Techno – Economic Analysis of Rooftop Solar Panel Uprating on Commercial Building (Casestudy on Karawang Branch Office of XYZ Company) Aji Nur Widyanto; Muhamad Arya Krisna Adhi; Faiz Husnayain; Agus R Utomo; I Made Ardita
Buletin Ilmiah Sarjana Teknik Elektro Vol. 5 No. 1 (2023): March
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/biste.v5i1.7579

Abstract

On April 22nd, 2016, Indonesia signed the Paris Agreement, which goal is that the world will enter the net-zero emission phase in 2060. To support that, it is better to increase the solar rooftop capacity have been installed. In this study, there are some variations, such as the capacity of solar rooftops based on load profile and installed power (75%, 90%, and 100%), variation of solar module placement, and variation of solar module types. The result shows that to fulfill the load needs, it will need 40 kW of inverter capacity and 49.5 kWp of PV capacity with a total module of 113 pcs. Based on the solar module type simulations result, the 440 Wp B – brand has the highest performance result among the others. Uprating solar rooftop capacity will cost around Rp.1,138,529,870 for the investment, and the payback period is around 18 years. This study finds that uprating the capacity of rooftop solar panel can reduce electricity tariffs and increase energy production. Moreover, the results of the economic analysis revealed that the initial cost, interest rate, and electricity price will play crucial roles in determining whether to launch a project or not.
Lockdown Impact due to Corona Pandemic on Electric Power Quality and Its Alternative Solutions for a University Office Building Ida Ayu Vadanti Locana Diwy; Amien Rahardjo; Aji Nur Widyanto; Faiz Husnayain; Rudy Setiabudy
ELKHA : Jurnal Teknik Elektro Vol. 14 No. 2 October 2022
Publisher : Faculty of Engineering, Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/elkha.v14i2.56226

Abstract

The pandemic has changed the usage pattern of electrical appliances in buildings. This new pattern can create new problems in terms of power quality and thus affect the electrical system’s reliability. The purpose of this study is to determine the power quality of the Dean Office Building, Faculty of Engineering, Universitas Indonesia, and propose alternative solutions to its problems. To determine the quality of electric power, the related parameters such as voltage, current, power factor, and harmonics are measured first. The measurement results are compared with existing standards. If these standards cannot be met, damage to electrical equipment can occur. Out of eight parameters, three did not meet the criteria. First, overvoltage on average voltage with the range of 231.5-232.8 V. Second, IHDi nominal on the 3rd, 5th, 7th, and 15th harmonics for Thursday, April 7, 2022 on 06:11 with the value of 70.3%, 55.34%, 27.1%, and 8.07%. And third, the minimum power factor for the T phase with the value of 0.7219 is still less than 0.85. Possible solutions include checking and changing the supply transformer tap-changer, making an energy monitoring system and wiring diagram for understanding the load profile of the building, and using a single-tuned filter for harmonic currents.
Designing Air-Cored Axial Flux Permanent Magnet Generator with Double Rotor Aji Nur Widyanto; Rahmat Ariwidayat; Faiz Husnayaian; Amien Rahardjo; Agus R Utomo; I Made Ardita
ELKHA : Jurnal Teknik Elektro Vol. 14 No. 1 April 2022
Publisher : Faculty of Engineering, Universitas Tanjungpura

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26418/elkha.v14i1.53048

Abstract

The development of renewable energy is carried out to reduce the use of fossil energy, which is decreasing in existence, increasing in price, and having a very long recovery cycle. One of the uses of technology to support renewable energy development is a synchronous machine that can be used to utilize wind and water energy. One type of synchronous machine that is widely used today is the radial flux machine. However, there is a saturation point in their development. Axial flux machines also called disc type machines, are an alternative to radial flux machines due to their compact shape and high-power density. Axial flux machines can be operated as small to medium-scale power plants. Besides that, they are ideal for low-speed applications. An axial flux permanent magnet (AFPM) generator is designed and built in this study. This generator design consists of a dual rotor with twelve permanent magnets and a single stator with nine coils. The primary material used for the stator and rotor is acrylic, while the permanent magnet uses neodymium N52. It is necessary to know the stator and rotor parameters such as distribution factor (kd), pitch factor (kp), and winding factor (kw) for designing the AFMP generator. The AFPM generator is designed to produce a phase voltage of 4.03 V at a nominal speed of 500 r/min. Based on the measurement results, it was found that the phase voltages at a rotating speed of 500 r/min for each phase are VR = 2.94 V, VS = 2.97 V, and VT = 2.95 V. There are differences in the test results and the design. It can be caused by design simplicity that does not consider magnetic saturation and internal reactance, which cannot be ignored but is not included in the calculation.
Evaluasi Sistem Pencahayaan Di Bangunan Sekolah Studi Kasus SMA XYZ Sholihah, Najwati; Aji Nur Widyanto; Faiz Husnayain; Ismi Rosyiana
Electrices Vol 6 No 2 (2024): Volume 6 Nomor 2 Tahun 2024
Publisher : Jurusan Teknik Elektro, Politeknik Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32722/ees.v6i2.7040

Abstract

Pencahayaan di sekolah berpengaruh terhadap kinerja akademik siswa, di mana pencahayaan yang buruk dapat mengganggu konsentrasi dan menyebabkan masalah penglihatan. Penelitian ini bertujuan mengevaluasi sistem pencahayaan di SMA XYZ sesuai dengan standar SNI 03-6575-2001 terkait tingkat pencahayaan (lux) dan SNI 6197-2011 terkait daya maksimum sistem pencahayaan. Dua tahap yang dilakukan adalah audit pengukuran dan simulasi perbaikan menggunakan perangkat lunak DIALux Evo. Hasil pengukuran menunjukkan bahwa tingkat pencahayaan gabungan antara pencahayaan alami dan buatan melebihi standar, dengan rata-rata 607% pada pengukuran grid dan 203% pada pengukuran bidang kerja. Sedangkan apabila cahaya buatan saja, nilainya jauh di bawah standar. Untuk mengatasi kurangnya pencahayaan, maka diusulkan tiga skenario. Skenario Kedua, yaitu mengganti lampu tanpa mengubah titik lampu, terbukti paling optimal, memberikan efisiensi energi serta kualitas pencahayaan yang lebih baik dengan biaya operasional yang tidak terlalu tinggi. Hasil penelitian ini diharapkan dapat menjadi rekomendasi bagi sekolah lain dalam meningkatkan sistem pencahayaan untuk mendukung efektivitas belajar dan efisiensi energi.
Lightning Performance Design Review of 150kV Overhead Transmission Line Hakim, Fakhri; Fitri, Ismi Rosyiana; Widyanto, Aji Nur
International Journal of Electrical, Computer, and Biomedical Engineering Vol. 3 No. 2 (2025)
Publisher : Universitas Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62146/ijecbe.v3i2.122

Abstract

Lightning overvoltage constitutes the predominant cause of transmission line interruptions in Indonesia, significantly compromising system safety and reliability. This paper presents comprehensive simulations of lightning performance on 150kV overhead transmission lines using ATP-EMTP software, with particular focus on evaluating shielding failure and back flashover occurrences on one of the standard tower designs used by PT PLN (Persero). The transmission line model incorporates shielding wires, phase conductors, tower surge impedance, current-dependent footing resistance behavior, and arcing horns. Simulations were conducted to investigate three key aspects: maximum shielding failure current based on various Electrogeometric Model (EGM) constants, the impact of footing resistance on critical flashover current, and the effect of arcing horn length variations on critical flashover current. The analysis also accounts for phase angle variations in system voltage. Results highlight the significant influence of these variables on the Lightning Flashover Rate (LFR) of existing tower designs. Increasing footing resistance from 10Ω to 20Ω elevates Back Flashover Rate (BFOR) by 16.39%, while further increases to 30Ω and 40Ω yield only marginal increases of 17.33% and 17.76%, respectively. Notably, arcing horn gap length modifications demonstrate substantial performance improvements, with 1.4m and 1.5m gaps reducing LFR by 17.37% and 30.87%, respectively, compared to the 1.3m reference configuration. Analysis of maximum shielding-failure currents across varying EGM coefficient sets indicates that shield wires fail to intercept currents in the range of 2.53 kA to 52.81 kA.
Studi Tekno-Ekonomi Sistem Fotovoltaik On-Grid Pada Bangunan Industri Kontrol Satelit Widyanto, Aji Nur; Gaviarsha, Muhammad; Husnayain , Faiz; Utomo , Agus R; Ardita , I Made
Electrices Vol 5 No 1 (2023): Volume 5 Nomor 1 Tahun 2023
Publisher : Jurusan Teknik Elektro, Politeknik Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32722/ees.v5i1.5778

Abstract

Penggunaan energi fosil di Indonesia masih tinggi. Pemerintah Indonesia berkomitmen dengan menargetkan penggunaan energi terbarukan sebesar 23% pada tahun 2025. Komitmen ini diikuti oleh PLN (Perusahaan Listrik Negara) dengan menargetkan pembangunan pembangkit energi terbarukan sebesar 10,6 GW guna mencapai target pemerintah tersebut. Salah satu potensi energi terbarukan yang cukup menjanjikan di Indonesia adalah pembangkit listrik tenaga surya. Penelitian ini difokuskan pada perancangan sistem fotovoltaik (PV) on-grid di salah satu industri satelit di Indonesia. Beban listrik harian pada PT. RST adalah 1850 kWh. Berdasarkan beban listrik tersebut, maka kapasitas optimum untuk mendesain sistem PV on-grid yang dibutuhkan sebesar 230,8 kW, dengan total luas area yang digunakan adalah 1329,21 meter persegi. Untuk mendapatkan hasil yang optimal, sudut kemiringan PV harus sebesar 9 derajat dan menghadap ke utara. Setelah menjalankan simulasi, dapat diketahui bahwa rata-rata total daya yang dihasilkan per hari adalah 987,38 kWh dengan LCOE sebesar Rp.868,29. LCOE sistem PV ini lebih murah dari standar BPP nasional sehingga sistem ini layak untuk dibangun. Aspek ekonomi lainnya dari hasil simulasi menunjukkan bahwa tingkat ROI adalah 7,1% dan tingkat IRR sebesar 10,3% - serta payback period akan membutuhkan waktu sekitar sepuluh tahun.
Reliability Assessment of Interconnected Substations Using the Reliability Block Diagram Approach Hermoyo, Ganis; Fitri, Ismi Rosyiana; Widyanto, Aji Nur
International Journal of Electrical, Computer, and Biomedical Engineering Vol. 3 No. 3 (2025)
Publisher : Universitas Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62146/ijecbe.v3i3.123

Abstract

The reliability of substations plays a crucial role in maintaining the continuity and stability of power supply in transmission systems. This study evaluates the reliability level of two interconnected 150 kV substations using the Reliability Block Diagram (RBD) approach. The RBD model is applied to map the actual component configuration, from major component levels to the system level, based on operational age and component failure rate data. Simulation results show that System1 has a reliability value of 0.907735, while System2 reaches 0.979424. This discrepancy indicates a potential for reliability improvement through component rejuvenation strategies. A scenario simulating the replacement of critical equipment successfully increased the reliability of system1 to 0.980168 and raised the overall reliability of the interconnected system to 0.959989. These findings suggest that a prioritized maintenance or renewal of component strategy targeting critical component can significantly enhance the overall reliability of the transmission system.
Analysis of Single Phase to Ground Faults Caused by Animals on Energy Not Served (ENS) in the Sumatera System Januarsyah, Ginanjar; Widyanto, Aji Nur; Husnayain, Faiz
International Journal of Electrical, Computer, and Biomedical Engineering Vol. 3 No. 3 (2025)
Publisher : Universitas Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62146/ijecbe.v3i3.124

Abstract

Animal disturbances on the High Voltage / Extra High Transmission Air Lines (SUTT / SUTET) in the work area of PT PLN (Persero) Sumatra Load Regulation and Distribution Center Main Unit (UIP3B Sumatra) during the period 2020-2024 have caused 208 animal disturbances on transmission lines and 35 animal disturbances on power transformers. This study provides information on mitigating animal interference, analyzing trends or patterns of animal habits that cause interference, and providing information on Energy Not Served (ENS). The data covers the period from 2020 to 2024, with a focus on evaluating the types of animals causing interference, the frequency and duration of outages, load data at the time of interference and the effectiveness of mitigation implemented, including recording the date, location, animal species, event classification, causal factors and response actions taken. This approach aims to improve understanding of the impact and behavior of wildlife on energy supply and to improve reliability and reduce the number of ENS.  The results showed that the behavior of each animal was consistent with the fault data analysis, and the largest amount of undelivered power was monkeys 629.15  MWh, followed by birds 391.167 MWh and 358.04 MWh. Reducing the number of disturbances is done by preventive maintenance in animal-prone areas, with regular monitoring and evaluation so that ENS can be minimized
Evaluasi Sistem Proteksi Petir Eksternal pada Bangunan Pusat Perbelanjaan Studi Kasus Gedung XYZ Mahira, Athaya; Widyanto, Aji Nur; Husnayain, Faiz; Fitri, Ismi Rosyiana
CYCLOTRON Vol 7 No 02 (2024): CYCLOTRON
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30651/cl.v7i02.23283

Abstract

Sustainable Development Goals (SDGs) adalah 17 tujuan global yang disusun oleh Perserikatan Bangsa-Bangsa untuk mengatasi berbagai tantangan global seperti kemiskinan, degradasi lingkungan, perdamaian, dan perubahan iklim. Salah satu tujuannya adalah poin 11, "sustainable cities and communities," yang bertujuan membuat kota dan pemukiman manusia inklusif, aman, tangguh, dan berkelanjutan. Indonesia, dengan iklim tropisnya, rentan terhadap hujan petir yang bisa menyebabkan kerusakan elektronik, cedera, kematian, dan kebakaran. Dengan Indeks Kerawanan Petir (IKL) 45%, Jakarta adalah salah satu kota dengan risiko tinggi terhadap petir, sehingga penting untuk mengevaluasi sistem proteksi petir pada bangunan perkotaan. Salah satu bangunan yang banyak di Jakarta merupakan bangunan pusat perbelanjaan. Penelitian ini menganalisis risiko pada salah satu bangunan pusat perbelanjaan di Jakarta, Gedung XYZ, yang dilakukan berdasarkan standar nasional dan internasional. Sistem proteksi petir eksternal yang terpasang adalah Early Streamer Emission (ESE). Evaluasi dilakukan berdasarkan standar NF C 17-102 dengan fokus pada terminal udara, konduktor penyalur, dan sistem pentanahan. Empat skenario perbaikan area proteksi terminal udara ditawarkan: penggeseran, penambahan, penggantian batang penangkal, dan aplikasi sistem konvensional. Perbaikan sistem grounding melibatkan pemasangan ground ring electrode atau penambahan elektroda pentanahan di setiap sistem terminasi tanah.