Claim Missing Document
Check
Articles

Found 5 Documents
Search

EVALUASI KEANDALAN SISTEM PROTEKSI KEBAKARAN PADA GEDUNG RSUD KOTA BUKITTINGGI Kharisma Permata Sari; Rita Nasmirayanti; Musilatul Habib Arramadhan
JURNAL RIVET Vol 3 No 01 (2023): Juni 2023
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v3i01.889

Abstract

Kebakaran dapat membawa konsekuensi yang berdampak merugikan, banyak pihak, mengakibatkan korban jiwa, kerugian material, hilangnya lapangan pekerjaan dan kerugian lain yang langsung. Maka dari itu perlu adanya system proteksi kebakaran pada sebuah gedung, salah satunya RSUD Kota Bukittinggi. Tujuan penelitian ini untuk menganalisis Nilai Keandalan Sistem Keselamatan Bangunan (NKSKB) terhadap bahaya kebakaran pada gedung RSUD Kota Bukittinggi berdasarakan pedoman teknis PD-T-11-2005-C dengan menggunakan metode AHP dari hasil observasi lapangan. Dari hasil penelitian diketahui bahwa Nilai Keandalan Sistem Keselamatan Bangunan (NKSKB) RSUD Kota Bukittinggi terhadap bahaya kebakaran memperoleh nilai 93.26% dengan keandalan baik (B). Nilai ini masih belums empurna dikarenakan masih ada criteria penilaian yang cukup dan kurang pada komponen sarana penyelamatan dan system proteksiaktif di gedung RSUD Kota Bukittinggi.
ANALISIS TINGKAT KEPUASAN PENGGUNA JASA KONSTRUKSI DENGAN MENGGUNAKAN METODE CUSTOMER SATISFACTION INDEX (CSI) DAN IMPORTANCE PERFORMANCE ANALYSIS (IPA): Submit Jurnal Willy Kurniawan Kurniawan, Willy; Deded Eka Sahputra; Kharisma Permata Sari; Maiyozzi Chairi
Civil Engineering Collaboration Vol. 9 (2024) No. 2
Publisher : Universitas Putra Indonesia YPTK Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35134/jcivil.v9i2.74

Abstract

Kualitas pelayanan merupakan aspek yang sangat pernting diperharikan untuk mempertahankan kosumen. PT. Konstruksi Indonesia Group tugasnya sebagai penyedia jasa di bidang konsruksi bangunan. Penelitian ini bertujuan untuk mengetahui tingkat kepuasan pengguna jasa terhadap penyedia jasa konstruksi dan Menentukan hal-hal yang menjadi prioritas perbaikan terhadap faktor–faktor yang mempengaruhi tingkat kepuasan pengguna jasa penelitian ini 15 variabel kepuasan pengguna jasa konstruksi dengan menggunakan metode Customer Satisfaction Index ( CSI ) dan diagram Importance Performance Analysis ( IPA ). Dari hasil analisis yang dilakukan menunjukan bahwa dari 15 variabel yang diajuka kepada 20 orang responden diperoleh nilai Customer Satisfaction Index (CSI) sebesar 77,53 % yang artinya pengguna jasa “puas” terhadap produk yang di hasilkan penyedia jasa, untuk kinerja dari pengguna jasa nilai Importance Performance Analysis ( IPA ) sebesar 4,45 hal tersebut dapat di katakan bahwa pengguna jasa konstruksi “Sangat Puas” terhadap Pelaksanaan pengawasan dan pengendalian mutu proyek secara terjadwal.
Analisa Perbandingan Rencana Mutu Kontrak (RMK) Antara Penyedia Jasa Dengan Standar Pekerjaan Umum Kharisma Permata Sari; Maiyozzi Chairi; Mediana Desfita; Riki Hendra Faismon4
JURNAL RIVET Vol 4 No 02 (2024): Desember 2024
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v4i02.1799

Abstract

One way that contractors or service providers do to provide satisfaction to customers or service users, by improving the quality of the services offered. One of the applications is to compare the Contract Quality Plan (RMK) Document implemented by contractors or service providers for the Solok City Hospital Development Advanced Project and the Marahadin Laing Football Field Construction Advanced Project. This research method is quantitative with a comparative method that compares two or more of a variable, situation, event, activity or in the form of similarities and differences in planning and implementation. Based on the evaluation of the completeness of the contents of the Contract Quality Plan (RMK) document, the total percent obtained from the evaluation of the completeness of the contents of the Contract Quality Plan Document (RMK) obtained from the Solok City Hospital Construction Continuation Project was 61.90% and the Marahadin Laing Football Field Construction Continuation Project was 54.76%. This assessment is carried out based on the completeness of the contents of the Contract Quality Plan Document which refers to the Contract Quality Plan Document (RMK) which regulates in the Regulation of the Minister of General Employment Number: 04/PRT/M/2009.
Analisis Penyebab Terjadinya Pekerjaan Repair pada PT. Lubuk Minturun Konstruksi Persada (PT. LMKP) Padang Kharisma Permata Sari; Utami Dewi Arman; Mediana Desfita; Rita Nasmirayanti
JURNAL RIVET Vol 5 No 01 (2025): Juni 2025
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v5i01.2066

Abstract

Analisis Fungsi Manajemen Konstruksi Dalam Pembangunan Gedung Komersil Gina Sonia; Mediana Desfita; Rita Nasmirayanti; Kharisma Permata Sari
JURNAL RIVET Vol 5 No 02 (2025): Desember 2025
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v5i02.2456

Abstract

Commercial buildings are buildings that accommodate various commercial functions such as villas, hotels, resorts, trade, rental office space, and others. According to their type, commercial buildings are buildings that are planned and designed to generate profits for both owners and users. Based on this thinking, commercial building design considers nine aspects (Wungow, 2011). Factors that must be considered in the construction of commercial buildings and actions taken so that the construction management function has a significant influence on the success of commercial building construction projects in project development. From its definition, construction management applies management functions to a project by utilizing resources effectively and efficiently to achieve project objectives. The main goal of construction management is to manage management functions effectively and efficiently to obtain optimal results as agreed with the project owner. The selected sampling techniques were Interviews/Questionnaires and Primary Data. In this study, a sample of 25 respondents from several different construction service companies was required. Based on Company Status, company type, company work experience, work equipment aspects, capital/finance, HR (Human Resources). Analysis of construction management factors in commercial building construction, analysis of questionnaire data taken from 25 respondents was processed using Microsoft Office Excel 2010.