Faisal Faisal
Magister Teknik Sipil, Fakultas Teknik, Universitas Syiah kuala, Banda Aceh

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

KAJIAN KESIAPSIAGAAN PENGGUNA BANGUNAN PUBLIK TERHADAP BENCANA ALAM GEMPA BUMI PADA KANTOR GUBERNUR PEMERINTAH ACEH Faisal Faisal; Munirwansyah Munirwansyah; Eldina Fatimah
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 2, No 3 (2019): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v2i3.13462

Abstract

The province of Aceh was struck by a massive earthquake and tsunami on Sunday, December 26, 2004. The earthquake and tsunami disaster killed 173,741 people and 116,368 people were missing. The earthquake and tsunami in Aceh Province resulted in thousands of houses and public buildings being damaged and caused almost half a million people to be refugees. This study aims to determine the level of preparedness for earthquake disasters on users of public buildings Office of the Governor of Aceh Government. This research uses survey method by distributing questionnaires to users of public buildings and observing the building of the Governor’s office of Aceh Government. The selection of samples in the field is using probability sampling method with purposive sampling technique which is the technique in determining the sample with certain considerations. Secondary data was obtained from literature review and previous research. Data processing uses analysis of validity and reliability and descriptive analysis with index frequency analysis. This study begins with the pre-survey process, where testing is conducted on the questionnaire to determine the level of validity and reliability in each item of statement tested so that the validity value is 0.312 greater than 0.3 and the reliability value is 0.613 greater than 0.6. The results of field observations have not yet fully indicated the components of public buildings that are ready to deal with earthquake. From the results of the frequency analysis the index obtained is as follows; aspect of knowledge and attitude has a score of 62% (good), aspect of policy and guidelines has a score of 66% (good), aspect of emergency response plans has a score of 65% (good), aspect of disaster warning systems has a score of 65% (good) and aspect of mobilization of resources has a score of 62% (good)
STUDI PENINGKATAN INTENSITAS LUAS DAN POLA TANAM PADA DAERAH IRIGASI KRUENG JREUE Faisal Faisal; Alfiansyah Yulianu; Ella Mailianda
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 1, No 3 (2018): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v1i3.11783

Abstract

Krueng Jreue irrigation area is one of the oldest irrigation in Aceh Besar district, located in the District of Indrapuri, was inaugurated in 1972 by President Soeharto. Rice area irrigated by this irrigation is 4277.6 ha. Jreue Krueng irrigated areas have rice-rice cropping intensity of plants ranging from 158% to 156%. The intensity of these plants are still below the expected crop intensity, is equal to 200%. To increase the intensity of these plants, it is necessary to study the increased intensity of Krueng Jreue tanamana irrigation area by selecting the appropriate alternative cropping patterns according to the water balance. This study aims to determine the amount of discharge mainstay available on the weir, know the size of the crop water requirement for each alternative, determine optimal crop area that can be irrigated by water that is available, and conduct studies on water balance based cropping planned. Expected to describe the water balance of alternative cropping patterns were obtained. The method used in this research including data collection and data analysis to determine the mainstay discharge, water irrigation, cropping pattern and cropping intensity. The study results obtained by the intensity of the plants can reach 200% by the water supply system using the technical rotation irrigation area is divided into two groups. The first type, cropping season from October period to 2. The second class of the cropping season from November to 2.
HUBUNGAN DAN PENGARUH FAKTOR - FAKTOR RISIKO DESIGN AND BUILD TERHADAP KESUKSESAN PROYEK PEMBANGUNAN SEKOLAH PERMANEN DI KABUPATEN PIDIE JAYA DAN BIREUEN Faisal Faisal; Abdullah Abdullah; Mochammad Afifuddin
Jurnal Arsip Rekayasa Sipil dan Perencanaan Vol 2, No 4 (2019): Jurnal Arsip Rekayasa Sipil dan Perencanaan
Publisher : Prodi Magister Teknik Sipil Unsyiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jarsp.v2i4.14952

Abstract

The earthquake on December 7, 2016 measuring 6.4 on the Richter Scale (SR), which hit the districts of Pidie, Pidie Jaya and Bireuen, has caused fatalities, damage to infrastructure and public facilities. In an effort to accelerate post-disaster rehabilitation and reconstruction, based on INPRES No. 5 of 2017, Aceh Provincial Building and Environmental Management Work Unit of the Ministry of Public Works and Public Housing, carried out the rebuilding of permanent schools using RISHA construction technology with a system of design and build contracts in Pidie Jaya District and Bireuen. This study aims to analyze the relationship and influence of design and build risk factors on the success of permanent school construction projects in Pidie Jaya and Bireuen Districts. This study uses qualitative and quantitative methods. Respondents were directed at 13 planning personnel, 25 implementing personnel, 21 construction management personnel and 13 owner staff. The independent variables in this study are the risk factors of design and build which consist of the owner management ability factor, procurement process, planning ability, implementation ability, project manager's ability, and project scope factors, while the dependent variable is the success of the project. The results of the study show that there is a low level of relationship between the factors of the project manager's ability, a sufficient level of relationships from the factors of implementation ability, procurement processes and project scope factors, a high level of relationship between planning ability factors and management owner's ability factors to project success. All design and build risk factors have a significant effect on project success, which is 68.8%. The dominant factor affecting project success is the project scope factor, with a regression coefficient of 0.162. In this case if the project scope factor is handled properly by all parties involved, then the success of the project will increase by 16.2%.