Oktari Rabiatussyifa
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Permasalahan Ergonomi pada Area Kerja Bagian Produksi dan Permesinan di PT X Karawang dengan Menggunakan Metode Ergonomic Checkpoint Azizah Dian Ardhani; Dene Herwanto; Oktari Rabiatussyifa
Jurnal Ilmiah Wahana Pendidikan Vol 8 No 3 (2022): Jurnal Ilmiah Wahana Pendidikan
Publisher : Peneliti.net

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (193.168 KB) | DOI: 10.5281/zenodo.6301678

Abstract

In the industrial world, ergonomics is an important aspect that needs to be implemented. In view of work accidents often occur in a company. Ergonomics aspect is useful to minimize the occurrence of accidents due to work. PT X Karawang is a company engaged in fabrication and machining. The rate of work accidents in the company is quite high. Therefore, this study aims to identify whether the application of ergonomic aspects in the production and machining work area at PT X Karawang has been carried out optimally or not, due to the high level of work accidents that occur in the company. This research was conducted using the ILO (International Labor Organization) Ergonomic Checkpoint method by assessing 132 questions regarding the sub-aspects of material storage, suitability of tool sizes, production machine safety, lighting in the work area, hazards in the work environment, and others by ticking the criteria "good" and "not good". The results showed that as many as 78 sub-aspects in the work area of ​​the production and machining section of PT X Karawang obtained the "good" criteria, and 23 sub-aspects received the "not good" criteria, namely not meeting occupational health and safety standards. Suggestions for improvement for each sub-aspect of the 23 sub-aspects that get a "not good" score have been given to improve the application of ergonomics aspects at PT X Karawang
Analisis Produktivitas Mesin Buffing Menggunakan Metode Overall Equipment Effectiveness (OEE) Di PT. XYZ Cikarang, Jawa Barat Oktari Rabiatussyifa; Fahriza Nurul Azizah; Azizah Dian Ardhani
Jurnal Ilmiah Wahana Pendidikan Vol 8 No 3 (2022): Jurnal Ilmiah Wahana Pendidikan
Publisher : Peneliti.net

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (351.441 KB) | DOI: 10.5281/zenodo.6301691

Abstract

This study discusses the analysis of the productivity of the buffing machine at PT. XYZ Cikarang, West Java. PT. XYZ is an industry that stands in the field of car body parts for four or more wheeled motor vehicles and industrial services for various special works of metal and metal goods. The method used in this research is Overall Equipment Effectiveness (OEE). The purpose of this study is to evaluate the condition of the buffing machine, which often occurs in damage which causes a decrease in machine productivity and production. As a result of these problems, it is necessary to repair machines which incur costs and the production process becomes constrained. Overall Equipment Effectiveness (OEE) is a method for measuring engine performance by taking into account the three important ratios, namely, Avaibility Rate, Performance Rate and Quality Rate. The results obtained from this study are the Avaibility Rate and Performance Rate values ​​are still below the standard they should be, namely the Avaibility Rate value of 61.36% and the Performance Rate value of 54.09%.