Claim Missing Document
Check
Articles

Found 3 Documents
Search

PERENCANAAN KAPASITAS PRODUKSI DENGAN METODE CAPACITY REQUIREMENT PLANNING DI TEACHING FACTORY MANUFACTURE ELECTRONICS POLITEKNIK NEGERI BATAM Rika Kartika Sihotang; Aditya Wirangga
JOURNAL OF APPLIED BUSINESS ADMINISTRATION Vol 1 No 1 (2017): Journal of Applied Business Administration - Maret 2017
Publisher : Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (389.849 KB) | DOI: 10.30871/jaba.v1i1.1254

Abstract

Penelitian ini bertujuan untuk menerapkan kapasitas waktu produksi yang sesuai dengan menggunakan metode Capacity Requirement Planning pada Teaching Factory Manufacture Electronics (TFME) Politeknik Negeri Batam. Variable dalam penelitain ini adalah jadwal pesanan (Schedule Of Planned Order Release), pusat kerja (Work Centre), Routing Data (waktu yang digunakan), dan Work Order Status. Pengumpulan data diperoleh dari data dokumen produksi di TFME Politeknik Negeri Batam. Hasil penelitian dapat disimpulkan bahwa pesanan dapat diselesaikan dengan kapasitas perhari yaitu 8 pcs/hari setara 1 unit PCB A4 dengan waktu operasi adalah waktu yang digunakan untuk menyelesaikan permintaan berdasarkan kemampuan kapasitas maximal. Sehingga perumusannya adalah permintaan (demand) dibagi dengan kapasitas produksi terpasang yaitu 165 pcs : 8 pcs/hari = 21 unit dimana 1 unit PCB A4dikerjakan dalam waktu 5,12 jam sehingga untuk menyelesaikan 21 unit menghabiskan waktu selama 107,52 jam = 14 hari, untuk itu berdasarkan kebutuhan penyesuaian kapasitas dalam produksi maka jumlah hari yang dibutuhkan untuk Operation Time (waktu operasi) adalah selama 14 hari. Kebutuhan waktu aktual adalah konversi dari waktu operasi kedalam satuan menit yaitu 5,12 jam/unit x 21 unit x 60 menit = 6451 menit = 107,52 jam.tingkat efisiensi dan utilisasi merupakan kondisi actual perfomance dari setiap work centres. Kapasitas yang tersedia dalam periode ini selama 4032 menit untuk menyelesaikan pesanan PCB G-Robo sebanyak 165 pcs, dan waktu aktual yang dibutuhkan untuk menyelesaikan pesanan tersebut hanya 6451 menit sehingga dengan menggunakan metode CRP ini dapat menyimpan operation cost selama 2419 menit = 40,32 jam = 6 hari kerja sehingga TFME Politeknik Negeri Batam dapat meminimalisir biaya yang diakibatkan dari proses produksi serta pesanan untuk PCB G-Robo juga dapat diselesaikan tepat pada waktunya.
SUPPLY CHAIN PERFORMANCE DAN KINERJA PERUSAHAN Seto Sulaksono Adi Wibowo; Aditya Wirangga
JOURNAL OF APPLIED MANAGERIAL ACCOUNTING Vol 3 No 1 (2019): JOURNAL OF APPLIED MANAGERIAL ACCOUNTING
Publisher : Pusat P2M Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1007.323 KB) | DOI: 10.30871/jama.v3i1.1113

Abstract

This study aims to examine the effect of supply chain performance on firm performance. Supply chain performance is proxyed using inventory turnover and days of supply as independent variables, while company performance is proxyed using the net profit margin as the dependent variable. This research use manufacturing companies listed on the Indonesia Stock Exchange (IDX) for the 2014-2016 period as samples. The purposive sampling method is used to matches the sample criteria. The analysis technique used in this study is multiple regression analysis using the t test. The results of the study found that the inventory turnover variable has a positive influence on company performance, while the days of supply variable has a negative influence on company performance.
Analisa Kepuasan Pelanggan Bandar Udara Hang Nadim Batam Rusda Irawati; Aditya Wirangga; Shinta Wahyu Hati
JURNAL INTEGRASI Vol 4 No 2 (2012): Jurnal Integrasi - Oktober 2012
Publisher : Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Performance measurement of airport BP Batam as the only airport in Batam, comprehensively and continuously need to continue to do so that the parties can know the condition of the Airport management achievement of its performance, evaluate and subsequently a chance to take a strategic decision as well as operational in order to create improved service and performance improvements in the future.The purpose and objective of this research are: (1) To know the influence of the quality of the service for customers satisfaction at the airport Hang Nadim Batam, (2) to know the levels of customers satisfaction at the airport Hang Nadim Batam. From the results of data processing using regression analysis , get the conclusion that, the biggest impact on customer satisfaction is derived from dimension Reliability, Assurance, Tangible, Emphaty and Responsiveness. The influence of service quality on customer satisfaction was at 48 %, and other factors beyond the quality of the service, an influential amounting to 52 %. There is a direct relationship between significant variable quality of service with customer satisfaction, on average 77% declare satisfied, with the sequence of service quality is responsivenes ( 85 % ) , tangible ( 80 % ) , reliability ( 80 % ) , assurance ( 78 % ), and empaty ( 73 % ). Generally average the satisfaction of passengers and users bandara Hang Nadim , was in the category of 3 ( quite satisfied ). Interval in this category is at the level of 0.75 to 0.99