Reviana Reviana
Puslitbang Gizi dan Makanan, Badan Litbang Kesehatan Depkes RI

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Penerapan Building Information Modeling (BIM) Menggunakan Software Autodesk Revit 2019 pada Pekerjaan Non Struktur (Studi Kasus : Gedung B Fakultas Ekonomi dan Bisnis Universitas Lampung) reviana, reviana; Bayzoni, Bayzoni; Husni, Hasti Riakara; Siregar, Amril Maruf
Jurnal Rekayasa Sipil dan Desain Vol 11, No 1 (2023): Edisi Maret 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Indonesia's development in the construction sector is progressing very rapidly. With the increasing number of developments in Indonesia, the scale and types of work projects in the field of civil engineering are also increasingly varied. In infrastructure development there needs to be a good system and management. This good system and management can be found in the implementation of Building Information Modeling (BIM) in project implementation. BIM is a process of generating and managing building data in 3D in its project cycle where it can help human limitations in managing data and managing large resources and complex work systems so that errors can be minimized and projects can be analyzed in more depth (Succar , 2008). The purpose of this study was to conduct a study on the use of Building Information Modeling (BIM) in non-structural modeling of Building B, Faculty of Economics and Business, University of Lampung using the Autodesk Revit 2019 software. From the results of the research conducted, non-structural modeling in the form of modeling windows, walls, ceramics , doors and ceilings can be done quickly and well. Then the results of the BoQ comparison between the conventional and Revit methods show a significant difference, this is shown in the difference in brick wall work of -3.91%, the comparison of plastering and plastering work of 6.61%, the difference in the calculation of tiles and bathroom ceilings respectively respectively 3.29% and 4.69%, this is due to differences in calculating the area of brick walls using the conventional method using Revit 2019.
Penerapan Building Information Modeling (BIM) Menggunakan Software Autodesk Revit 2019 pada Pekerjaan Non Struktur (Studi Kasus : Gedung B Fakultas Ekonomi dan Bisnis Universitas Lampung) reviana, reviana; Bayzoni, Bayzoni; Husni, Hasti Riakara; Siregar, Amril Maruf
Jurnal Rekayasa Sipil dan Desain Vol. 11 No. 1 (2023): Edisi Maret 2023
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v11i1.3095

Abstract

Indonesia's development in the construction sector is progressing very rapidly. With the increasing number of developments in Indonesia, the scale and types of work projects in the field of civil engineering are also increasingly varied. In infrastructure development there needs to be a good system and management. This good system and management can be found in the implementation of Building Information Modeling (BIM) in project implementation. BIM is a process of generating and managing building data in 3D in its project cycle where it can help human limitations in managing data and managing large resources and complex work systems so that errors can be minimized and projects can be analyzed in more depth (Succar , 2008). The purpose of this study was to conduct a study on the use of Building Information Modeling (BIM) in non-structural modeling of Building B, Faculty of Economics and Business, University of Lampung using the Autodesk Revit 2019 software. From the results of the research conducted, non-structural modeling in the form of modeling windows, walls, ceramics , doors and ceilings can be done quickly and well. Then the results of the BoQ comparison between the conventional and Revit methods show a significant difference, this is shown in the difference in brick wall work of -3.91%, the comparison of plastering and plastering work of 6.61%, the difference in the calculation of tiles and bathroom ceilings respectively respectively 3.29% and 4.69%, this is due to differences in calculating the area of brick walls using the conventional method using Revit 2019.
Pengembangan Kemampuan Motorik Halus Melalui Kegiatan Menjiplak Reviana, Reviana; Meliarni, Meliarni; Rina, Rina
Jurnal Pendidikan Tuntas Vol. 1 No. 4 (2023): Edisi Desember 2023
Publisher : LPPI Yayasan Almahmudi bin Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37985/jpt.v1i4.245

Abstract

This study was motivated by low fine motor skills in group B children in Terang Bulan Islamic Kindergarten, Bangun Purba Timur Jaya Village. One solution to this problem is to apply plagiarizing activities, this study aims to improve fine motor skills in group B at TK Islam Terang Bulan Desa Bangun Purba Timur Jaya. The method used in this study is the Classroom Action Research (PTK) method. This class action research is carried out as many as 2 cycles, in each cycle there are 2 meetings. Data collection techniques used observation and documentation. The results of this study showed an increase in children's scores from pre-action, it was known that the BB value in pre-action was 10 children or 75%, then in cycle 1 it became 6 children or 60% then in cycle II it became 0 children or 0%. MB value in pre-action 4 children or 24.90%, then in cycle 1 to 2 children or 18.18% in cycle II to 0children or 0%. The BSH value in the actions was 1 child or 9.09%, then in cycle 1 it became 3 children and in cycle II it became 4 children or 29.27%. The BSB value in preaction 0 children or the next 0% in cycle 1 became 4 children or 29.27% and in cycle II there were 8 children or 72.73%. Based on the results of the above research, the researcher suggested to teachers to make the activity as an alternative activity in improving children's fine motor. Keywords: Fine Motor, Cramping activities, classroom action research.