TINJAUAN PRODUKTIVITAS PEKERJA PADA DUA PROYEK SERTA FAKTOR YANG MEMPENGARUHINYA Fuk Jin Oei; Sudarno P Tampubolon; Chatarina Finella
Jurnal Rekayasa Teknik Sipil dan Lingkungan - CENTECH Vol. 4 No. 1 (2023): Jurnal Rekayasa Teknik Sipil dan Lingkungan, APRIL ISSN 2722-0230 (Online)
Publisher : UKI Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33541/cen.v4i1.4837

Abstract

Labor productivity is one of the critical success factors in a development project of construction services. This research to analyze the worker’s productivity on two projects undertaken by two contractors with different background. Labor Utilization Rate Value (LUR Value) is used in this study to determine the level of productivity of each worker. Meanwhile, to determine the factors which affect the labor’s productivity, factor analysis is used in this study supported the spread of questionnaire to the supervisors. It can be seen that the average level of worker productivity on rebar work in project A which has been undertaken by one of the foreign contractor was 71,4881% and LUR value for formwork workwas 74,3086%, while the project B which has been done by one of the BUMN contactors, LUR value on rebar work was 66,1528 % and on the formwork work was 72,5055 %. Of the same type of work, LUR value comparison shows that productivity of workers on the project A is higher. Meanwhile, factor analysis on the questionnaire shows that some factors which affect on project A are work method, work instructions, tools quality, group labor composition, working drawings, remunerations, area density of labor, labor skills, experience and teamwork. While, factors that affect labor productivity on the project B are expertise of labor, area density of labor, experience, group labor composition, work method, management and leadership skill, team work and tools quality. Keywords: productivity, labor utilization rate, productivity factor, labor, factor analysis
PEMODELAN ESTIMASI BIAYA KONSEPTUAL PROYEK GEDUNG SEKOLAH DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK Fuk Jin Oei; Kevin Pratama Surya
Jurnal Rekayasa Teknik Sipil dan Lingkungan - CENTECH Vol. 5 No. 2 (2024): Jurnal Rekayasa Teknik Sipil dan Lingkungan, Oktober 2024, ISSN 2722-0230 (Onli
Publisher : UKI Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33541/cen.v5i2.6261

Abstract

According to Central Bureau of Statistics (Badan Pusat Statistik), in 2015 the population of Special Capital Region of Jakarta was 10,177,900 people with the rate of growth 1.02% per annum. Approximately, 14.7% of the population are students. In order to fulfil the demand of good quality education, the X school foundation develops and builds new schools continuously, especially in Jakarta and its suburbs. The planning of school development should be done well. One of the initial steps is to conduct a feasibility study. Conceptual cost estimation is important at this stage. There are some difficulties in estimating the cost at the conceptual stage, such as the lack of preliminary information about the project, lack of project cost data, incomplete data, et cetera. The purpose of this study is to create model using Artificial Neural Network. To determine the input variables, analysis factors were used. After that, the model was created by using Matlab software. This research was conducted by collecting 15 data of school building projects. The result of this study shows the best Artificial Neural Network model is network architecture 7-5-1 with backpropagation algorithm.