Search

BANTUAN TEKNIK DAN PERENCAAAN PEMBIAYAAN REVITALISIASI PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO KAMPUNG BUNIKASIH DESA BUKANAGARA KECAMATAN CISALAK Novandri Tri Setioputro; Muhtar Kosim; Kasda Kasda; Sugeng Sutikno; Ari Ajibekti Masriwilaga
BERNAS: Jurnal Pengabdian Kepada Masyarakat Vol. 4 No. 1 (2023)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1063.136 KB) | DOI: 10.31949/jb.v4i1.4097

Abstract

Bunikasih Rural community and the Faculty of Engineering at the University of Subang took the initiative to build the Bunikasih Micro Hydro Power Plant (MHP) in 2013, with financial support from CRS BNI Go Green. The Bunikasih MHP is situated in the Bunikasih area of Cupunagara Village, Cisalak District, Subang Regency, West Java Province, Indonesia. The Bunikasih MHP was initially utilized to supply electricity for the Bunikasih Rural community, which at the time was off grid. In 2018, an earthquake occurred therefore it made MHP Bunikasih malfunctioning. The Engineering Faculty team and the Bunikasih community undertook Focus Group Discussion/FGD activities prior to the MHP Bunikasih damage survey. The results of the FGD activities are the revitalization of the Bunikasih MHP so that it can operate again. It was also proposed that MHP Bunikasih is to be utilized to support the increase in the processing of agricultural production. The survey revealed that Bunikasih MHP suffered heavy damage. The channel was cracked and broken. The penstocks was bent. The roof of the turbine house was collapsed. The generator and electrical controls were fried. Damage to civil buildings can be repaired by making a new building structure in the damaged part. The bent pen stock is repaired by cutting the bent part and replacing it with a new pipe. A new roof is installed to the turbine house. The generator and control system are fixed and new components are installed. In general, all components of the Bunikasih MHP that were damaged can be repaired and revitalized. The cost for the revitalization is Rp. 213,700,000.00.
BANTUAN TEKNIK DAN PERENCAAAN PEMBIAYAAN REVITALISIASI PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO KAMPUNG BUNIKASIH DESA BUKANAGARA KECAMATAN CISALAK Novandri Tri Setioputro; Muhtar Kosim; Kasda Kasda; Sugeng Sutikno; Ari Ajibekti Masriwilaga
BERNAS: Jurnal Pengabdian Kepada Masyarakat Vol. 4 No. 1 (2023)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/jb.v4i1.4097

Abstract

Bunikasih Rural community and the Faculty of Engineering at the University of Subang took the initiative to build the Bunikasih Micro Hydro Power Plant (MHP) in 2013, with financial support from CRS BNI Go Green. The Bunikasih MHP is situated in the Bunikasih area of Cupunagara Village, Cisalak District, Subang Regency, West Java Province, Indonesia. The Bunikasih MHP was initially utilized to supply electricity for the Bunikasih Rural community, which at the time was off grid. In 2018, an earthquake occurred therefore it made MHP Bunikasih malfunctioning. The Engineering Faculty team and the Bunikasih community undertook Focus Group Discussion/FGD activities prior to the MHP Bunikasih damage survey. The results of the FGD activities are the revitalization of the Bunikasih MHP so that it can operate again. It was also proposed that MHP Bunikasih is to be utilized to support the increase in the processing of agricultural production. The survey revealed that Bunikasih MHP suffered heavy damage. The channel was cracked and broken. The penstocks was bent. The roof of the turbine house was collapsed. The generator and electrical controls were fried. Damage to civil buildings can be repaired by making a new building structure in the damaged part. The bent pen stock is repaired by cutting the bent part and replacing it with a new pipe. A new roof is installed to the turbine house. The generator and control system are fixed and new components are installed. In general, all components of the Bunikasih MHP that were damaged can be repaired and revitalized. The cost for the revitalization is Rp. 213,700,000.00.
Analisis Percepatan Proyek Dengan Metode Pertukaran Waktu Dan Biaya Sugeng Sutikno; Endang Setiadi; Sahur AR
Jurnal Publikasi Teknik Informatika Vol. 3 No. 3 (2024): Jurnal Publikasi Teknik Informatika
Publisher : Lembaga Pengembangan Kinerja Dosen

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jupti.v2i2.1931

Abstract

Problems in construction projects can occur in various ways, the cause is due to increased implementation time and increased implementation costs. This is caused by several factors, namely the influence of weather, lack of manpower, inadequate or disrupted material supply and insufficient equipment used, as well as the owner himself. Work delays can be anticipated by accelerating the implementation and accelerating project completion with good planning. An alternative commonly used to support the acceleration of activities is to increase working hours and labor, so that it affects the total cost of the project. To speed up the duration of the project, you can use the time and cost exchange method by analyzing the relationship between activities and the duration of each activity, then calculating the crashing program for each alternative, namely adding working hours by 4 working hours, adding 25% of the workforce to get the value cost slope, and compressed project duration starting from the lowest cost slope value for activities that are on the critical path. The result is that the addition of labor is more profitable in terms of costs because there is an increase in total costs in a relatively small amount compared to the addition of working hours, while in terms of time the addition of working hours is more time efficient.