Mohammed Abdullah K B
Department of Manufacturing and Materials Engineering Faculty of Engineering, International Islamic University Malaysia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Integrated Engineering Project Management Approach for Typical Small to Medium Manufacturing Companies Erry Yulian Triblas Adesta; Mohammed Abdullah K B; Yahya A Alazemi
Indonesian Journal of Electrical Engineering and Computer Science Vol 8, No 2: November 2017
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijeecs.v8.i2.pp541-545

Abstract

The aim of this paper is to identify the problem extents and successfully applying project management in SMEs with a focus on manufacturing industries. The organization of the study was mainly divided into the activity of literature study and the investigation through a survey conduct aimed to measure the awareness and implementation of project management at the selected SMEs in Malaysia. The questionnaire was designed with a section (Section A) involving project management in general and another section (Section B) involving the implementation of it. It was found that the level of awareness and implementation of project management especially in the selected small and medium manufacturing companies in Malaysia was quite satisfying. Most of the manufacturing companies were implementing project management, but the level was depending on the organization in the company itself.