p-Index From 2020 - 2025
0.659
P-Index
This Author published in this journals
All Journal Majalah Teknik Simes
Claim Missing Document
Check
Articles

Found 4 Documents
Search

Analisis Produksi Bahan-Bahan Perkerasan Jalan Untuk Hotmix AC-WC Mekar Ria Pangaribuan; Dafrin Dafrin
MAJALAH TEKNIK SIMES Vol 14 No 1 (2020): Majalah Teknik Simes
Publisher : UNIVERSITAS PROF. DR. HAZAIRIN, SH BENGKULU

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (6537.444 KB)

Abstract

Abstract Aggregate is a construction material that has an important role in the activities of highway construction. As the main constituent of pavement material, the proportion of aggregate in a mixture of 90-95 % by weight of pavement either flexible or rigid pavement pavement The purpose of the examination materials derived from laboratory to one production stone crusher machine in the villageGunung selan, is to determine the quality of material of each aggregate for admixture asphalt concrete wearing course (AC-WC). This result are in the experiment marshall, Stability of 10 (ten) of the test substance over a minimum standard stability properties Laston mixture (AC), and for the melting of 10 ( ten ) test materials, test material Number 3A+SA+SB in excess of the maximum,standard (2-4), the results of the experiment marshall melting of the material that is 3A = 4.2 mm, 5A and SB = 6.2 = 4.7 which exceeds the maximum melting tersbut likely caused by the lack of the number.
Analisis Perhitungan Dan Pengukuran Sistem Suplay Ac/Dc Untuk Kontrol Beban Di Gardu Induk Pekalongan Meriani meriani; Anton Savalas; Mekar Ria Pangaribuan
MAJALAH TEKNIK SIMES Vol 15 No 1 (2021): Januari 2021
Publisher : UNIVERSITAS PROF. DR. HAZAIRIN, SH BENGKULU

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (854.951 KB) | DOI: 10.32663/simes.v15i1.1716

Abstract

Abstract This abstract was conducted because of the lack of attention and maintenance carried out on the AC / DC supply, which is actually very important at the substation. How to make an AC/ DC supply system at Pekalongan substation fast work with high reliability and what steps are taken to reduce the impact of disruption or damage to equipment at the Pekalongan substation especially AC/ DC supply for load control. The research objective was to 1) analyze the AC/ DCs supply system at the Pekalongan substation, 2) Know the intermediate error value the measurement results on the Supply AC/ DC system are measured by the calculated value. The method used in this analysis consists of several stages, namely: 1) planning, 2) start, 3) Action, 4) Observation, 5) Reflection, 6) documentation, and 6) Finish. The analysis of the AC/ DC supply system for load control at the Pekalongan substation was carried out in different periods of time, namely 3 consecutive months from February 2019 to April 2019 so that the error results obtained were completely accurate. The analysis carried out can be said to be successful and the value shown by the analyzed equipment this is the actual used value because the results of measurements and calculations carried out from February 2019 to April 2019 all have an error value below 1%.
Model Parkir Yang Optimal Berdasarkan Analisis Perhitungan Jumlah Kendaraan Di Area Parkir Yang Tersedia Mekar Ria Pangaribuan
MAJALAH TEKNIK SIMES Vol 13 No 1 (2019): Majalah Teknik Simes
Publisher : UNIVERSITAS PROF. DR. HAZAIRIN, SH BENGKULU

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3761.707 KB)

Abstract

Abstract Along with the increase in the number of vehicles, the parking area at the north Bengkulu Regency Regen Office has a lack of parking area availability. The research objectives are : a) Knowing how much the needs of parking, and b) Designing the model and parking system that will be applied. The research method is by analyzing the number of vehicles entering the parking location, type of vehicle, how much parking capacity. the result of the study are the design of parking lost of 12.000M2. I entrance and 2 exist the number of vehicles that can be accommodated are 468 two-wheeled vehicle and 39 four-vehicles. With Parking areas as follow: A, C, D, E, G,H, J, K, L, M, N and G are two-wheeled parking (motorcycles). B, F, I, P and Q are four-wheeled parking area (cars). The parking model/patern that can be applied is the 900 angle parking pattern, by accommodating the number of vehicles reaching 350 SRP (the number of projections of addition in the next 5 years).
Analisis Kebutuhan Drainase Di Desa Senali Mekar Ria Pangaribuan; Apriadi Apriadi
MAJALAH TEKNIK SIMES Vol 16 No 1 (2022): Majalah Teknik Simes Volume 16 Nomor 1 Januari 2022
Publisher : UNIVERSITAS PROF. DR. HAZAIRIN, SH BENGKULU

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (524.118 KB) | DOI: 10.32663/simes.v16i1.2537

Abstract

Abstract The location of the road in Senali Village, North Bengkulu Regency is a shortcut that does not pass through the city center, if high rainfall results in water flowing through the road, as well as puddles of water around people's homes, this is due to the absence of adequate drainage channels to drain runoff. rain on roads and community sewers. The purpose of this research is to design the dimensions of road drainage in Senali Village by calculating the annual rainfall data. The results of the study showed that the condition of inundation on the Senali Village road and community houses as a result of the absence of good drainage on the road body and due to high rainfall, a drainage design was planned by calculating the intensity of rainfall for the last 15 years (data from the Statistics Agency). the amount of rainfall X1 = 4577 mm, the arithmetic mean of cumulative rain (X) = 305.13 and the standard deviation (Sx) = 77.55 and the value of the amount of rainfall for the return period T years (mm)/24 hours XT is obtained = 370.11 mm. The dimension selection is a trapezoidal model with a size of Q=0, 38 m3/second h = 0,52 m W=0,36 m B=0,53 m and A= 1,05 m.