Analisis Pengaruh Penggunaan Hydraulic Engineering Software Terhadap Kinerja Waktu Proyek Perencanaan Sistem Pengelolaan Air Limbah Domestik Terpusat (SPALD-T) Skala Kota Benjamin Julies Lekatompessy; Agus Suroso
Jurnal Aplikasi Teknik Sipil Vol 20, No 1 (2022)
Publisher : Departemen Teknik Infrastruktur Sipil Institut Teknologi Sepuluh Nopember Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1857.285 KB) | DOI: 10.12962/j2579-891X.v20i1.9894

Abstract

Keterlambatan menjadi fenomena yang universal di hampir semua proyek konstruksi di dunia. Hal ini terjadi pada semua tahapan proyek terutama pada tahap konstruksi tetapi tidak sedikit juga terjadi keterlambatan pada tahap perencanaan dan desain [1]. Pada proyek infrastruktur seperti SPALD-T juga seringkali terjadi keterlambatan pada tahap perencanaan. Terdapat cukup banyak faktor penyebab keterlambatan pada fase perencanaan yang salah satunya yaitu masih kurangnya penggunaan Advanced Engineering Software dalam melakukan desain perencanaan proyek [2]. Dalam proyek pemerintah seperti proyek perencanaan SPALD-T tidak sedikit yang masih menggunakan software konvensional seperti Microsoft Excel dalam desain jaringan pipa air limbah sehingga engineer akan membutuhkan waktu yang banyak untuk melakukan proses desain ataupun koreksi. Penelitian ini bertujuan untuk menganalisa pengaruh penggunaan hydraulic engineering software terhadap kinerja waktu pada proyek perencanaan SPALD-T Skala Kota. Dengan menggunakan metode analisis linear berganda dihasilkan bahwa dengan penggunaan hydraulic engineering software terdapat pengaruh positif terhadap kinerja waktu perencanaan proyek SPALD-T sebesar 52,5% karena hydraulic engineering software memiliki faktor-faktor seperti kemudahan analisis, visualisasi jelas, cakupan desain, pengelolaan skenario, desain otomatis, integrasi dengan GIS konversi dan akurasi. Dimana faktor yang paling berpengaruh adalah pengelolaan skenario.
Analisis Faktor Penyebab CCO dan Pengaruhnya Terhadap Biaya Kontraktor Pada Proyek Jalan Tol Zen Tenno; Agus Suroso
Jurnal Aplikasi Teknik Sipil Vol 19, No 3 (2021)
Publisher : Departemen Teknik Infrastruktur Sipil Institut Teknologi Sepuluh Nopember Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (731.523 KB) | DOI: 10.12962/j2579-891X.v19i3.9537

Abstract

This case study showed a 54% increase in Contract Change Order (CCO) work against the initial contract fee. The purpose of this study was to determine the factors that cause the occurrence of CCO, the influence of CCO on the contractor cost performance, and how much CCO affecting the contractor costs performance on toll road projects. The research method was using survey methods and data are processed with multiple linear regression. The results of this research shows that CCO work has the impact of increasing costs because of several factors such as contract documents, stakeholders, design, and construction. The most dominant variables that increase in costs were construction variables with a test value of 2,830, a significant value of 0.007, and a regression coefficient of 0.103. This research greatly influenced the performance of costs on toll road works by 80.9% of the remaining 19.1% described by other variables beyond the regression model analyzed.
Pengaruh Kinerja Kontraktor dan Konsultan Pengawas terhadap Keberhasilan Proyek Jalan Nasional Berbasis Kontrak Long Segment di Provinsi Jambi, Indonesia Ajahar Hasibuan; Agus Suroso
Jurnal Aplikasi Teknik Sipil Vol 21, No 1 (2023)
Publisher : Departemen Teknik Infrastruktur Sipil Institut Teknologi Sepuluh Nopember Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j2579-891X.v21i1.14069

Abstract

Penelitian ini bertujuan untuk menganalisis pengaruh kontraktor dan konsultan pengawas terhadap keberhasilan proyek pemeliharaan jalan nasional berbasis kontrak segmen panjang di Provinsi Jambi, Indonesia. Data yang dikumpulkan dianalisis dan secara kualitatif dan kuantitatif menggunakan program SPSS 26. Hasil penelitian ini menunjukkan bahwa kinerja kontraktor berdampak 52,4% terhadap keberhasilan proyek pemeliharaan jalan nasional berbasis kontrak long-segment di Provinsi Jambi. Sedangkan konsultan pengawas memiliki pengaruh lebih rendah yaitu sebesar 30,3%. Namun demikian, dampak keseluruhan kinerja kontraktor dan konsultan pengawas terhadap keberhasilan proyek pemeliharaan jalan nasional berbasis kontrak long-segment adalah sebesar 56,5%. Sehingga dapat disimpulkan bahwa keduanya merupakan faktor penting dalam keberhasilan proyek jalan nasional di Provinsi Jambi.