Djoko Windarto
Jurusan Teknik Elektro, Universitas Diponegoro Semarang Jl. Prof. Sudharto, SH, Kampus UNDIP Tembalang, Semarang 50275, Indonesia

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

SISTEM INFORMASI LAPORAN HARIAN PRODUKSI BERBASIS WEB DI PT PLN PEMBANGKITAN PLTU SEKTOR REMBANG Mihanora, Shabrina; Isnanto, R. Rizal; Windarto, Djoko
Transient: Jurnal Ilmiah Teknik Elektro TRANSIENT, VOL. 3, NO. 4, DESEMBER 2014
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (407.906 KB) | DOI: 10.14710/transient.3.4.487-492

Abstract

Abstrak Perkembangan teknologi yang sangat pesat dari tahun ke tahun telah memberikan dampak yang sangat besar bagi dunia, terutama bagi manusia. Teknologi yang telah ada terus dikembangkan untuk mendapatkan cara yang mudah dan cepat dalam memenuhi kebutuhan hidup manusia. Salah satunya kemudahan dan kecepatan dalam pengambilan informasi. Guna memproses data menjadi informasi, komputer membutuhkan rangkaian program sistem informasi. Untuk memenuhi kebutuhan kecepatan dan kemudahan pengaksesan informasi tersebut, dibuatlah sistem informasi. Dan kali ini,  perusahaan yang dibuat system informasinya yaitu di PT PLN Pembangkitan PLTU Sektor Rembang. Sistem Informasi ini pun dibuat berbasis website agar mempermudah dalam pengolahan data dimanapun dan kapanpun dalam batasan keamanan yaitu user password serta membuat tiga tingkatan user yakni Admin, Operator dan Guest . Sistem Informasi ini yang akan dibuat ini digunakan bahasa pemrograman berbasis Web yaitu PHP dan MySQL. Kata kunci: Sistem Informasi, PLTU,  PHP,MySQL Abstract The Development of technology rapidly changing over a years has provide an enourmous impact for the world, especially to human. Recent technology continue to be developed to get an easy and quick way to get human life needed. One of them is the ease and speed in information retrieval. In order to process the data into information, computer information systems require a range of programs. To meet the needs of speed and ease of accessing information, the information systems was made. And this time, the company made the information system is in PT PLN Generation Power Plant Sector Apex. This information system is made based website in order to simplify the processing of data anywhere and anytime within the limits of the user password security and user make three levels namely Admin, Operator, and Guest. This information system is to be made use of Web-based programming language is PHP and MySQL. Keyword: Information System, PLTU,  PHP,MySQL
SISTEM MANAJEMEN PEMELIHARAAN PEMBANGKIT LISTRIK TENAGA UAP (PLTU) REMBANG SECARA ONLIN Rudiyanto, Dony Bagus; Isnanto, R. Rizal; Windarto, Djoko
Transient: Jurnal Ilmiah Teknik Elektro TRANSIENT, VOL. 2, NO. 2, JUNI 2013
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (347.202 KB) | DOI: 10.14710/transient.2.2.289-295

Abstract

Abstrak Perkembangan peradaban manusia telah memacu peningkatan kebutuhan baik dalam jumlah, variasi jenis dan tingkat mutu. Perkembangan ini menimbulkan tantangan untuk dapat memenuhi keinginan tersebut dengan cara meningkatkan kemampuan menyediakan dan menghasilkan produk yang baik. Peningkatan kemampuan penyediaan atau produksi barang merupakan usaha yang harus dilakukan oleh perusahaan untuk dapat memenuhi kebutuhan secara efektif dan efisien. Dalam mencapai tujuan dan sasaran perlu dilakukan upaya untuk mendapatkan cara-cara yang lebih baik, salah satunya dengan membangun sistem manajemen pemeliharaan secara online. Manajemen Pemeliharaan didefinisikan sebagai “Organisasi pemeliharaan yang sesuai dengan kebijaksanaan yang disetujui top manajemen”. Sistem ini dirancang menggunakan bahasa pemograman PHP dan MySQL. Dari hasil penelitian yang dilakukan dapat disimpulkan antara lain, Memiliki menu-menu yang dapat membantu pengguna dalam melakukan pengolahan data serta memberikan informasi mengenai manajemen pemeliharaan. Membantu pengguna untuk memantau dari jarak jauh asalkan terhubung ke jaringan. Hasil dari sistem manajemen pemeliharaan ini disajikan dalam bentuk data activity yang nantinya akan dilakukan evaluasi lebih lanjut. Kata Kunci : manajemen pemeliharaan, PLTU, PHP, MySQL  Abstract The development of human civilization has accelerated an increased requirement in number, variety type and quality level. This development poses a challenge to be able to fulfill this requirement by increasing the ability to provide and produce a good product.  Increased capacity of production of goods or the provision of an effort should be made by the company to meet the needs effectively and efficiently. In achieving the objectives and targets need to be an attempt to get a way better way, one of them by building a maintenance management system online. Maintenance Management is defined as "maintenance organizations in accordance with the policy approved top management". The system was designed using PHP programming language and MySQL database. From the research conducted it can be concluded, among others, Have menus that can help the user in performing data processing as well as provide information on maintenance management. Helps users to monitor remotely connected to the network as long. Results of the maintenance management system is presented in the form of data packages which will be evaluated further. Key words: Management maintenance,PLTU, PHP, MySQL
SISTEM INFORMASI POTENSI DAN ANALISA PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH) DI INDONESIA MENGGUNAKAN PEMROGRAMAN PHP Wicaksono, Purbo Adi; Somantri, Maman; Windarto, Djoko
Transient: Jurnal Ilmiah Teknik Elektro TRANSIENT, VOL. 2, NO. 2, JUNI 2013
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (377.711 KB) | DOI: 10.14710/transient.2.2.380-388

Abstract

Abstrak Energi listrik telah menjadi bagian dari kebutuhan hidup manusia. Seiring dengan bertambahnya jumlah penduduk, kebutuhan energi listrik pun semakin meningkat. Oleh karena itu dibutuhkan sumber energi alternatif lain yang mampu mencukupi semua aspek kehidupan manusia,seperti Pembangkit Listrik Tenaga Mikrohidro (PLTMH). Pembangkit Listrik Tenaga Mikrohidro merupakan salah satu bentuk energi alternatif yang menggunakan tenaga air sebagai tenaga penggeraknya. Pada penelitian ini dibuat sistem informasi PLTMH untuk menganalisa studi kelayakan perencanaan pembangkit listrik tenaga mikrohidro. Pada sistem ini dianalisa berdasarkan pada banyaknya debit air andalan, diambil salah satu pada perencanaan di sungai Logawa Kec. Kedungbanteng. Parameter yang digunakan untuk analisa adalah hasil perhitungan keluaran daya dan Pay Back Period (PBP). Hasil penelitian menunjukkan bahwa debit air sungai Logawa mampu membangkitkan daya minimal sebesar 728,13 kW. Energi listrik yang dapat dijual ke PT.PLN (Persero) sebesar 592 kWh. Berdasarkan hasil perhitungan diperoleh biaya investasi yang dibutuhkan untuk merealisasikan pembangkit listrik tenaga mikrohidro di sungai Logawa sebesar Rp. 14.943.992.745,-. Pay Back Period (PBP) = 3,8 tahun. Hal ini berarti pembangkit listrik tenaga mikrohidro layak  untuk direalisasikan. Kata kunci: energi listrik, mikrohidro, pltmh, analisa studi kelayakan   Abstract Nowadays electricity become one of energy sources for human being. Along with the population increase, the needed to the electrical energy is also rise rapidly. Therefore alternative energy sources that can meet all human needed is required such as micro hydro power plant (PLTMH). PLTMH is one of alternative energy resources, which uses hydropower as its energy sources. In this research the information systems PLTMH was made, for planning feasibility studies to analyze micro hydro power plant. The analysis was based on the amount of water discharge in the Logawa River Kedungbanteng Sub-Distric. The parameters were used to measure the feasibility analysis were power output and Pay Back Period (PBP). The results of the research showed that water discharge in the Logawa River was able to generate a minimum energy of 728,13 kW. The electrical energy which could be sold to PT PLN (Persero) was 592 kWh. Based on the calculations, the cost of the investment required for the realization of a mini hydro power plant on the Logawa River was Rp. 14.943.992.745,- which Pay Back Period (PBP) = 3,8 years. It means the mini-hydro power plant is possible to be realized. Keywords: electrical energy, micro-hydro, pltmh, feasibility study analysis