EVALUASI DOKUMEN ASPEK TEKNIS PADA PROSES PELELANGAN KONTRAKTOR DENGAN APILKASI METODE AHP (ANALYTICAL HIERARCHY PROCESS) Wibowo, M.Agung; Suliantoro, Heri; Marithyanti, Shinta
TEKNIK Volume 32, Nomor 2, Tahun 2011
Publisher : Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (197.736 KB) | DOI: 10.14710/teknik.v32i2.1728

Abstract

The procurement process could be defined as all the activities required in getting a product or a service from thesupplier to the customer. It consists of the purchasing function, storing, transportation and managers therelations between suppliers and internal customers. The Analytical Hierarchy Process (AHP) is acomprehensive, logical structured frame work. It allows to improve understanding of complex decission systemby decomposing the problems. The AHP is based three principles which are decomposition of the problems,comparative judgement of the elements and synthesis of the priorities.The objectives of this study are to identify criteria involved in the contractor bidding process, to elaboratetechnical aspect involeved in the bidding process based on committee’ experince and to discuss and to comparethe outputs obtained based on the committee’ experience and the application of the AHP.The results of the study said that construction method has the highest ranking compare other apecst which is27%. The next ranking are time scheduling (16%), technical specification and material (13%), organizationalproject and person incharged (10%), construction labour scheduling (10%), list of equipment (8%), cash flowestimation (6%), list of sub-contractor and project site facilities (5%). These rangking could be used todetermine the score of contractors to do bidding process.
STUDI PUSTAKA : ANALISA PENGARUH DESAIN TERHADAP DIRECT WASTE DAN INDIRECT WASTE YANG TERJADI PADA TAHAP KONSTRUKSI Safitri, Pebriani; Salsabila, Sarah; Wibowo, M.Agung; Kistiani, Frida
Jurnal Karya Teknik Sipil Volume 6, Nomor 4, Tahun 2017
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (326.28 KB)

Abstract

Construction waste (direct waste dan indirect waste) seringkali terjadi pada pelaksanaan proyek konstruksi. Tanpa disadari salah satu penyebab terjadinya construction waste adalah desain yang unik, baik itu desain asli maupun desain yang berubah. Oleh karena itu, tugas ini dilakukan untuk menganalisa besarnya pengaruh desain terhadap construction waste. Penelitian ini dilakukan pada salah satu proyek konstruksi yang sedang berjalan di Semarang yaitu proyek Marquis de Lafayette. Metode yang digunakan adalah studi pustaka dan wawancara (validasi). Dari analisa yang telah dilakukan didapat bahwa menurut beberapa penelitian terdahulu desain / perubahan desain adalah salah satu penyebab terjadinya waste pada tahap konstruksi dan dan berdasarkan hasil validasi bahwa responden / site manager mengatakan bahwa desain / perubahan desain merupakan salah satu faktor yang menyebabkan terjadinya waste pada proyek Marquis de Lafayette. Maka dapat disimpulkan bahwa desain / perubahan desain dapat berpengaruh terhadap waste (direct & indirect) yang terjadi pada tahap konstruksi, besar kecilnya pengaruh tersebut dapat dipengaruhi oleh beberapa hal, namun desain/perubahan desain merupakan salah satu faktor utama penyebab terjadinya waste pada tahap konstruksi.