Claim Missing Document
Check
Articles

Found 2 Documents
Search

IPLEMENTASI MANAJEMEN PENJADWALAN PRODUKSI PADA MESIN SECARA PARALEL DENGAN METODE EARLIEST DUE DATE Migunani; Danang Nur Cahyo
Elkom : Jurnal Elektronika dan Komputer Vol 12 No 2 (2019): Desember: Jurnal Elektronika dan Komputer
Publisher : STEKOM PRESS

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (20.612 KB) | DOI: 10.51903/elkom.v12i2.173

Abstract

The management of production and operations in factory machinery is an optimal management effort in the use of resources consisting of labor, machinery, equipment and raw materials. The production and operations manager directs various inputs in order to produce various outputs or results in units of quantity, quality, price, specific time and location according to consumer demand. Efficiency and effectiveness of the production process to be achieved requires proper scheduling management so that the production output produced can be completed according to target. Management of production and customer orders is still simple, besides that the status of raw material inventories that cannot be directly known can often result in delays in the production process and even production cannot be done as soon as possible. Scheduling orders that enter using the system first in first out where the first order that comes is done, but has not considered the number of orders, priority of customers, maturity of workmanship and engine capacity so that the estimated completion of the order can not be known. To make it more efficient and directed, the Earliest Due Date method is used by sorting the production work based on the closest due date. This method can be used for scheduling on one machine or for scheduling on several machines (parallel machine) so that the scheduling management information system can manage effective production scheduling and produce production reports automatically as needed.
Penguatan Kelompok Peternak Purbalingga Farm Menuju Produksi Berkelanjutan Melalui Penguatan Kelompok, Ketahanan Pakan, dan Produksi Biogas Berbasis Limbah Peternakan Prasetyo; Danang Nur Cahyo; Wilis Cahyani; Mochamad Sugiarto; Muhamad Bata; Elly Tugiyanti; Agustinah Setyaningrum; Indra Sugiharto
JURPIKAT (Jurnal Pengabdian Kepada Masyarakat) Vol. 6 No. 4 (2025)
Publisher : Politeknik Piksi Ganesha Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37339/jurpikat.v6i4.2766

Abstract

Kegiatan pengabdian kepada masyarakat ini bertujuan untuk meningkatkan pengetahuan, keterampilan, dan sikap kelompok peternak domba Purbalingga Farm untuk menciptakan pertanian Berkelanjutan. Sasaran dari kegiatan ini adalah kelompok peternak domba Purbalingga Farm yang berlokasi di Kecamatan Kutasari, Kabupaten Purbalingga. Metode yang digunakan antara lain 1) Focus Group Discussion dan praktek langsung untuk pelatihan, serta 2) pre-test dan post-test untuk mengetahui efektivitas pelatihan penguatan kelompok, produksi silase, serta produksi biogas. Hasil kegiatan menunjukkan bahwa terjadi peningkatan pengetahuan peternak pada ketiga pelatihan. Keterampilan secara keseluruhan meningkat sebesar 60% dan sikap dari kategori sedang menjadi tinggi. Silase diproduksi menggunakan bahan rumput gajah + singkong dan tebon jagung (B). Silase A adalah 95,78% BK; 8,64% PK; 0,70% LK; 24,09% SK; 7,54% Abu; dan 59,02% BETN; serta untuk silase B adalah 94,75% BK; 9,13% PK; 0,52% LK; 39,54% SK; 13,11% Abu; dan 37,71% BETN. Kesimpulan dari kegiatan ini adalah sudah tercapainya peningkatan pengetahuan, keterampilan, dan sikap peternak dalam setiap bidang pelatihan. Peternak juga sudah mampu menciptakan ketahanan pakan dan peternakan ramah lingkungan melalui teknologi silase dan biogas