ANALISIS PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE NILAI HASIL (EARNED VALUE METHOD) PADA PROYEK PERUMAHAN GRAHA CITRA KEMBANGAN DI PT SONTO PROPERTI GRESIK Akhmad Andi Saputra; Bowo Leksono; Mu'arofah
Wahana Teknik Vol 10 No 2 (2021): Wahana Teknik
Publisher : Wahana Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Planning and controlling time and costs are part of the overall construction project management. The existence of significant cost and time deviations indicates poor project management. Cost management and time management activities can be carried out using a method known as the Earned Value Method. The Earned Value Method is used to estimate the end time project completion and project performance. The results of the analysis using the Earned Value Method on the Graha Citra Kembangan housing development project are the project completion time ini accordance with the project qwal plan and the costs incurred are less than the budgeted cost (BAC). The difference between the contract costs (BAC) and the actual costs incurred (ACWP) reached Rp. 36.170.100. There are delays in the completion of work in several weeks of the project cycle. However, at the end of the project completion (week 40), the work was carried out in time according to schedule (estimate project plan time).
KECAMATAN DUDUKSAMPEYAN KABUPATEN GRESIK Dandy Nugroho; Akhmad Andi Saputra; muhammad Fiqih Febrianto
Wahana Teknik Vol 11 No 1 (2022): Wahana Teknik
Publisher : Wahana Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The need for clean water in Tambak Rejo Village is very large. The population in 2022 is ± 2,100 people. This village does not yet have a clean water distribution network, the community generally uses seasonal water sources such as reservoirs and lakes which in the dry season will dry up. Therefore, researchers feel the need to plan a clean water network with the aim of meeting water needs in the village. This study includes population projections in 2027, water needs, design of pipe installation patterns, and calculation of the budget plan needed in planning the piping network in Tambak Rejo Village. The conclusions of this study are: 1. The results of the projected analysis of the population of Tambak Rejo Village in 2027 are as many as 2,278 people and for the water needs of the residents of Tambak Rejo Village in 2027 it is 374,773 liters/day or equal to 4.34 liters/second. 2. The pipe used is HDPE pipe because it is very suitable with the characteristics of the region, and is very strong. The diameter that can be used from the analysis results are two types of sizes, namely pipes with a size of 63 mm and 90 mm. 3. Planning for the installation of a water pipe network in Tambak Rejo village requires a fee of IDR. 554,380,000.00- (five hundred fifty-four million three hundred and eighty-nine thousand rupiah).