This Author published in this journals
All Journal Bina Teknika
Rio Patria
Fakultas Teknik Universitas Pembangunan Nasional “Veteran” Jakarta Jl. RS Fatmawati – Pondok Labu Jakarta Selatan 12450, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PEMILIHAN SUBKONTRAKTOR PT X DENGAN METODE ANALYTICAL HIERARCHY PROCESS Lilik Zulaihah Rio Patria; Rio Patria
Bina Teknika Vol 12, No 1 (2016): Bina Teknika
Publisher : Faculty of Engineering UPN "Veteran" Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (671.133 KB) | DOI: 10.54378/bt.v12i1.95

Abstract

PT. X is a company engaged in the field of engineering services procurement and construction (EPC), whose scope of work is the provision which has activities such as selecting subcontractors and evaluate the performance of subcontractors and building maintaining relationship with subcontractors. The selection of subcontractors has been less effective, because the show just based on the lowest offer and mere instinct of managers. So that when the project goes arises the problem stems from a subcontractor who is not taken into account before. This research helps decision maker in making the decision to choose a subcontractor in the project Based Oil Flushing (BOF) by integrating Analytical Hierarchy Process (AHP) method. AHP is used to determine the weight of the priority with seven aspect of the three first priorities of quality aspects, financial aspects, and aspects of the company’s reputation, and is also used to determine the weight AHP priorities of the twenty-three criteria with three first priority the offer price, quality assurance, and work experience. Of the four subcontractors research result into the most optimal subcontractor, chosen in accordance with the value of the achievement of targets is limited to the smallest deviation from other subcontractors.