abstract

Success in completing projects on time is one of the essential goals, both for the owner and the contractor. XYZ Group, a holding of several companies in the real estate, has delayed more than 53% of housing projects. The impact of delays is time overrun, cost overrun, deviations in the quality, disputes, negative social consequences, arbitration, and idling resources. This paper studied a list of construction delay causes gathered from the literature. It starts by exploring factors causing project delays from the research and finding 48 causative factors, followed by distributing preliminary questionnaires to expert respondents to obtain 23 causes for housing project delays. The primary survey held on 55 respondents consisting of technical directors, project managers, project engineers, quality control, logistics, and project planners. Relative Importance Index (RII) calculated, and according to the highest values, the top five delay causes of housing projects are determined. Objectives of project delays from the owner and contractor are "Late issuing of approval of design documents by the owner," and "Changing government political/economic situation or policy." The cause of project delays from the owner is "Shortage of labour from the contractor," "Changes to work completed by the owner," and "Failure of the contractor to complete the work." Meanwhile, "Slow delivery of resources required by the contractor," "Changes in details by the owner," "Rework due to quality and final results by the contractor," is the cause of project delays from the contractor.