Claim Missing Document
Check
Articles

Found 2 Documents
Search

IPLEMENTASI MANAJEMEN PENJADWALAN PRODUKSI PADA MESIN SECARA PARALEL DENGAN METODE EARLIEST DUE DATE Migunani; Danang Nur Cahyo
Elkom : Jurnal Elektronika dan Komputer Vol 12 No 2 (2019): Desember: Jurnal Elektronika dan Komputer
Publisher : STEKOM PRESS

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (20.612 KB) | DOI: 10.51903/elkom.v12i2.173

Abstract

The management of production and operations in factory machinery is an optimal management effort in the use of resources consisting of labor, machinery, equipment and raw materials. The production and operations manager directs various inputs in order to produce various outputs or results in units of quantity, quality, price, specific time and location according to consumer demand. Efficiency and effectiveness of the production process to be achieved requires proper scheduling management so that the production output produced can be completed according to target. Management of production and customer orders is still simple, besides that the status of raw material inventories that cannot be directly known can often result in delays in the production process and even production cannot be done as soon as possible. Scheduling orders that enter using the system first in first out where the first order that comes is done, but has not considered the number of orders, priority of customers, maturity of workmanship and engine capacity so that the estimated completion of the order can not be known. To make it more efficient and directed, the Earliest Due Date method is used by sorting the production work based on the closest due date. This method can be used for scheduling on one machine or for scheduling on several machines (parallel machine) so that the scheduling management information system can manage effective production scheduling and produce production reports automatically as needed.
Pengaplikasian Low External Input Sustainable Agriculture (LEISA) dan Diversifikasi Produk untuk Mendukung Keberlanjutan Usaha Peternakan Sapi Perah Dataran Rendah Danang Nur Cahyo; Wilis Cahyani; Naofal Dhia Arkan; Prasetyo; Mochamad Sugiarto; Indra Sugiharto; Muhamad Bata
JURPIKAT Vol 7 No 4 (2026)
Publisher : Politeknik Piksi Ganesha Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37339/jurpikat.v7i4.3649

Abstract

This community service program was conducted at KPSP Manunggal Jaya, Purbalingga, to address low feed efficiency, inadequate waste management, and the lack of product diversification in lowland dairy cattle farming. The program utilized the Asset-Based Community Development (ABCD) approach, implementing Low External Input Sustainable Agriculture (LEISA) alongside product diversification strategies. Three main strategies were implemented: (1) feed-based LEISA featuring forage chopping, concentrate formulation, and teat dipping practices; (2) waste-based LEISA employing portable biogas digesters (Feces to Fire) for renewable energy and eco-friendly slurry management; and (3) product diversification through pasteurized milk, yogurt production, and branding to enhance market value. An evaluation based on Kirkpatrick’s four-level model demonstrated significant improvements in knowledge, skills, attitudes, behaviors, and tangible outcomes, including energy efficiency, product variety, and farmers' income. The implementation of this program proves the effectiveness of LEISA and product diversification in fostering sustainable lowland dairy farming operations.