Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Penataan Parkir Alun-Alun Batu di Jalan Diponegoro Kota Batu Andi Kristafi Arifianto
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 4 (2021): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Batu City is one of the cities in EastJava Province which has a tourist destination that is usually visited by immigrants because of its culture, natural beauty and friendly citizens. Located at the intersection of Jalan Diponegoro and Jalan Gajah Mada, Batu City, there is Batu Square which describes one of the holiday destinations in the city center. With this location, and the increasing number of residents, it also increases the need for transportation facilities to support activities, thus causing an increase in the number of 2-wheeled and four-wheeled transportation equipment that requires parking space. With this background, the researcher aims to understand the situation of the existing parking capacity, parking demand, and parking space circulation. To find out, researchers used information in the form of primary data and secondary data. While the results obtained before the pandemic were the number of parking spaces that were still lacking, this was known during the 7-day survey at 15.00 – 21.00, because at that time there were many parked 2-wheeled and 4-wheeled vehicles, so that parking needs exceeded normal capacity. , while the average parking space for motorbikes is 852 parking spaces and the average car parking space is 272 parking spaces, so with this condition it is considered that the parking facilities are not feasible and need to be rearranged. As for the irregular circulation of vehicles, further arrangement is needed.
Analisis Pengendalian Waktu Terhadap Produktifitas Kinerja Pada Peningkatan Mutu Jalan Kh. Nawawi Kota Mojokerto M.Sa'dillah -; Andi Kristafi Arifianto; Suparman
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 5 (2022): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pengendalian waktu yang baik diharapkan dapat membantu pelaksanaan pada suatu kegiatan proyek sesuai dengan waktu yang direncanakan. Salah satunya dengan menggunakan metode analisis nilai hasil. Analisis nilai hasil digunakan dengan tujuan dapat memperkirakan (forecasting) sejauh mana penyelesaian proyek yang dilaksanakan sesuai dengan waktu yang rencana. Tujuan penelitian ini adalah untuk mengetahui bagaimana penerapan Earned Value Analysis (EVA) dalam memperkirakan waktu akhir penyelesaikan proyek untuk setiap minggunya. Metode yang digunakan dalam penelitian in adalah deskriptif dengan durasi pengerjaan proyek selama 15 minggu. Studi ini menghasilkan waktu penyelesaikan proyek lebih cepat dari waktu yang direncanakan. Prakiraan waktu penyelesaikan proyek berdasarkan minggu ke-13 adalah 91 hari (29 November 2019), apabila kita menggunakan perhitungan setiap minggu, prakiraan waktu penyelesaikan proyek berdasarkan perencanaan minggu ke-15 adalah 105 hari (13 Desember 2019). Berdasarkan perbandingan antara nilai ACWS, VAC beserta durasi pekerjaan hingga selesai, maka proyek peningkatan Jalan Kh. Nawawi ini mengalami percepatan 14 hari dari rencana