Nizmah Nizmah
Unknown Affiliation

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Pengaruh Pendidikan dan Pelatihan terhadap Peningkatan Produktivitas Kerja Karyawan-Karyawati PT Panasonic Gobel Indonesia Jakarta Timur Bakti Toni Endaryono; Ace Jaja Juansah; Nizmah Nizmah
Al-Kharaj : Jurnal Ekonomi, Keuangan & Bisnis Syariah Vol 3 No 1 (2021): Al-Kharaj: Jurnal Ekonomi, Keuangan & Bisnis Syariah
Publisher : Research and Strategic Studies Center (Pusat Riset dan Kajian Strategis) Fakultas Syariah IAI Nasional Laa Roiba

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (327.412 KB) | DOI: 10.47467/alkharaj.v3i1.190

Abstract

The purpose of this study was to determine the effect of education and training on the improvement of work productivity of employees of PT Panasonic Gobel Indonesia, East Jakarta. The independent variables used in this study are education and training. While the dependent variable used is the increase in employee productivity. The object used in the research is PT Panasonic Gobel Indonesia, with employees of the customer service division as the research sample. A total of 30 respondents. The research method with quantitative, data collection techniques with interviews, observation and documentation, the analysis used is simple linear regression analysis. From the results of the regression coefficient analysis linear function Y = 13.633 + 0.682. The results showed that education and training had a significant positive effect on the increase in work productivity of female employees, amounting to 71%.
PENGARUH SISTEM SELF-ASSESSMENT DAN TAX AMNESTY TERHADAP KEPATUHAN WAJIB PAJAK DI POS PEMERIKSAAN PRATAMA JAKARTA TEBET Nizmah Nizmah; Bambang Iman Santoso; Maryam Maryam; Saud Sihombing; Jihan Jihan; Suhardi Kamaluddin
SCIENTIFIC JOURNAL OF REFLECTION : Economic, Accounting, Management and Business Vol. 5 No. 2 (2022): SCIENTIFIC JOURNAL OF REFLECTION: Economic, Accounting, Management, & Business
Publisher : Sekolah Menengah Kejuruan (SMK) Pustek

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37481/sjr.v5i2.474

Abstract

The purpose of this study was to determine the impact of a system of self-assessment and tax amnesty to the compliance against the requirements of the taxpayer in the Tax Inspectorate Tebet Jakarta. Multiple regression analysis was used in this study. All taxpayers who are registered in the Tax Administration of Tibet included in this study. The formula of this research is to use a measurement scale on the Likert scale.. And the total number of people in this sample is 100 (one hundred). The results of this study show that the system self-assessment and tax amnesty influence taxpayer compliance against the Requirements of the Tax Inspectorate Tebet Jakarta. This is indicated by the results of Fcount in 93.986 and Ftable 3.090, which shows that the Fcount is greater than Ftable, and that its own assessment on the quality of the systemic and the variables of the Tax Amnesty has a significant impact on compliance with the requirements of the taxpayer in the Tax Inspectorate Tebet Jakarta.
ANALYSIS OF PROJECT TIME AND COST CONTROL WITH CPM, PERT AND CRASHING PROJECT METHODS IN SHOP BUILDING PROJECTS AT CV. MENTARI PERMAI Rosalinda Rosalinda; Nizmah Nizmah; Suko Ari R; Makmur Makmur; Dian Rarasanti
SCIENTIFIC JOURNAL OF REFLECTION : Economic, Accounting, Management and Business Vol. 6 No. 1 (2023): SCIENTIFIC JOURNAL OF REFLECTION: Economic, Accounting, Management, & Business
Publisher : Sekolah Menengah Kejuruan (SMK) Pustek

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37481/sjr.v6i1.622

Abstract

Delays in completing the Kelapa Dua shop-house construction project at CV. Mentari permai is a problem that often arises and affects the overall project work. The purpose of this research is to determine the critical path, calculate the costs incurred in the construction of the Kelapa Dua shop-house construction project with the duration of the initial and accelerated work and calculate the percentage of achievement of the shop construction project at CV. Mutia Enchantment of Nature. To overcome these delays, several control methods are used in project management. The methods used in this research are the Critical Path Method, PERT (Program Evaluation and Review Technique) and the Crashing Project. The results of the CPM planning method analysis obtained the project completion time for 91 days from the initial duration of 154 days. Whereas in reality the CPM method, the project completion time is 101 days from the initial duration of 167 days. In the PERT method, the project completion time is 107 days from a duration of 181 days with a probability of completion of 0.62%. And in the crashing project there is an acceleration of the completion duration for 9 days with an increase in costs of Rp. 26,545,194 and a total cost of Rp. 506,613,766.