SELECTION AND EVALUATION SUPPLIER BY CONTRACTOR: CASE STUDY IN INDONESIA Andi Theo Haryanto; Paul Nugraha; I Gede Agus Widyadana
Dimensi Utama Teknik Sipil Vol 6 No 2 (2019): October 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (599.024 KB) | DOI: 10.9744/duts.6.2.1-13

Abstract

This research will discuss about contractors with concrete suppliers and formwork suppliers. The research is conducted to look for ranking criteria and sub-criteria used by contractors to selecting and evaluating concrete and formwork suppliers. The criteria and sub-criteria are refer to Ho et al., (2007) and three new sub-criteria are added, which are a guarantee, lowest price guarantee, and payment term. The contractor classification is divided into four namely general classification, NPK classification consisting of non-classification; individual; small business, medium business classification, and big business classification. Ranking for criteria and sub-criteria are sought based on the mean value for each classification material both in the context of selection and evaluation. After finding the ranking, it is sought whether there is a difference of importance between the NPK classification, middle, and large of the priority sub-criteria in general classification using the Kruskal Wallis test.
ANALISIS PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN SIMULASI MONTE CARLO STUDI KASUS: PEMBANGUNAN RUMAH TINGGAL DI SURABAYA Vanessa Paramitha Teguh; Januar Budiman; Paul Nugraha
Dimensi Utama Teknik Sipil Vol 9 No 2 (2022): Oktober 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.2.156-167

Abstract

Salah satu indikator keberhasilan suatu proyek adalah ketika durasi pelaksanaan proyek tidak lebih dari jadwal rencana yang diperhitungkan sebelumnya. Oleh karena itu, perlu menciptakan jadwal proyek yang akurat dengan memperhitungkan resiko serta ketidakpastian. Salah satu caranya, yaitu dengan menggunakan metode simulasi monte carlo. Pada penelitian ini, digunakan data historis sebagai data pendukung untuk menghasilkan jadwal pekerjaan secara probabilistik dengan menggunakan simulasi monte carlo. Selain itu, pada penelitian ini diteliti juga distribusi probabilistik mana yang lebih tepat digunakan berdasarkan dari data historis yang didapatkan. Kesimpulan yang dicapai adalah penggunaan simulasi monte carlo dapat menghasilkan durasi dalam bentuk probabilistik sehingga dapat memperhitungkan resikoresiko ketidakpastian. Distribusi yang lebih tepat digunakan untuk mengestimasi durasi probabilistik untuk masing-masing aktivitas yaitu dengan menggunakan fitted distribution.
SELECTION AND EVALUATION SUPPLIER BY CONTRACTOR: CASE STUDY IN INDONESIA Andi Theo Haryanto; Paul Nugraha; I Gede Agus Widyadana
Dimensi Utama Teknik Sipil Vol. 6 No. 2 (2019): October 2019
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.6.2.1-13

Abstract

This research will discuss about contractors with concrete suppliers and formwork suppliers. The research is conducted to look for ranking criteria and sub-criteria used by contractors to selecting and evaluating concrete and formwork suppliers. The criteria and sub-criteria are refer to Ho et al., (2007) and three new sub-criteria are added, which are a guarantee, lowest price guarantee, and payment term. The contractor classification is divided into four namely general classification, NPK classification consisting of non-classification; individual; small business, medium business classification, and big business classification. Ranking for criteria and sub-criteria are sought based on the mean value for each classification material both in the context of selection and evaluation. After finding the ranking, it is sought whether there is a difference of importance between the NPK classification, middle, and large of the priority sub-criteria in general classification using the Kruskal Wallis test.
ANALISIS PENJADWALAN PROYEK KONSTRUKSI MENGGUNAKAN SIMULASI MONTE CARLO STUDI KASUS: PEMBANGUNAN RUMAH TINGGAL DI SURABAYA: (Studi Kasus : Pembangunan Rumah Tinggal di Surabaya) Vanessa Paramitha Teguh; Januar Budiman; Paul Nugraha
Dimensi Utama Teknik Sipil Vol. 9 No. 2 (2022): Oktober 2022
Publisher : Program Studi Magister Teknik Sipil - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/duts.9.2.156-167

Abstract

Salah satu indikator keberhasilan suatu proyek adalah ketika durasi pelaksanaan proyek tidak lebih dari jadwal rencana yang diperhitungkan sebelumnya. Oleh karena itu, perlu menciptakan jadwal proyek yang akurat dengan memperhitungkan resiko serta ketidakpastian. Salah satu caranya, yaitu dengan menggunakan metode simulasi monte carlo. Pada penelitian ini, digunakan data historis sebagai data pendukung untuk menghasilkan jadwal pekerjaan secara probabilistik dengan menggunakan simulasi monte carlo. Selain itu, pada penelitian ini diteliti juga distribusi probabilistik mana yang lebih tepat digunakan berdasarkan dari data historis yang didapatkan. Kesimpulan yang dicapai adalah penggunaan simulasi monte carlo dapat menghasilkan durasi dalam bentuk probabilistik sehingga dapat memperhitungkan resikoresiko ketidakpastian. Distribusi yang lebih tepat digunakan untuk mengestimasi durasi probabilistik untuk masing-masing aktivitas yaitu dengan menggunakan fitted distribution.