Lintje Tammu Tangdialla
Fakultas Teknik Sipil Universitas Kristen Indonesia Paulus

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Kinerja Tenaga Kerja Terhadap Waktu Pelaksanaan Proyek Pembangunan Jalan Tol Layang AP.Pettarani, Makassar Juslam Tamba; Josefine E Latupeirissa; Lintje Tammu Tangdialla
Paulus Civil Engineering Journal Vol 2 No 3 (2020): Volume 2, No.3, September 2020
Publisher : Program Studi Teknik Sipil UKI Paulus-Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (338.102 KB) | DOI: 10.52722/pcej.v2i3.147

Abstract

The growth of construction work requires human resources as a determining factor both in terms of quality of work. Of course, the quality of work is highly dependent on the skills of the workforce, so that labor is a major factor in the implementation of a job in order to achieve maximum results. Productivity good workforce is very influential for the success rate of a quality construction project in accordance with the quality planned. The data analysis technique in this research is descriptive qualitative analysis. The data in this study are primary data and secondary data. Observation of workforce performance is carried out on pile cap work which consists of work items for fixing formwork and construction. Determination of the sample using the Slovin formula so that the number of samples taken is 9 pile caps. To find out the workforce performance is to look at their productivity. Observations are made directly by looking at the volume and number of workers every day until the job is completed. Where is said to perform well if the productivity index> 1. From the results of the calculation of data analysis, the work productivity index of the pile cap PAF1 = 1.59; PAF2 = 1.59; PAF3 = 1.59; PAF4 = 1.59; P34 = 1.57; P35 = 1.57; P36 = 1.57; P37 = 1.57; P39 = 1.57 and pile cap work of PAF1 = 1.51; PAF2 = 1.51; PAF3 = 1.51; PAF4 = 1.51; P34 = 1.27; P35 = 1.27; P36 = 1.29; P37 = 1.29; P39 = 1.29. This condition indicates that the productivity index of each pile cap work item is performing well.
Evaluasi Penerapan Manajemen Waktu Pada Proyek Pembangunan Ciputra School of Business Makassar Bona Eirene Mangape; Josefine E Latupeirissa; Lintje Tammu Tangdialla
Paulus Civil Engineering Journal Vol 3 No 4 (2021): Volume 3 No.4 Desember 2021
Publisher : Program Studi Teknik Sipil UKI Paulus-Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1022.05 KB) | DOI: 10.52722/pcej.v3i4.328

Abstract

The construction world there are still many projects whose implementation does not match the specified time. Therefore, it is necessary to evaluate the application of time management in the construction project of the Ciputra School of Business building which experienced delays in several sub-sections of work. The research method used in this research is descriptive analysis method. From the results of the study, it can be seen that in the implementation of the S-curve project it is used as a time schedule in monitoring progress and scheduling work, contractors need to do work in parallel with the fast tracking acceleration method and apply overtime so that weekly and monthly targets are met. From the results of the analysis, it can be concluded that the control uses the S-curve where the baseline is carried out every three months for 1 year during the implementation period.