Amanatullah Savitri
Program Studi Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Internasional Batam

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Feasibility Study of Housing Project Investment in Batam Center Sheera Shaviera; Mulia Pamadi; Amanatullah Savitri
Journal of Civil Engineering and Planning (JCEP) Vol 4 No 1 (2023)
Publisher : Program Studi Sarjana Teknik Sipil Universitas Internasional Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37253/jcep.v4i1.7844

Abstract

With population growth, the need for housing as a living space continues to grow in both urban and rural areas. An individual's housing needs vary according to personal and financial circumstances. Before starting construction, a feasibility study should be conducted. The purpose of the analysis is to positively and negatively assess the feasibility of the project in all aspects such as customer satisfaction, expectations and requirement assessment. The analysis is carried out after collecting data, such as plan drawings, budget, and cash flow plans. The feasibility analysis in this report is seen from the technical and financial aspects. In the aspect of technical feasibility seen from the value of KDB and KLB. In terms of financial feasibility seen from the NPV, IRR, PI, and PP value. The KDB value is 42.43% < 60% and the KLB value is 60% £ 60%, with a positive NPV of IDR 31,221,998,389.25, an IRR of 22.41% where the NPV value is zero, PP 2 years < 5 years investment period, and PI 1.22 > 1, it can be said that this project is feasible in technical and financial aspects.
Feasibility Study of Housing Project Investment in Batam Center Sheera Shaviera; Mulia Pamadi; Amanatullah Savitri
Journal of Civil Engineering and Planning (JCEP) Vol. 4 No. 1 (2023)
Publisher : Program Studi Sarjana Teknik Sipil Universitas Internasional Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37253/jcep.v4i1.7844

Abstract

With population growth, the need for housing as a living space continues to grow in both urban and rural areas. An individual's housing needs vary according to personal and financial circumstances. Before starting construction, a feasibility study should be conducted. The purpose of the analysis is to positively and negatively assess the feasibility of the project in all aspects such as customer satisfaction, expectations and requirement assessment. The analysis is carried out after collecting data, such as plan drawings, budget, and cash flow plans. The feasibility analysis in this report is seen from the technical and financial aspects. In the aspect of technical feasibility seen from the value of KDB and KLB. In terms of financial feasibility seen from the NPV, IRR, PI, and PP value. The KDB value is 42.43% < 60% and the KLB value is 60% £ 60%, with a positive NPV of IDR 31,221,998,389.25, an IRR of 22.41% where the NPV value is zero, PP 2 years < 5 years investment period, and PI 1.22 > 1, it can be said that this project is feasible in technical and financial aspects.
Analisis Kapasitas Saluran Drainase pada Wilayah Rawan Banjir dengan Menggunakan Pemodelan Perangkat Lunak SWMM M. Alfi Wahyudi; Ade Jaya Saputra; Amanatullah Savitri
MEDIA KONSTRUKSI Vol. 10 No. 1 (2025)
Publisher : Jurusan Teknik Sipil, Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v10i1.96

Abstract

Penelitian ini bertujuan untuk menganalisis kapasitas saluran drainase di wilayah rawan banjir dengan menggunakan perangkat lunak Storm Water Management Model (SWMM). Banjir merupakan salah satu bencana yang sering terjadi akibat ketidakmampuan saluran drainase dalam menampung debit air hujan yang tinggi. Dalam penelitian ini, dilakukan simulasi pada dua jenis saluran drainase, yaitu saluran persegi terbuka dan saluran persegi tertutup, untuk mengevaluasi apakah saluran eksisting mampu mengalirkan air dengan baik. Hasil simulasi menunjukkan bahwa kedua jenis saluran tersebut tidak dapat menampung curah hujan dengan periode ulang 2 tahun, yang dapat menyebabkan genangan dan banjir. Faktor utama yang memengaruhi kapasitas saluran adalah perubahan dimensi akibat pembangunan infrastruktur dan kurangnya pemeliharaan saluran. Penelitian ini merekomendasikan beberapa langkah mitigasi, seperti perbaikan dimensi saluran, normalisasi saluran secara rutin. Selain itu, partisipasi masyarakat dalam menjaga kebersihan saluran drainase sangat penting untuk mengurangi risiko banjir. Dengan langkah-langkah tersebut, diharapkan wilayah rawan banjir dapat dikelola dengan lebih baik, sehingga risiko bencana banjir dapat diminimalkan dan masyarakat dapat hidup dengan lebih aman dan nyaman.