PENERAPAN LAST PLANNER SYSTEM PADA PROYEK PENATAAN KAWASAN MASJID DI KOTA SEMARANG Vena Rusdiana; Farrel Rayhan Ardra; Agung Bhakti Utama; Eko Kusumo Friatmojo
Jurnal Ilmiah Desain & Konstruksi Vol 21, No 2 (2022)
Publisher : Universitas Gunadarma

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35760/dk.2022.v21i2.7166

Abstract

Dalam sebuah proyek konstruksi, ketidakefisienan penggunaan sumber daya akan menimbulkan pemborosan (waste). Waste tidak dapat dihilangkan, tetapi dapat diminimalisir dengan menerapkan konsep lean construction atau konstruksi ramping. Dalam konsep lean construction terdapat metode manajemen untuk mengurangi waste dengan menghasilkan perencanaan yang jelas dan sistematis yaitu dengan metode last planner system. Konsep last planner system digunakan untuk merencanakan dan mengendalikan proyek pada salah satu proyek penataan kawasan masjid di Kota Semarang. Artikel ini mendemonstrasikan penerapan last planner system yang terdiri dari penafsiran master schedule, pembuatan phase schedule, lookahead planning, constraint analysis, weekly work plan, perhitungan percent plan complete, dan identifikasi reason non completion selama 6 minggu dari minggu ke 31 sampai 36 menggunakan media Microsoft Project. Nilai progres yang didapat dari last planner system mencapai 92,00% dengan perbedaan sebesar -1,25% terhadap realisasi kurva S. Faktor yang menyebabkan perbedaan yaitu metode perhitungan yang berbeda. Pada kurva S memperhitungkan bobot pekerjaan sedangkan pada last planner system tidak.
Produktivitas Tenaga Kerja Pemasangan Marmer Metode Basah dan Kering Pada Proyek Masjid di Kota Solo Gabriella Ananda Cahyaningtyas Kusumaningrum; Arif Yusup Ramadhan; Agung Bhakti Utama; Febri Fahmi Hakim
Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil Vol 11 No 1 (2023): BENTANG Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil (Januari 2023)
Publisher : Universitas Islam 45

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33558/bentang.v11i1.5667

Abstract

Construction work needs to be controlled for its performance through productivity calculations in order to achieve optimal cost and time. Marble covering work has a considerable weight. However, studies discussing the calculation of labor productivity for marble covering work are still few. This study aims to determine the value of productivity, coefficients, and productivity levels of labor (Labor Utilization Rate) in completing the installation of marble coverings using the wet method for floor coverings and the dry method for wall coverings with parallel patterns and diagonal patterns. The study used a work sampling method with a productivity rating approach. Primary data were collected by sampling the volume of marble covers of 482.400 m² and observations on labor groups consisting of craftsmen and helpers in predetermined zones. Furthermore, analysis was carried out using quantitative techniques of parametric inferential statistical type where the data was confirmed to be normally distributed using SPSS software. The results showed that the labor productivity of marble floor coverings was 9.896 m² / day with a coefficient of craftsman and helper of 0.101 each and a Labor Utilization Rate of 58%. Second, the labor productivity of parallel pattern marble wall coverings is 12.589 m²/day with a coefficient of craftsman and helper of 0.159 each and a Labor Utilization Rate of 57%. The labor productivity of diagonal pattern marble wall coverings was 1,549 m²/day with the efficiency of craftsman and helper of 0.646 and the Labor Utilization Rate of 55%, respectively. The results showed that the labor of marble cover work is quite productive because it has a productivity level above 50%.