This Author published in this journals
All Journal Jurnal Titra
Julius Oscar
Industrial Engineering Department, Petra Christian University

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Perancangan Ulang Lintasan Produksi Cell Assembly Connector 3P di PT. Schneider Electric Manufacturing Batam menggunakan Metode Line Architecture Design Methodology Julius Oscar; Herry Christian Palit
Jurnal Titra Vol 10, No 2 (2022): Jurnal Titra 10(2) Juli 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Schneider Electric Manufacturing Batam will efficiently redesign the cell assembly connector 3P production line for Everlink 3P, Everlink 4P and the new GZ3 product. The redesign was carried out using the Line Architecture Design Methodology. With the Customer Demand for the three products of 346.63 Pcs/Hr, an architectural design was produced with a total of 3 cells, 2 operators per cell and 3 operations per cell and additional benches to overcome production capacity problems. The new design can produce 384 Pcs/Hrs so that it can meet Customer Demand until 2025. In actual application, the company makes architectural designs with 1 cell, 6 operators per cell and 8 operations per cell. The actual design is not suitable in terms of workload and elasticity, but it can still run to meet the number of consumer demands. Meanwhile, in terms of ergonomics, it is still classified as medium level, which means it is still allowed to operate.