Claim Missing Document
Check
Articles

Found 2 Documents
Search

PENGARUH KETERLAMBATAN PROSES PENGADAAN TANAH TERHADAP PENCAPAIAN WAKTU PROYEK M. Arif Nugraha; Cut Zukhrina Oktaviani; Alfa Taras Bulba
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 5, No 1 (2022): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v5i1.25451

Abstract

Land acquisition for the Jambo Aye Kanan Irrigation Network of ± 35 kilometers was started in 2010 and is currently around 28 kilometers or ± 70% of the total land acquisition. The Lhok Guci irrigation network of ± 90 kilometers was started in 2007 and is currently around 45 kilometers or ± 50% of the total land acquisition. It can be concluded that if the land acquisition has not been completed, the project work will be carried out as an addendum. In general, a contract addendum is an addition to the main agreement. Additions or changes that are attached cannot be separated from the main agreement, must remain in accordance with the unity of the agreement. Addendum to this contract can be made even though the term of the agreement has not ended, as long as all parties agree. Based on the description above, the problems identified are what factors are causing delays in land acquisition and the impact of the land acquisition process on the project time. This study aims to identify the effect of the land acquisition process on the achievement of project time performance. The results of this study are expected to be one of the references and information to overcome the problems that have resulted in delays in the completion of the Jambo Aye Kanan irrigation network project and the Lhok Guci irrigation network. The method used in this research is correlation analysis. The results of the correlation analysis using the SPSS application that have a relationship with the land acquisition process on the achievement of time performance are funds/funding, coordination and price. The result of the highest correlation analysis of the factors that influence land acquisition on time performance is the price variable. The correlation of the variables that affect land acquisition with laws and regulations on the time performance variable has a high correlation.
IDENTIFIKASI RISIKO BIAYA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG BAGI PERUSAHAAN KONTRAKTOR Alfa Taras Bulba; Anita Rauzana; Ikhlas Kurniawan
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 8, No 2 (2022): Jurnal Teknik Sipil dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (501.131 KB) | DOI: 10.35308/jts-utu.v8i2.6284

Abstract

One aspect that is needed in the implementation of infrastructure development is the availability of funds or capital from the government. Budget proposals from local governments are sometimes not the same as those approved by the legislature. area. The approved budget sometimes does not match the value of the Engineering Estimate work that has been generated from the DED planning. So this affects the execution of the work. There are several conditions that directly affect cost overruns in the implementation of building construction work. Some of these conditions include inadequate worker qualifications, procurement of materials that are sometimes not in accordance with the implementation time, natural conditions that sometimes delay the completion of work or natural disasters such as floods, inappropriate implementation methods, implementing management who do not understand the implementation conditions as well as several other conditions. In connection with these problems, this study wants to analyze the dominant risk factors that affect the cost of implementing building construction projects in Aceh Province. This research is a quantitative research. Based on this research, the dominant factor influencing the cost of implementing building construction projects in Aceh is force majeure with a mean value of 4.353.