Evaluation Of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method Mohammad Irfandio Kurniawan; Diah Ayu Restuti Wulandari; Julistyana Tistogondo
Neutron Vol 21 No 1 (2021): JULY 2021
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Project development and how to control time and costs in the construction project of a public junior high school 1 Surabaya. This research was conducted with the aim of knowing and comparing the amount of duration and cost after acceleration by using the alternative Earned Value Analysis. The case study in this research takes the construction project of a public junior high school 1 Surabaya which is located in Surabaya. The data needed in this study include the S curve, recapitulation of project cost calculations, a list of budget plans (RAB), and a list of unit wage prices for workers. The research method used is to design network planning, calculate the cost variance and variance schedule for each activity that changes due to changes in the duration of implementation, acceleration of work duration, and determination of the optimum cost and duration due to the application of the Earned Value Analysis method. For the calculation of the variance Schedule on week 34 shows a positive result of Rp. 109,550,470. For the calculation of the cost variance from week 34 shows - Rp. 2,488,159. For the calculation of Estimate at completion (EAC) on week 34 of Rp. 6,663,998,229. For the calculation of Estimate temporary schedule, the evaluation week 34 experienced a delay of 53 days from the original schedule. So the work completion time is 233 calendar days
Risk Analysis of Delay in The Construction Project Rio Kurniawan Budi Soeseno; Diah Ayu Restuti Wulandari; Koespiadi Koespiadi
Neutron Vol 21 No 1 (2021): JULY 2021
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The complex problems that existed during the Field Implementation in the SMP Negeri 1 Surabaya project at that time caused some work that was not as planned both in terms of time, quality and cost which resulted in overbudget and overtime. When experiencing overbudget and overtime, it is necessary to have good cost, quality and time management. Good management should not only be owned by the project owner. The length of time to complete the project has a big effect on the increase in the overall project cost. Therefore, daily, weekly and monthly progress reports are needed to report work results and completion times for each project work item. Furthermore, this work is compared with the completion time of the plan so that the completion time can be controlled for each period. This is because the construction of the building has a delay in time so that it can cause disruption in some field operations. The analysis that I have done is viewed from all of them (owner and contractor). This study uses the AHP (Analytical Hierarchy Process) research method because AHP is used to derive the ratio scale of several paired comparisons that are discrete or continuous. Other problems such as inconsistencies in planners, supervisors, executors, and other authorities in the field, namely lack of communication and late making decisions such as changes in design and changes in calculations that are in implementation and planning so that the project results in time and cost delays, and other problems. such as material calculations and others, there are also delays caused by delays in making decisions in implementation. Because of that, the project for the Public Junior High School 1 in Surabaya experienced delays in several jobs, namely the foundation, column, ladder, and beam work, which should have been done in 1-2 months to 3-4 months. In terms of implementation, such as lack of communication between planners, supervisors and implementers as well as other authorized officials, a good communication is needed. So that it does not cause so many problems and can reduce delays in terms of implementation in the field.