Claim Missing Document
Check
Articles

Found 1 Documents
Search

Production Facility Layout Design Using Activity Relationship Chart (ARC) And From To Chart (FTC) Methods Ata Barbara; Atikha Sidhi Cahyana
Procedia of Engineering and Life Science Vol 1 No 2 (2021): Proceedings of the 2nd Seminar Nasional Sains 2021
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (529.662 KB) | DOI: 10.21070/pels.v1i2.1007

Abstract

XYZ is a company engaged in the field of transformers which produces several types of transformers. Transformer production process is made to order a production process that has a fluctuating pattern. Companies also often cannot estimate the number of transformers that will be produced to meet consumer demand. The purpose of this study is to improve plant layout with an efficient layout. One method used in this study is the Activity Relationship Chart and From To Chart methods. Activity Relationship Chart and From To Chart are methods that can help solve problems which are then explained in more detail through several stages of completion to the optimal point. This research is expected to produce a more efficient layout using the Activity Relationship Chart and From To Chart method.