Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : SIGMA TEKNIKA

INTEGRASI KEAMANAN DAN EFISIENSI: RANCANGAN SISTEM INFORMASI MANAJEMEN PADA RUMAH SAKIT Merjani, Abdullah; Hendri, Hendri
SIGMA TEKNIKA VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v7i1.6203

Abstract

Penelitian ini mengkaji implementasi keamanan sistem informasi di RSUD Palembang BARI dengan tujuan meningkatkan keamanan sistem informasi. Audit keamanan dilakukan menggunakan kerangka kerja COBIT 2019, khususnya fokus pada domain dan proses seperti EDM03, APO12, APO13, APO14, dan DSS05. Penelitian melibatkan identifikasi dan evaluasi risiko keamanan informasi, penentuan kontrol keamanan yang diperlukan, dan memastikan kepatuhan terhadap standar keamanan informasi yang ditetapkan oleh COBIT 2019. Hasil penelitian menunjukkan bahwa keamanan sistem informasi di RSUD Palembang BARI berada pada level 3 (Defined), dengan perbedaan analisis gap satu level di bawah target yang diharapkan. Rekomendasi melibatkan implementasi teknik keamanan seperti pemindaian kerentanan, uji penetrasi, dan peningkatan aspek keamanan fisik. Pertimbangan untuk mendapatkan sertifikasi keamanan seperti ISO 27001 juga disarankan. Kualitas sumber daya manusia dan pelatihan untuk mengatasi ancaman menjadi fokus penting.
AREA OPTIMALIZATION WITH SYSTEMATIC LAYOUT PLANNING AND CLASS BASED STORAGE METHODS TO INCREASE STORAGE CAPACITY Merjani, Abdullah; Mulyadi, Dede
SIGMA TEKNIKA Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v6i2.5504

Abstract

PT Simatelex Manufactory Batam (SMB) is engaged in Coffee Maker and Pizza Maker. In the manufacture of these products, they are divided into several buildings in the Batamindo Industrial Park area, the products produced are made based on orders from customers. The products produced by the company are mostly marketed abroad (exports). In the production of Coffee Maker which is located on Jl. Beringin Muka Kuning, Lot 003, Batamindo Industrial Park Area, Batam. Finished products are then stored in the warehouse area on the ground floor of the building (Ground) which has an area capacity of 60%, so that all finished goods cannot be stored, in addition to using an area of 60%, another cause of finished goods not being able to be stored is all mismatched placement. finished goods include Finished Goods Fresh from the production line and Finished Goods to Shipping, so that there are no finished goods to shipping sequences that are not in accordance with CO (Create Order) and there is a buildup of products in the finished goods area. Therefore, the authors are interested in conducting research by anticipating these conditions so that it is necessary to optimize the storage of the finished goods. Improvements made in the form of changes to the flow of finished goods moving, re-layout the optimal warehouse stock level using the Systematic Layout Planning method, and making verbal control monitoring in the warehouse using the Class Based Storage method. From these improvements, the results obtained are an increase in area use by 60% to 80%, and also ensure that the area capacity can meet the company's needs.
THE ANALIZE OF WASTE ELIMINATION ON SA CONTACT BLOCK TO INCREASED THE OUTPUT BY LEAN MANUFACTURING METHOD (STUDI CASE: PT SCHNEIDER ELECTRIC) Merjani, Abdullah; Afriantika, Nadila
SIGMA TEKNIKA Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v7i2.6940

Abstract

PT. Schneider Electric Manufacturing is a global company leading digital transformation in the fields of energy management and automation. PT. Schneider its prioritizes continuous improvement to control the production process. These include modular and Monoblock sub-assemblies. In controlling effectiveness in a production system it should be a good level on utility (utilization), but after analysed it found low utilization on line production Monoblock many problems with waste from production operators, material transfer and waiting times due to unbalanced processes resulting in less output. (not reaching the target) this has a huge impact on efficiency and productivity. To increase output and utility, use 3 lean manufacturing methods, including Kaizen, Line balancing and Kanban super market to improve overcome problems in the production area. After implementation, utility and output become better.