ANALISIS KINERJA BENDUNG PANONGAN KABUPATEN CIREBON Dimas Arif Prasetyo Muslim; Hendra Kurniawan
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 7 No 3 (2018): JURNAL KONSTRUKSI (APRIL 2018)
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v7i3.3897

Abstract

ABSTRAKAnalisis ini bertujuan untuk dijadikan sebagai acuan evaluasi dari kinerja daerah irigasi pada Bendung Panongan dengan cara menganalisis kondisi fisik baik bangunan maupun saluran pada daerah Irigasi Bendung cibendung, menganalisis tenaga pengelola sumber daya manusia pada daerah Irigasi Bendung Panongan, menganalisis Hidrologi curuh hujan pada daerah Irigasi Bendung Panongan, menganalisis debit dari Bendung Panongan ,menganalisis pola tanam pada daerah Irigasi Bendung Panongan dan analisis rencana tanam dan realisasi tanam pada daerah Irigasi Bendung Panongan.Metode yang di gunakan dalam penelitian ini adalah metode kualitatif, dimana dalam pemecahan masalahnya menggambarkan subjek dan atau objek penelitian berdasarkan fakta – fakta yang diperoleh selama penelitian dalam kinerja system irigasi dan usaha mengemukakan hubungan secara mendalam dari aspek – aspek yang diteliti.Kata Kunci: Analisis  Kinerja, Daerah Irigasi ABSTRACTThe purpose of this research is become reference from evaluation performance of the irrigation area in Bendung Panongan by analyzing the physical condition of building although duct in the irrigation area of Bendung Panongan, analyzing of human resource in the irrigation area of Bendung Panongan, analyzing of rain Hydrology in the irrigation area of Bendung Panongan, analyzing of income from Bendung Panongan, analyzing of the patterns plants in the irrigation area of Bendung Panongan, and AKNOP in the irrigation area of Bendung Panongan.The method of this research is qualitative method, in which the fission of the problem is explained that subject or the object research based on the facts which used during doing the research in performance of irrigation system and try to make a good relation in deep from the aspects particularly. Keywords: Performance Analysis , Irrigation Area
ANALISIS MANAJEMEN KONSTRUKSI PROYEK PEMBANGUNAN JEMBATAN UB KALI SUMANTRI STA 441 - 500 s/d STA 441 -800 TOL BATANG - SEMARANG Ahmad Lutfi; Hendra Kurniawan
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 7 No 4 (2018): JURNAL KONSTRUKSI (APRIL 2018)
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v7i4.3906

Abstract

"> ABSTRAKManajemen proyek merupakan proses terpadu dimana individu-individu sebagai bagian dariorganisasi dilibatkan untuk memelihara, mengembangkan, mengembalikan dan menjalankan programdengan menggunakan sumber daya terbatas secara efisien, efektif dan tepat waktu dalam menyelesaikansuatu proyek yang telaah direncanakan, yang kesemuanya diarahkan pada sasaran yang telah ditetapkandan berlangsung terus menerus seiring berjalanya waktu.Penelitian ini dilakukan untuk menganalisa Manajemen konstruksi perencanaan pembangunan UbKali Sumantri Mulai dari menghitung volume, Rencana anggaran biaya, Metode Barchart ,Kurva S, danMenganalisa Critical Path Method. Tujuan dicapai melalui studi Literatur, Pengumpulan data – datateknis, dan peninjauan data berupa gambar bestek.Hasil penelitian menunjukan bahwa Rencana Anggaran Biaya yang dikeluarkan untukpembangunan Ub Kali Sumantrii sebesar Rp. 74.809.419.241Kemudian dengan menggunakan analisaCritical Path Method Penyelesaian Pekerjaan membutuhkan waktu selama 56 minggu.Kata kunci : Manajemen Konstruksi, Volume, RAB, Barchart, Kurva S, Critical Path MethodABSTRACTProject Management is the process by which individuals are the integrated as part of anorganization involved to maintain, develop, control, and work the program by using limited resources inan efficient, effective, and timely in targets has esthabilished and continues over time.This study was conducted to analyze the Construction Management Development Planing UpperBridge Ranging from CalculatesVolume, Budget Plan, Barchart Method, S Curve and Crical PathMethod Analysis. And reviewof data in the from building desain.Research shows that the Budget Plain issued for contruction of a Upper Bridge in the amount ofRP. 74.809.419.241 Then by using Critical Path Method Analysis Completicion Takes as long as 56weeks.Keyword : Construction Management, Volume, RAB, Barchart, S Curve, Critical Path Method.
ANALISIS MANAJEMEN KONSTRUKSI PEMBANGUNAN GEDUNG PRABU SILIWANGI RAWAT INAP KELAS III RSUD GUNUNG JATI CIREBON Soleh Soleh; Hendra Kurniawan
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 7 No 4 (2018): JURNAL KONSTRUKSI (APRIL 2018)
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v7i4.3909

Abstract

"> ABSTRAKManajemen proyek merupakan proses terpadu dimana individu - individu sebagai bagian dariorganisasi dilibatkan untuk memelihara, mengembangkan, mengembalikan dan menjalankan programdengan menggunakan sumber daya terbatas secara efisien, efektif dan tepat waktu dalam menyelesaikansuatu proyek yang telah direncanaka, yang kesemuanya diarahkan pada sasaran yang telah ditetapkan danberlangsung terus menerus seiring berjalannya waktu.Penelitian ini dilakukan untuk menganalisa Manajemen konstruksi perencanaan pembangunanGedung Prabu Siliwangi Rawat Inap Kelas III RSUD Gunung Jati Cirebon Mulai dari menghitungvolume, Rencana anggaran biaya, Metode Barchart , Kurva S, dan Menganalisa Critical Path Method.Tujuan dicapai melalui studi Literatur, Pengumpulan data – data teknis, dan peninjauan data berupagambar bestek.Hasil penelitian menunjukan bahwa Rencana Anggaran Biaya yang dikeluarkan untukpembangunan Gedung Prabu Siliwangi Rawat Inap Kelas III RSUD Gunung Jati Cirebon 4 Lantaisebesar Rp.7.210.908.000 ( Tujuh Milyar Dua Ratus sepuluh Juta Sembilan Ratus Delapan Ribu )Kemudian dengan menggunakan analisa Critical Path Method Penyelesaian Pekerjaan membutuhkanwaktu selama 39 minggu.Kata kunci : Manajemen Konstruksi, Volume, RAB, Barchart, Kurva S, Critical Path MethodABSTRACTProject management is an integrated process in which individuals - individuals as part of anorganization involved to maintain, develop, restore and run the program by using limited resources in anefficient, effective and timely in completing a project that has direncanaka, all of which were directed attargets that have been defined and continuous over time.This study was conducted to analyze the development of Building construction managementplanning Prabu Siliwangi Inpatient Class III Gunung Jati Hospital in Cirebon Starting from calculatingvolume, cost budget plan, method barchart, S curve, and Analyze Critical Path Method. The purpose isachieved through the study of literature, collection of data - technical data, and review data such aspictures guidelines.The results showed that the Budget Plan issued for the construction of King Siliwangi InpatientBuilding Class III Gunung Jati Hospital in Cirebon 4 Floor of Rp.7.210.908.000 (Seven Billion TwoHundred and ten Million Nine Hundred Eight Thousand) Then using Critical Path Method analysis ofCompletion takes as long as 39 weeks.Keywords: Construction Management, Volume, RAB, barchart, S curve, Critical Path Method