Hermawan Adi Tanjung
Fakultas Teknologi Industri, Universitas Islam Indonesia, Yogyakarta

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Minimasi Slack Time pada Penjadwalan Make To Order Job Shop Ali Parkhan; Hermawan Adi Tanjung
Performa: Media Ilmiah Teknik Industri Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (530.174 KB) | DOI: 10.20961/performa.4.2.11180

Abstract

In manufacturing Make to Order environment, order usually can be negotiated in order to satisfycustomer need while it remains considering resources availability. Scheduling is utilized in a company to get higher efficiencies in production, minimize makespan and meet due date. There are some decisions related in scheduling activity i.e. sequencing, routing and determining starting time and finishing time of jobs. This paper will present application of Integer Linear Programming (ILP) and Critical Path Method (CPM) in scheduling. The methods are employed to determine due date that minimize slack time. This study resulted an optimal sequencing and routing of the jobs.