Irvan Yulian Pratama
a:1:{s:5:"en_US";s:20:"Universitas Trisakti";}

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

IMPLEMENTATION OF PSC COST RECOVERY AND PSC GROSS SPLIT CONTRACTS IN THE IYP FIELD Irvan Yulian Pratama; Bayu Satiyawira; Prayang Sunny Yulia
PETRO: Jurnal Ilmiah Teknik Perminyakan Vol. 12 No. 2 (2023): JUNI
Publisher : Jurusan Teknik Perminyakan Fakultas Teknologi Kebumian dan Energi Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/petro.v12i2.16096

Abstract

In producing oil and gas, Indonesia has two valid contract schemes, namely PSC Cost Recovery and PSC Gross Split. The IYP field is a field that has great potential in producing petroleum, with 25 workover and 2 infill wells. The scheme released to compare with the PSC Cost Recovery scheme is the Gross Split PSC scheme. The previous scheme was considered to be ineffective and still detrimental to the government. So the government issued Ministerial Regulation No. 52 of 2017 which is the result of a revision of Permen no. 8 of 2017. Gross Split PSC Scheme, the contractor bears all operational costs for the development of oil and gas fields. The economic research on the IYP field aims to compare the Cost Recovery PSC scheme with the Gross Split PSC.