This Author published in this journals
All Journal Logistik
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Analisis Faktor-Faktor yang Menghambat Kegiatan Bongkar Muat Peti Kemas Impor di Terminal 3 Internasional PT. Tangguh Samudera Jaya Kencana Verawati; Hendri Dunant Hamidi; Dadang Suyadi S; Randy Putro; Henita Rahmayanti; Anthony Costa
LOGISTIK Vol 15 No 01 (2022): Logistik
Publisher : Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/logistik.v15i01.26859

Abstract

Penelitian ini bertujuan untuk menganalisis faktor-faktor yang menghambat kegiatan bongkar muat petikemas impor di Terminal 3 Internasional PT. Tangguh Samudera Jaya menjadi lebih efektif, penyusunan laporan tugas akhir ini menggunakan pengumpulan data baik dalam bentuk primer maupun sekunder. Data primer yang dimaksud berupa wawancara serta observasi pada saat proses bongkar muat sedang berlangsung. Data sekunder berupa data standar operasional prosedur bongkar peti kemas dan data idle time operasional bongkar muat. Setiap kegiatan pada proses stevedoring dan cargodoring bongkar peti kemas memiliki standar yang telah ditetapkan oleh pihak perusahaan dan jika pada saat pelaksanaannya terdapat hambatan itu semua akan dirangkum ke dalam laporan idle time setiap bulannya. Faktor-faktor yang menghambat telah dikelompokkan menjadi 4 bagian, seperti man, weather, machine, dan method. Setelah dilakukan analisis, dapat disimpulkan bahwa faktor machine menjadi yang paling signifikan dalam menghambat kegiatan bongkar peti kemas impor, hal tersebut terjadi diakibatkan karena beberapa masalah yang timbul pada alat saat sedang beroperasi.
OPTIMALISASI LAPANGAN PENUMPUKAN PETIKEMAS PADA LAHAN TERBATAS TERHADAP KINERJA BONGKAR MUAT.docx Muhammad Lorenzo; Hendri Dunant Hamidi
LOGISTIK Vol 11 No 2 (2018): Logistik
Publisher : Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

To find out how the process of container stacking field service in order to optimize service to be effective and efficient. In processing goods service at PT. There are 3 types of services provided at Tanjung Priok Port, namely receiving, stacking and loading services. The goods referred to here are containers, services are provided so that the loading and unloading process runs effectively and efficiently.
IMPLEMENTASI KOMPONEN SISTEM FASILITAS TRANSPORTASI TERHADAP BATAS SRP DAN WAKTU TUNGGU LAYANAN KEBERANGKATAN DAN KE.docx Rocky Abisai Benaya Sitorus; Hendri Dunant Hamidi
LOGISTIK Vol 11 No 2 (2018): Logistik
Publisher : Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/logistik.v11i2.17682

Abstract

One of the functions of a public transport terminal that has a function as a temporary stopover from road transport activities. Likewise with the function of the Pulo Gebang Integrated Terminal which has a function as a point transit and a temporary stop from road transportation activities for the AKAP Bus and the AKDP Bus. In carrying out its function as a terminal, safe, smooth and comfortable circulation is required. Start the bus in the position in front of the terminal door, or when the bus is in a position outside the terminal door. The smooth circulation of the terminal will have an impact on parking capacity and service waiting times, which in turn will result in the smooth departure and arrival of buses at the Pulo Gebang Integrated Terminal.In order to expedite the circulation of the activities of the arrival and departure of the AKAP Bus at the Pulo Gebang Integrated Terminal, needed problem solving is regarding the implementation of the SOP. AKAP Bus departures and arrivals. By the authors conducted research by collecting various kinds of research data while carrying out the Job Training (PKL) there. The data collection process was carried out by using various methods, such as: field observation techniques, interview techniques, and requests for permission to request data on the daily reports of AKAP Bus departures and arrivals. Then, the collected data is reviewed and it is hoped that it can become a solution for the performance in the Operational Unit and the Integrated Terminal Partnership Pulo Gebang in carrying out operational activities for the departure and arrival of the AKAP Bus.The results of this study found obstacles that occurred during the implementation process of the facility system component activities against the limit SRP and bus operational service time at the Pulo Gebang Integrated Terminal. This is supported by the daily data on the arrival and departure of the AKAP Bus at the Pulo Gebang Integrated Terminal.