This Author published in this journals
All Journal PROMINE
Muhammad Bagaskoro
Prodi Teknik Pertambangan, Institut Teknologi Nasional Yogyakarta

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Kajian Teknis Dewatering System Tambang Pada Pertambangan Batubara A.A Inung Arie Adnyano; Muhammad Bagaskoro
PROMINE Vol 8 No 1 (2020): PROMINE
Publisher : Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/promine.v8i1.1794

Abstract

Coal mining by PT. Tambang Bukit Tambi uses an open pit mining system where one of the factors that can affect mining is water that entering the mining area, so water control must be carried out, one of the ways is by using mine dewatering system. The purpose of this study is 1) To know the debit of water entering the mining area. 2) To design a pumping plan 3) To create an ideal sump design for handling water that entering the mining area. Based on the research, the daily discharge is 32,243.36 m3 / day where the water discharge that can be released by 2 Kenflo XA 125 / 40B pumps is 640 m3 / hour in 50.38 hours and the water control effort is made a sump that must accommodate water amounting to 19,427.26 m3 and after the calculation is obtained a trapezoid-shaped sump design with size length and surface width of 63.7 m, length and width of the base of the sum of 60.9 m and depth of 5 meters.