Pemetaan Lingkungan Kerja Fisik pada Lantai Produksi IKM “ABC” dengan Software Surfer Rahmaniyah Dwi Astuti; Bambang suhardi; Wakhid Ahmad Jauhari; NIdya Yutie Pramesti
Performa: Media Ilmiah Teknik Industri Vol 18, No 2 (2019): Performa: Media Ilmiah Teknik Industri
Publisher : Industrial Engineering, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1194.962 KB) | DOI: 10.20961/performa.18.2.33600

Abstract

Kenyamanan termal sangat berpengaruh terhadap proses produksi, kenyamanan termal itu sendiri salah satunya dipengaruhi oleh kelembaban udara. Penelitian ini bertujuan untuk mengetahui distribusi kelembaban udara pada lantai produksi IKM”ABC” melalui pemetaan dengan software surfer dan untuk mengetahui tingkat kenyaman termal pekerja sesuai dengan Keputusan Menteri Kesehatan Republik Indonesia Nomor 1405/Menkes/SK/XI/2002. Metode yang digunakan dalam penelitian ini adalah pengambilan data kelembaban udara dengan pengamatan langsung sesuai dengan titik yang telah ditentukan dengan berdasarkan SNI 16-7062- 2004 yang nantinya akan diolah melalui software surfer. Dari penelitian ini didapatkan bahwa rata-rata kelembaban udara keseluruhan adalah sebesar 68.1% dan dari peta kontur didapakan bahwa tidak terdapat zona aman pada lantai produksi IKM”ABC’ karena nilai kelembaban udara di semua area melebihi NAB yang telah ditentukan
Perbaikan Line Balancing Proses Packing Tablet XYZ Menggunakan Metode Ranked Positional Weight di PT. Y Hana Sekar Ayu Edy purwanto; Rahmaniyah Dwi Astuti
Performa: Media Ilmiah Teknik Industri Vol 18, No 1 (2019): Performa: Media Ilmiah Teknik Industri
Publisher : Industrial Engineering, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20961/performa.18.1.32360

Abstract

PT. Y is a company in the pharmaceutical industry that produces finished drugs. Based on observations in the packing process of Tablet XYZ products, it is still found that there are bottlenecks between work stations caused by a lack of equal distribution of work. Work stations whose workload is not evenly distributed, can cause the low of line efficiency. This study improved line balancing using the Ranked Positional Weight method which aims to increase the line efficiency value of the Tablet XYZ packing process. The result of this study is an increase in the value of line efficiency after the distribution of work elements is evenly distributed.
Penerapan Value Stream Mapping (VSM) Untuk Mengurangi Keterlambatan Proses Pengadaan Barang dan Jasa di PT X (Studi Kasus Pengadaan Barang dan Jasa A4100000121) Rahmaniyah Dwi Astuti; Frisheila Sely Apriliana
Performa: Media Ilmiah Teknik Industri Vol 17, No 1 (2018): PERFORMA Vol. 17, No 1 Maret 2018
Publisher : Industrial Engineering, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (714.766 KB) | DOI: 10.20961/performa.17.1.21510

Abstract

PT X is an oil and gas company, to support its production a good procurement process is needed. Procurement is an activity to get goods and services in a transparent, effective and efficient. Based on data in 2017, there are 148 procurement with a value of less than 2.5 billion carried out by PT X, from that data there are 43% of the procurement completed exceeding the predetermined initial target. Based on data in 2017, the procurement of A4100000121 has the highest delay rate of 32 days, therefore it is necessary to identify waste as an effort to reduce the time delay. The method used is Value Stream Mapping, this method is used to identify processes that contain waste so that existing waste can be removed. Based on the results of the study there was a decrease in time between Current State VSM and Future State VSM with a total time at Current State VSM of 39425 minutes and Future State VSM of 23085 minutes so that the time was decreased by 16340 minutes.